PA9901-LR000613 CONCRETE COMPREF - IVE STRENGTH TEST
ti jL...
ENGINEERING, INC.
a division of 1Ferracnn
8901 Carpenter Frwy., Suite 0100
Dallas, Texas 75247
Report Date
Date of Service: 06/01/2000 Report No.: 0014388 06/13/2000
Client No.: 36503000 Project No.: 94001043
Client: Hisaw & Associates Project: Wagon Wheel Park
Attn: Bill Morgan 154 S. State Road
3116 Kellway Dr., Suite 116
Carrollton TX 75006 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive
strength samples.
PROJECT DATA
CONTRACTOR: Hisaw MIX I.D.: 9339
CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 06/01/2000 BATCH TIME: 1 1:OOam
PLANT: 29 TIME SAMPLED: 12:O0pm BY: Steve Campbell
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy
STRENGTH: 3500 psi rcij 28 Days TEMPERATURE (F) - AIR 84 F CONCRETE: 88 F
SLUMP: 5.0" Max TRUCK NO: 5 1 TICKET NO: 535516
AIR: N/A AIR CONTENT ( %): N/A UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C -143 PLACEMENT LOCATION:
Phase I concession stand
ASTM C -172
ASTM C -39
SAMPLE LOCATION: 5' S x 30' W from NE of slab
REPORT OF TESTS ACCUMULATIVE YARDS: 10
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 7.50 06/08/2000 7 64500 2280
1 2 7.50 06/08/2000 7 66560 2350
Average 2320
1 3 7.50 06/29/2000 28
1 4 7.50 06/29/2000 28
Technician: Steve Campbell
Started: 10 :OOam Finished: 3:OOpm i � � ,
Report Distribution:
(1) Hisaw & Associates n sneering, Inc.
/
(1) City of Coppell - Engineering Dept. Eric J. Cleveland, P.E.
Senior Project Engineer
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of !IBC Engineering, Inc.
OILL Pagelofl