Loading...
PA9901-LR000530 CONCRETE COMPREoSIVE STRENGTH TES 1 �3C ENGINEERING, INC. a division of lFerracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/18/2000 Report No.: 0013174 Report Date 05/30/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Co ell, Texas Carrollton TX 75006 pp Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 38 CONCRETE SUPPLIER: Lattimore PLACEMENT DATE: 05/18/2000 BATCH TIME: 8:29am PLANT: 7 TIME SAMPLED: 9:3Oam BY: Steve Campbell SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 77 F CONCRETE: 82 F SLUMP: 5.0" Max TRUCK NO: 755 TICKET NO: 7087231 AIR: 3 -6% AIR CONTENT ( %): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C -172 Pump House Road ASTM C -39 SAMPLE LOCATION: Sta. 6 +53.19 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 2.00 05/25/2000 7 90010 3180 1 2 2.00 05/25/2000 7 84810 3000 Average 3090 1 3 2.00 06/15/2000 28 1 4 2.00 06/15/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 3 CONCRETE COMPREsSIVE STRENGTH TES's Fl ENGINEERING, INC. a division of 1rerracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/18/2000 Report No.: 0013174 Report Date 05/30/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Co ell, Texas Carrollton TX 75006 pp Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 38 CONCRETE SUPPLIER: Lattimore PLACEMENT DATE: 05/18/2000 BATCH TIME: 9:45am PLANT: 7 TIME SAMPLED: 10:3Oam BY: Steve Campbell SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy, windy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 77 F CONCRETE: 83 F SLUMP: 5.0" Max TRUCK NO: 1 103 TICKET NO: 7087243 AIR: 3 -6% AIR CONTENT ( %): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C -172 seepage 1 ASTM C -39 SAMPLE LOCATION: Sta. 3 +33.98 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 2.00 05/25/2000 7 93930 3320 2 2 2.00 05/25/2000 7 97530 3450 Average 3390 2 3 2.00 06/15/2000 28 2 4 2.00 06/15/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page2of3 CONCRETE COMPRE6SIVE STRENGTH TES'k ENGINEERING, INC. a division of l 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/18/2000 Report No.: 0013174 Report Date 05/30/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Keliway Dr., Suite 116 Coppell, Texas Carrollton TX 75006 pp Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 38 CONCRETE SUPPLIER: Lattimore PLACEMENT DATE: 05/18/2000 BATCH TIME: 10:49am PLANT: 7 TIME SAMPLED: 11:45am BY: Steve Campbell SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: partly cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 83 F CONCRETE: 85 F SLUMP: 5.0" Max TRUCK NO: 938 TICKET NO: 7087257 AIR: 3 -6% AIR CONTENT ( %): N/a UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C -172 See page 1 ASTM C -39 SAMPLE LOCATION: Sta. 1 +57.18 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 4.00 05/25/2000 7 96220 3400 3 2 4.00 05/25/2000 7 92160 3260 Average 3330 3 3 4.00 06/15/2000 28 3 4 4.00 06/15/2000 28 i Technician: Steve Campbell Started: 7:OOam Finished: 1:OOpm • Report Distribution: ngineering, Inc. (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. Eric J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 3 of 3 CONCRETE COMPRE6SIVE STRENGTH TES x } ENGINEERING, INC. a division of lrerracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/18/2000 Report No.: 0013221 Report Date 05/30/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 05/18/2000 BATCH TIME: 1 1:45am PLANT: 29 TIME SAMPLED: 12:15pm BY: Steve Campbell SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F) - AIR 86 F CONCRETE: 84 F SLUMP: 5.0" Max TRUCK NO: 80 TICKET NO: 535079 AIR: 3 -5% AIR CONTENT ( %): N/A UNIT WEIGHT (pct): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C -172 Sidewalks ASTM C -39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 7.00 05/25/2000 7 70300 2490 1 2 7.00 05/25/2000 7 69260 2450 Average 2470 1 3 7.00 06/15/2000 28 1 4 7.00 06/15/2000 28 Sample location: Ref point 53 between baseball fields 1 & 2 Technician: Steve Campbell Started: 1:OOpm Finished: 3:00pm 4 p Report Distribution: Engineering, Inc. (1) Hisaw & Associates (1) City of Coppell Engineering Dept. Eric J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1