Loading...
PA9901-LR000603 CONCRETE COMPRES' - VE STRENGTH TEST fli, ENGINEERING, INC. a division of 1rerracan 8901 Carpenter Frwy., Suite #100 Dalks, Texas 75247 Report Date Date of Service: 05/23/2000 Report No.: 0013666 06/03/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 44 CONCRETE SUPPLIER: Lattimore PLACEMENT DATE: 05/23/2000 BATCH TIME: 2:14pm PLANT: 7 TIME SAMPLED: 3:OOpm BY: Joey Gordon SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi 28 Days TEMPERATURE (F) - AIR 96 F CONCRETE: 92 F SLUMP: 3.0" Max TRUCK NO: 947 TICKET NO: 7087444 AIR: NIA AIR CONTENT ( %): N/A UNIT WEIGHT (pct): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: Inlets in parking lot ASTM C -172 ASTM C -39 SAMPLE LOCATION: NW corner of parking lot inlet REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE 1 1 3.00 05/30/2000 7 103560 3660 1 2 3.00 05/30/2000 7 102330 3620 Average 3640 1 3 3.00 06/20/2000 28 1 4 3.00 06/20/2000 28 Technician: Joey Gordon Started: 2 :00pm Finished: 4:OOpm -; Report Distribution: ng Inc. (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. / c J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1 C3NCRETE COMPRES IVE STRENGTH TEST Hi: ENGINEERING, INC. a division of Werrac n 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 05/24/2000 Report No.: 0013725 06/03/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 05/24/2000 BATCH TIME: 1 1:OOam PLANT: 27 TIME SAMPLED: 11 :4Oam BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 92 F CONCRETE: 92 F SLUMP: 5.0" Max TRUCK NO: 653 TICKET NO: 508375 AIR: 3 -5% AIR CONTENT ( %): 4.5 UNIT WEIGHT (pct): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: Fire Lane- S entrance drive & approach & parking final pour ASTM C -172 ASTM C -39 SAMPLE LOCATION: 25' E of W joint & 10' N of S curb REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.25 05/31/2000 7 74160 2620 1 2 5.25 05/31/2000 7 80440 2840 Average 2730 1 3 5.25 06/21/2000 28 1 4 5.25 06/21/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 3 CONCRETE COMPRES WE STRENGTH TEST 1 ENGINEERING, INC. a division of Uerracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/24/2000 Report No.: 0013725 Report Date 06/03/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 05/24/2000 BATCH TIME: 1:O9pm PLANT: 27 TIME SAMPLED: 1:45pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 93 F CONCRETE: 90 F SLUMP: 5.0" Max TRUCK NO: 745 TICKET NO: 508395 AIR: 3 -5% AIR CONTENT ( %): 4.2 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C -172 See page 1 ASTM C -39 SAMPLE LOCATION: 10' E of W curb & 50' N of S joint REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 5.00 05/31/2000 7 90210 3190 2 2 5.00 05/31/2000 7 88460 3130 Average 3160 2 3 5.00 06/21/2000 28 2 4 5.00 06/21/2000 28 I This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of RFC Engineering, Inc. OILL Page 2 of 3 CONCRETE COMPRES IVE STRENGTH TEST ENGINEERING, INC. a division of lferracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 05/24/2000 Report No.: 0013725 06/03/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw mix I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 05/24/2000 BATCH TIME: 2:03pm PLANT: 27 TIME SAMPLED: 2:4Opm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi ,C 28 Days TEMPERATURE (F) - AIR 95 F CONCRETE: 92 F SLUMP: 5.0" Max TRUCK NO: 44 • TICKET NO: 508404 AIR: 3 -5% AIR CONTENT ( %): 3.8 UNIT WEIGHT (pct): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: See page I ASTM C -172 ASTM C -39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 5.75 05/31/2000 7 67320 2380 3 2 5.75 05/31/2000 7 74890 2650 Average 2520 3 3 5.75 06/21/2000 28 3 4 5.75 06/21/2000 28 Sample location: 2' S of N curb & 20' W of street in S entry drive- N lane Technician: Greg Dimock Started: 10:O0am Finished: 5:OOpm Report Distribution: • • • ring, Inc. (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. Eric J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 011LL Page 3 of 3