Loading...
PA9901-LR000627 CONCRETE COMPRELJ IVE STRENGTH TES „ Fir ENGINEERING, INC. a division of lrerracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/25/2000 Report No.: 0013854 Report Date 06/27/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Keliway Dr., Suite 116 Coppell, Texas Carrollton TX 75006 pp Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 05/25/2000 BATCH TIME: N/A PLANT: 22 TIME SAMPLED: 8:44am BY: Mario Garcia SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cool STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F) - AIR 84 F CONCRETE: 89 F SLUMP: 4 -6" TRUCK NO: 1824 TICKET NO: 568083 AIR: N/A AIR CONTENT ( %): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: Sidewalk on S side of site ASTM C -172 ASTM C -39 SAMPLE LOCATION: 105' W of SE corner REPORT OF TESTS ACCUMULATIVE YARDS: 20 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 6.00 06/01/2000 7 72430 2560 1 2 6.00 06/01/2000 7 71800 2540 Average 2550 1 3 6.00 06/22/2000 28 99310 3510 1 4 6.00 06/22/2000 28 100870 3570 Average 3540 Technician: Mario Garcia Started: 7:OOam Finished: 9:30am ■• Report Distribution: Engineering, Inc. (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. E ric J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1