PA9901-LR001002 CONCRETE COMPRE LIVE STRENGTH TES'
ENGINEERING, INC.
a division of 16
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 08/29/2000 Report No.: 0022601 Report Date
10/02/2000
Client No.: 36503000 Project No.: 94001043
Client: Hisaw & Associates Project: Wagon Wheel Park
Attn: Bill Morgan 154 S. State Road
3116 Kellway Dr., Suite 116
Carrollton TX 75006 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive
strength samples.
PROJECT DATA
CONTRACTOR: Hisaw MIX LD.: 9339
CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 08/29/2000 BATCH TIME: 10:2Oam
PLANT: 29 TIME SAMPLED: 1 1:0 lam BY: Greg Dimock
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear
STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F) - AIR 87 F CONCRETE: 91 F
SLUMP: 5.0" Max TRUCK NO: 1880 TICKET NO: 663326
AIR: 3 -5% AIR CONTENT ( %): 3.1 UNIT WEIGHT (pct): N/A
TEST METHOD: ASTM C -143 PLACEMENT LOCATION:
ASTM C -172 Field #2 grandstand foundation
ASTM C -39 Sampled from truck.
SAMPLE LOCATION: See placement location
REPORT OF TESTS ACCUMULATIVE YARDS: 10
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psl) TYPE
1 1 6.25 09/05/2000 7 66940 2370
1 2 6.25 09/05/2000 7 73990 2620
Average 2500
1 3 6.25 09/26/2000 28 95440 3370
1 4 6.25 09/26/2000 28 103630 3660
Average 3520
Technician: Greg Dimock Started: 9:30am Finished: 11:30arri
ngi�1eerin g , Inc.
Report Distribution: e7-
( 1 ) Hisaw & Associates
(1) City of Coppell - Engineering Dept. Eric J. Cleveland, P.E.
Senior Project Engineer
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page l of 1