Loading...
PA9901-LR000623 CONCRETE COMPRE,AVE STRENGTH TES' ][13,1 ENGINEERING, INC. a division of 1I rracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/24/2000 Report No.: 0013775 Report Date 06/23/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 44 CONCRETE SUPPLIER: Lattimore PLACEMENT DATE: 05/24/2000 BATCH TIME: 2:24pm PLANT: 3 TIME SAMPLED: 3:1Spm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 93 F CONCRETE: 90 F SLUMP: 5.0" Max TRUCK NO: 1096 TICKET NO: 104642 AIR: 3-6% AIR CONTENT ( %): 3.8 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: Inlets- 2 @ S end of project & 1 @ N end ASTM C -172 ASTM C -39 Sampled from truck. Technician Time: See Report #0013725 SAMPLE LOCATION: SW inlet REPORT OF TESTS ACCUMULATIVE YARDS: 7 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 4.75 05/31/2000 7 103180 3650 1 2 4.75 05/31/2000 7 100350 3550 Average 3600 1 3 4.75 06/21/2000 28 111410 3940 1 4 4.75 06/21/2000 28 111940 3960 Average 3950 Technician: Greg Dimock Started: Finished: 4 • Report Distribution: ng Inc. (1) Hisaw & Associates � (1) City of Coppell - Engineering Dept. Eric J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1 CONCRETE COMPREc IVE STRENGTH TEST Hi....: ENGINEERING, INC. a division of 1rerracnn 8901 Carpenter Envy., Suite #100 Dallas, Texas 75247 Date of Service: 05/24/2000 Report No.: 0013725 Report Date 06/23/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Co ell Texas Carrollton TX 75006 pp Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 05/24/2000 BATCH TIMME: 1 1:OOan1 PLANT: 27 TIME SAMPLED: 1 1:4Oam BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi a@ 28 Days TEMPERATURE (F) - AIR 92 F CONCRETE: 92 F SLUMP: 5.0" Max TRUCK NO: 653 TICKET NO: 508375 AIR: 3 -5% AIR CONTENT ( %): 4.5 UNIT WEIGHT (pct): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: Fire Lane- S entrance drive & approach & parking final pour ASTM C -172 ASTM C -39 SAMPLE LOCATION: 25' E of W joint & 10' N of S curb REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (Inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.25 05/31/2000 7 74160 2620 1 2 5.25 05/31/2000 7 80440 2840 Average 2730 1 3 5.25 06/21/2000 28 109800 3880 1 4 5.25 06/21/2000 28 105400 3730 Average 3810 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 1 of 3 I CONCRETE COMPREF WE STRENGTH TEST 1 ENGINEERING, INC. a division of 1rerracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 05/24/2000 Report No.: 0013725 06/23/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellwav Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: 1 - Iisaw MIX LD.: 9339 CONCRETE SI iPPLIER: Pioneer PLACEMENT DATE: 05/24/2000 BATCH TIME: 1:09pni PLANT: 27 TIME SAMPLED: 1:45pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi (Ci 28 Days TEMPERATURE (F) - AIR 93 F CONCRETE: 90 F SLUMP: 5.0" Max TRUCK NO: 745 TICKET NO: 508395 AIR: 3 -5% AIR CONTENT ( %): 4.2 UNIT WEIGHT (pct): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: See page 1 ASTM C -172 ASTM C -39 SAMPLE LOCATION: 10' E of W curb & 50' N of S joint REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 5.00 05/31/2000 7 90210 3190 2 2 5.00 05/31/2000 7 88460 3130 Average 3160 2 3 5.00 06/21/2000 28 109770 3880 2 4 5.00 06/21/2000 28 109120 3860 Average 3870 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. hiLL Page 2 of 3 JELL CONCRETE COMPREE IVE STRENGTH TEST ENGINEERING, INC. a division of irenaCOn 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 05/24/2000 Report No.: 0013725 06/23/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIS 1.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 05/24/2000 BATCII TIME: 2:O3pm PLANT: 27 TIME SAMPLED: 2:40pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 95 F CONCRETE: 92 F SLUMP: 5.0" Max TRUCK NO: 44 TICKET NO: 508404 AIR: 3 -5% AIR CONTENT (pia): 3.8 UNIT WEIGHT (pet): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: See page 1 ASTM C -172 ASTM C -39 SAMPLE LOCATION: 2' S & 20' W of NW corner -North Lan REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 5.75 05/31/2000 7 67320 2380 3 2 5.75 05/31/2000 7 74890 2650 Average 2520 3 3 5.75 06/21/2000 28 107400 3800 3 4 5.75 06/21/2000 28 101450 3590 Average 3700 Technician: Greg Dimock Started: 10:OOam Finished: 5 :OOpm i P. 1 Report Distribution: /� ' Engineering, Inc. (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. Eric J. Cleveland. P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 3 of 3