Loading...
PA9901-LR000531 CONCRETE COMPRE,v 3IVE STRENGTH TES ENGINEERING, INC. a division of lferracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/22/2000 Report No.: 0013519 Report Date 05/31/2000 Client No.: 36503000 Project No.: 94001043 • Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 44 CONCRETE SUPPLIER: Lattimore PLACEMENT DATE: 05/22/2000 BATCH TIME: 2:34pm PLANT: 7 TIME SAMPLED: 3: IOpm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 95 F CONCRETE: 89 F SLUMP: 5.0" Max TRUCK NO: 958 TICKET NO: 7087372 AIR: 3-5% AIR CONTENT ( %): 3.6 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: Inlets at S firelane one (1) at E end & one (1) at W end ASTM C -172 ASTM C -39 Sampled from truck. Technician Time: See Report #0013511 SAMPLE LOCATION: Inlet at E end REPORT OF TESTS ACCUMULATIVE YARDS: 3 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 3.25 05/29/2000 7 88200 3120 1 2 3.25 05/29/2000 7 84810 3000 Average 3060 1 3 3.25 06/19/2000 28 1 4 3.25 06/19/2000 28 Technician: Greg Dimock Started: Finished: v 4 / . neering, Inc. Report Distribution: ngl (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. Er J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1 CONCRETE COMPREL,SIVE STRENGTH TES. 1 ENGINEERING, INC. a division of lferracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 1 Date of Service: 05/22/2000 Report No.: 0013511 Report Date 05/31/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 05/22/2000 BATCH TIME: 11:34am PLANT: 29 TIME SAMPLED: 12:OOpm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 90 F CONCRETE: 89 F SLUMP: 5.0" Max TRUCK NO: 80 TICKET NO: 535125 AIR: 3-5% AIR CONTENT ( %): 4.2 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C-172 Paving- S parking lot -pour #2 ASTM C -39 Sampled from truck. SAMPLE LOCATION: 40' E of W joint & 10' N of S curb REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.25 05/29/2000 7 97790 3460 1 2 5.25 05/29/2000 7 100350 3550 Average 3510 1 3 5.25 06/19/2000 28 1 4 5.25 06/19/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page l of 4 CONCRETE COMPRE,vlIVE STRENGTH TES_ FPC ENGINEERING, INC. a division of llerracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/22/2000 Report No.: 0013511 Report Date 05/31/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 05/22/2000 BATCH TIME: 12:47pm PLANT: 29 TIME SAMPLED: 1:15pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 90 F CONCRETE: 90 F SLUMP: 5.0" Max TRUCK NO: 80 TICKET NO: 535132 AIR: 3 -5% AIR CONTENT (%): 4.3 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C -172 See page 1 ASTM C -39 Sampled from pump. SAMPLE LOCATION: S0' E of W joint & 5' N of S curb REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE 2 1 5.00 05/29/2000 7 79130 2800 2 2 5.00 05/29/2000 7 84810 3000 Average 2900 2 3 5.00 06/19/2000 28 2 4 5.00 06/19/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 2 of 4 CONCRETE COMPRE.SIVE STRENGTH TES .a. f PC ENGINEERING, INC. a division of lferracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/22/2000 Report No.: 0013511 Report Date 05/31/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Co ell, Texas Carrollton TX 75006 PP Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIx I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 05/22/2000 BATCH TIME: 2:45pm PLANT: 29 TIME SAMPLED: 3:30pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 92 F CONCRETE: 89 F SLUMP: 5.0" Max TRUCK NO: 1824 TICKET NO: 567968 AIR: 3 -5% AIR CONTENT ( %): 4.0 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C -172 See page 1 ASTM C -39 Sampled from pump. SAMPLE LOCATION: 130' E of W joint & 3' N of S curb REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 5.50 05/29/2000 7 95860 3390 3 2 5.50 05/29/2000 7 97240 3440 Average 3420 3 3 5.50 06/19/2000 28 3 4 5.50 06/19/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 3 of 4 CONCRETE COMPRE. 