Loading...
PA9901-LR001009 CONCRETE COMPRE }IVE STRENGTH TES' nac ENGINEERING, INC. a division of l kerracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 09/05/2000 Report No.: 0023176 Report Date 10/09/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Co ell Texas Carrollton TX 75006 pp Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CO NCRETE SUPPLIER: Pioneer PLACEMENT DATE: 09/05/2000 BATCH TIME: 10:3 PLANT: 27 TIME SAMPLED: 9:3 lam BY: Chris Eubanks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F) - AIR 95 F CONCRETE: 93 F SLUMP: 3 -5" TRUCK NO: 749 TICKET NO: 290484 AIR: 3.0 -6.0% AIR CONTENT (%): 5.8 UNIT WEIGHT (pct): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: Paving: Pump house - sidewalk in front of stands on fields 1 & 2, sidewalk between soccer fields ASTM C -172 1 & 2 and on the W side & S side of field 2 ASTM C -39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 6.75 09/12/2000 7 65820 2330 1 2 6.75 09/12/2000 7 66710 2360 Average 2350 1 3 6.75 10/03/2000 28 98660 3490 1 4 6.75 10/03/2000 28 102420 3620 Average 3560 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 1 of 4 Report No.: 0023176 Sample location: Paving- pump house, 10' W of pump house and 10' N of S edge, soccer fields 1 & 2 on the W side & S side of field 2 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OlLL Page 2 of 4 CONCRETE COMPRE DIVE STRENGTH TEST 1 ENGINEERING, INC. a division of 1r.nacOn 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 09/05/2000 Report No.: 0023176 Report Date 10/09/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Co ell Texas Carrollton TX 75006 pp Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw Mix I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 09/05/2000 BATCH TIME: 1:OOpm PLANT: 27 TIME SAMPLED: 1 :3Opm BY: Chris Eubanks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, hot STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F) - AIR 101 F CONCRETE: 91 F SLUMP: 3 -5" TRUCK NO: 758 TICKET NO: 690497 AIR: 3.0 -6.0% AIR CONTENT ( %): 6.0 UNIT WEIGHT (pci): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: See page 1 ASTM C -172 ASTM C -39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 6.00 09/12/2000 7 83430 2950 2 2 6.00 09/12/2000 7 84810 3000 Average 2980 2 3 6.00 10/03/2000 28 111420 3940 2 4 6.00 10/03/2000 28 108750 3850 Average 3900 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. o1LL Page 3 of 4 Report No.: 0023176 MIMEOS,. 1•C Sample location: Behind field 2, 20' E of W storm drain & 3' N of S edge Technician: Chris Eubanks Started: 9:30am Finished: 3:OOpm At. ngin • erin , Inc. Report Distribution: � g g (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. Eric J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 4 of 4 CONCRETE COMPRE SIVE STRENGTH TES' HE ENGINEERING, INC. a division of 1rPim ccn 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 09/20/2000 Report No.: 0024673 Report Date 10/09/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX LD.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 09/20/2000 BATCH TIME: N/A PLANT: 27 TIME SAMPLED: 10:35am BY: Albert Garcia SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F) - AIR 88 F CONCRETE: 85 F SLUMP: 3 -5" TRUCK NO: 648 TICKET NO: 687494 AIR: 3 -6% AIR CONTENT ( %): N/A UNIT WEIGHT (pet): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: Paving -See attached sketch ASTM C -172 ASTM C -39 SAMPLE LOCATION: See attached sketch REPORT OF TESTS ACCUMULATIVE YARDS: 20 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.50 09/27/2000 7 78150 2760 1 2 5.50 09/27/2000 7 75310 2660 Average 2710 1 3 5.50 10/18/2000 28 1 4 5.50 10/18/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01ss Page 1 of 2 mu, CONCRETE COMPRE SIVE STRENGTH TES ENGINEERING, INC. a division of lferyacon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 09/20/2000 Report No.: 0024673 Report Date 10/09/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Co ell Texas Carrollton TX 75006 pp Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 09/20/2000 BATCH TIME: 1 :3Opm PLANT: 27 TIME SAMPLED: 2:OOpm BY: Albert Garcia SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3500 psi @, 28 Days TEMPERATURE (F) - AIR 88 F CONCRETE: 87 F SLUMP: 3 -5" TRUCK NO: 103 TICKET NO: 663994 AIR: 3 -6% AIR CONTENT ( %): N/A UNIT WEIGHT (pct): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: See page 1. ASTM C -172 ASTM C -39 SAMPLE LOCATION: See attached sketch REPORT OF TESTS ACCUMULATIVE YARDS: 120 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE 2 1 6.00 09/27/2000 7 56150 1990 2 2 6.00 09/27/2000 7 62900 2220 Average 2110 2 3 6.00 10/18/2000 28 2 4 6.00 10/18/2000 28 Technician: Albert Garcia Started: 9:30am Finished: 3:OOpm / Report Distribution: �j: • eering, Inc. (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. Eric J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. u1Ss Page 2 of 2 a/cV b i ''/IM uoGN-, v O ) O ) � I Cjiw 0 r t - it • iii t - _ f z x- », � - 3 [ i c driliff-----,.... 1.1.------_- J iii . �+• R___ y,.. {f .f�� . __ .... - ^- r " ill -_ / 1 . . . . . ... . , _ . . . 0 . , . ,,,- c _ _ _ . , l \ / . ,.