PA9901-LR000627 CONCRETE COMPRELJ IVE STRENGTH TES „ Fir
ENGINEERING, INC.
a division of lrerracon
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 05/25/2000 Report No.: 0013854 Report Date
06/27/2000
Client No.: 36503000 Project No.: 94001043
Client: Hisaw & Associates Project: Wagon Wheel Park
Attn: Bill Morgan 154 S. State Road
3116 Keliway Dr., Suite 116 Coppell, Texas
Carrollton TX 75006 pp
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Hisaw MIX I.D.: 9339
CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 05/25/2000 BATCH TIME: N/A
PLANT: 22 TIME SAMPLED: 8:44am BY: Mario Garcia
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cool
STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F) - AIR 84 F CONCRETE: 89 F
SLUMP: 4 -6" TRUCK NO: 1824 TICKET NO: 568083
AIR: N/A AIR CONTENT ( %): N/A UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C -143 PLACEMENT LOCATION:
Sidewalk on S side of site
ASTM C -172
ASTM C -39
SAMPLE LOCATION: 105' W of SE corner
REPORT OF TESTS ACCUMULATIVE YARDS: 20
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 6.00 06/01/2000 7 72430 2560
1 2 6.00 06/01/2000 7 71800 2540
Average 2550
1 3 6.00 06/22/2000 28 99310 3510
1 4 6.00 06/22/2000 28 100870 3570
Average 3540
Technician: Mario Garcia Started: 7:OOam Finished: 9:30am ■•
Report Distribution: Engineering, Inc.
(1) Hisaw & Associates
(1) City of Coppell - Engineering Dept. E ric J. Cleveland, P.E.
Senior Project Engineer
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 1 of 1