3IVE STRENGTH TES_ FPC ENGINEER , INC. a division of 1rerracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/22/2000 Report No.: 0013511 Report Date 05/31/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Co ell, Texas Carrollton TX 75006 PP Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 05/22/2000 BATCH TIME: 4:OOpm PLANT: 29 TIME SAMPLED: 4:3Opm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 96 F CONCRETE: 91 F SLUMP: 5.0" Max TRUCK NO: 648 TICKET NO: 535144 AIR: 3 -5% AIR CONTENT ( %): 4.7 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C -172 See page 1 ASTM C -39 Sampled from pump. SAMPLE LOCATION: 50' W of E joint & 5' N of S curb REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 4.75 05/29/2000 7 80150 2830 4 2 4.75 05/29/2000 7 83670 2960 Average 2900 4 3 4.75 06/19/2000 28 4 4 4.75 06/19/2000 28 Technician: Greg Dimock Started: Finished: / Report Distribution: Engineering, Inc. (1) Hisaw & Associates / (1) City of Coppell - Engineering Dept. Eric J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 4 of 4 CONCRETE COMPRELJ ,IVE STRENGTH TES }-13C Y HE ENGINEERING, INC. a division of l 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/21/2000 Report No.: 0010683 Report Date 05/31/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/20/2000 BATCH TIME: 12:12pm PLANT: 27 TIME SAMPLED: 12:40pm BY: Terry L. Smith SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, Warm STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F) - AIR 80 F CONCRETE: 77 F SLUMP: 4 -5 TRUCK NO: 836 TICKET NO: 506266 AIR: 3 -6% AIR CONTENT ( %): 3.9 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: Paving 120' east, 20' south of northeast corner of the southside ASTM C -172 baseball field ASTM C -39 SAMPLE LOCATION: See placement location REPORT OF TESTS ACCUMULATIVE YARDS: 30 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE 1 1 5.00 04/27/2000 7 104480 3690 1 2 5.00 04/27/2000 7 106570 3770 Average 3730 1 3 5.00 05/18/2000 28 115410 4080 1 4 5.00 05/18/2000 28 116320 4110 Average 4100 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of l -IBC Engineering, Inc. 01LL Page 1 of 3 CONCRETE COMPRELJ3IVE STRENGTH TES H3C Fir ENGINEERING, INC. a division of 1I rracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/21/2000 Report No.: 0010683 Report Date 05/31/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/20/2000 BATCH TIME: 12:48pm PLANT: 27 TIME SAMPLED: 1:4Opm BY: Terry L. Smith SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, warm STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F) - AIR 82 F CONCRETE: 79 F SLUMP: 4 -5" TRUCK NO: 924 TICKET NO: 506274 AIR: 3 -6% AIR CONTENT ( %): 4.0 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: Paving 135' east of northeast corner of southside baseball field ASTM C -172 ASTM C -39 SAMPLE LOCATION: See placement location REPORT OF TESTS ACCUMULATIVE YARDS: 80 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 4.00 04/27/2000 7 124270 4390 2 2 4.00 04/27/2000 7 119640 4230 Average 4310 2 3 4.00 05/18/2000 28 132800 4700 2 4 4.00 05/18/2000 28 137440 4860 Average 4780 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 2 of 3 CONCRETE COMPRE,,SIVE STRENGTH TES ENGINEERING, INC. a division of lI rracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 ■ Date of Service: 04/21/2000 Report No.: 0010683 Report Date 05/31/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/20/2000 BATCH TIME: 2:03pm PLANT: 27 TIME SAMPLED: 3:15pm BY: Terry L. Smith SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, warm STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F) - AIR F CONCRETE: F SLUMP: 4 -5 TRUCK NO: 653 TICKET NO: 506280 AIR: 3 -6% AIR CONTENT ( %): 4.2 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: Paving- 45' E, 15' of northeast corner of the southside baseball field ASTM C -172 ASTM C -39 SAMPLE LOCATION: See placement location REPORT OF TESTS ACCUMULATIVE YARDS: 140 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 4.75 04/27/2000 7 108800 3850 3 2 4.75 04/27/2000 7 103770 3670 Average 3760 3 3 4.75 05/18/2000 28 122730 4340 3 4 4.75 05/18/2000 28 123910 4380 Average 4360 Technician: Terry L. Smith Started: 10:00am Finished: 6:OOpm n Report Distribution: "' g ineeri g , Inc. (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. E is J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 3 of 3