Loading...
PA9901-LR000913 CONCRETE COMPRJSIVE STRENGTH TEL 2 fir ENGINEERING, INC. a division of 1Ierracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/28/2000 Report No.: 0022512 Report Date 09/13/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Coppell, Texas Carrollton TX 75006 pp Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 08/28/2000 BATCII TIME: 9:38am PLANT: 29 TIME SAMPLED: 10:4Oam BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F) - AIR 88 F CONCRETE: 90 F SLUMP: 5.0" max TRUCK NO: 1029 TICKET NO: 663266 AIR: 3 -5% AIR CONTENT ( %): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: Bleacher foundtion for playing field #1 ASTM C -172 ASTM C -39 Sampled from truck. SAMPLE LOCATION: South end REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.25 09/04/2000 7 79250 2800 1 2 5.25 09/04/2000 7 77130 2730 Average 2770 1 3 5.25 09/25/2000 28 1 4 5.25 09/25/2000 28 Technician: Greg Dimock Started: 10:OOam Finished: 12:OOpm . r • r Engineering, Inc. Report Distribution: (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. Eric J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 1 of 1 CONCRETE COMPR1_.3SIVE STRENGTH TEL, H3C HE ENGINEERING, INC. a division of lFerracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 09/05/2000 Report No.: 0023176 Report Date 09/13/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 09/05/2000 BATCH TIME: 10:3Oam PLANT: 27 TIME SAMPLED: 9:3 lam BY: Chris Eubanks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F) - AIR 95 F CONCRETE: 93 F SLUMP: 3 -5" TRUCK NO: 749 TICKET NO: 290484 AIR: 3.0 -6.0% AIR CONTENT ( %): 5.8 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: Paving: Pump house - sidewalk in front of stands on fields 1 & 2, sidewalk between soccer ASTM C -172 fields 1 & 2 and on the W side & S side of field 2 ASTM C -39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 6.75 09/12/2000 7 65820 2330 1 2 6.75 09/12/2000 7 66710 2360 Average 2350 1 3 6.75 10/03/2000 28 1 4 6.75 10/03/2000 28 Sample location: Paving- pump house, 10' W of pump house and 10' N of S edge, soccer fields 1 & 2 on the W side & S side of field 2 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Pagelof2 CONCRETE COMPRi JSIVE STRENGTH TEL ENGINEERING, INC. a division of lFerracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 09/05/2000 Report No.: 0023176 Report Date 09/13/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 09/05/2000 BATCH TIME: 1 :OOpm PLANT: 27 TIME SAMPLED: 1:3Opm BY: Chris Eubanks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, hot STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F) - AIR 101 F CONCRETE: 91 F SLUMP: 3 -5" TRUCK NO: 758 TICKET NO: 690497 AIR: 3.0 -6.0% AIR CONTENT ( %): 6.0 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C -172 See page 1 ASTM C -39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 6.00 09/12/2000 7 83430 2950 2 2 6.00 09/12/2000 7 84810 3000 Average 2980 2 3 6.00 10/03/2000 28 2 4 6.00 10/03/2000 28 Sample location: Behind field 2, 20' E of W storm drain & 3' N of S edge Technician: Chris Eubanks Started: 9:30am Finished: 3:OOpm pli % Report Distribution: ' nglneering, Inc. (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. Eric J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 2 of 2 CONCRETE COMPRL,iSIVE STRENGTH TE 2 lir ENGINEERING, INC. a division of lferracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/29/2000 Report No.: 0022601 Report Date 09/13/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 08/29/2000 BATCH TIME: 10:2Oam PLANT: 29 TIME SAMPLED: 11:Ol BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F) - AIR 87 F CONCRETE: 91 F SLUMP: 5.0" Max TRUCK NO: 1880 TICKET No: 663326 AIR: 3 -5% AIR CONTENT ( %): 3.1 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: Field #2 grandstand foundation ASTM C -172 ASTM C -39 Sampled from truck. SAMPLE LOCATION: See placement location REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 6.25 09/05/2000 7 66940 2370 1 2 6.25 09/05/2000 7 73990 2620 Average 2500 1 3 6.25 09/26/2000 28 1 4 6.25 09/26/2000 28 Technician: Greg Dimock Started: 9:30am Finished: 11:30am � I Report Distribution: ` Engineering, Inc. (1) Hisaw & Associates / (1) City of Coppell - Engineering Dept. Eric J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page l of 1