Loading...
PA9901-LR001002 CONCRETE COMPRE LIVE STRENGTH TES' ENGINEERING, INC. a division of 16 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/29/2000 Report No.: 0022601 Report Date 10/02/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX LD.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 08/29/2000 BATCH TIME: 10:2Oam PLANT: 29 TIME SAMPLED: 1 1:0 lam BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F) - AIR 87 F CONCRETE: 91 F SLUMP: 5.0" Max TRUCK NO: 1880 TICKET NO: 663326 AIR: 3 -5% AIR CONTENT ( %): 3.1 UNIT WEIGHT (pct): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C -172 Field #2 grandstand foundation ASTM C -39 Sampled from truck. SAMPLE LOCATION: See placement location REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psl) TYPE 1 1 6.25 09/05/2000 7 66940 2370 1 2 6.25 09/05/2000 7 73990 2620 Average 2500 1 3 6.25 09/26/2000 28 95440 3370 1 4 6.25 09/26/2000 28 103630 3660 Average 3520 Technician: Greg Dimock Started: 9:30am Finished: 11:30arri ngi�1eerin g , Inc. Report Distribution: e7- ( 1 ) Hisaw & Associates (1) City of Coppell - Engineering Dept. Eric J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page l of 1