Loading...
PA9901-LR000601 CONCRETE COMPREL 3IVE STRENGTH TES _ Fir ENGINEERING, INC. a division of l 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/24/2000 Report No.: 0013775 Report Date 06/01/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 44 CONCRETE SUPPLIER: Lattimore PLACEMENT DATE: 05/24/2000 BATCH TIME: 2:24pm PLANT: 3 TIME SAMPLED: 3:1Spm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 93 F CONCRETE: 90 F SLUMP: 5.0" Max TRUCK NO: 1096 TICKET NO: 104642 AIR: 3 -6% AIR CONTENT ( %): 3.8 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: Inlets- 2 @ S end of project & 1 @ N end ASTM C -172 ASTM C -39 Sampled from truck. Technician Time: See Report #0013725 SAMPLE LOCATION: SW inlet REPORT OF TESTS ACCUMULATIVE YARDS: 7 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 4.75 05/31/2000 7 103180 3650 1 2 4.75 05/31/2000 7 100350 3550 Average 3600 1 3 4.75 06/21/2000 28 1 4 4.75 06/21/2000 28 Technician: Greg Dimock Started: Finished: r'-gin ing, Inc. Report Distribution: (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. ric J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 1 of 1