Loading...
PA9901-LR000525 STATISTICAL ANALY'S 'S OF CONCRETE 1 ENGINEERING, INC. a division of 1letracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/25/2000 Report No.: 0010849S Report Date 05/25/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Review concrete compressive strengths for compliance with project specifications and ACI 318 Building Code. PROJECT DATA SPECIFICATION REQUIREMENTS: 3500 psi @ 28 Days CONCRETE CLASS: 9339 REPORT OF TESTS NUMBER AIR CONCRETE COMPRESSIVE RUNNING REPORT OF SLUMP CONTENT TEMP STRENGTH 3 TEST AVG DATE NUMBER SET SAMPLES (in.) ( %) (F) PSI PSI 03/21/2000 0007733 1 2 3.50 N/A 64 5220 04/05/2000 0009095 1 2 5.50 N/A 81 4955 04/18/2000 0010318 1 2 5.00 3.5 80 4215 4797 04/18/2000 0010318 2 2 5.25 4.2 82 4655 4608 04/18/2000 0010318 3 2 5.00 4.0 80 4285 4385 04/18/2000 0010318 4 2 5.25 4.4 84 3960 4300 04/19/2000 0010439 1 2 5.00 N/A 84 4065 4103 04/19/2000 0010439 2 2 4.25 4.5 82 5495 4507 04/20/2000 0010578 1 2 5.00 4.2 68 4100 4553 04/20/2000 0010578 2 2 5.25 3.8 70 4370 4655 04/20/2000 0010578 3 2 4.75 4.1 71 4960 4477 04/20/2000 0010578 4 2 5.25 3.8 73 4895 4742 04/20/2000 0010578 5 2 5.00 3.3 73 4225 4693 04/20/2000 0010578 6 2 5.25 3.6 75 3605 4242 04/20/2000 0010683 1 2 5.00 3.9 77 4095 3975 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 11EJC Page 1 of 2 TEC Report No.: 0010849Sn NUMBER AIR CONCRETE COMPRESSIVE RUNNING REPORT OF SLUMP CONTENT TEMP STRENGTH 3 TEST AVG DATE NUMBER SET SAMPLES (in.) ( %) (F) PSI PSI 04/20/2000 0010683 2 2 4.00 4.0 79 4780 4160 04/20/2000 0010683 3 2 4.75 4.2 4360 4412 04/24/2000 0010849 1 2 5.00 2.9 75 4140 4427 04/24/2000 0010849 2 2 4.75 5.5 76 3530 4010 04/24/2000 0010849 3 2 5.00 5.0 78 3310 3660 Average of all sets of three consecutive strenghts equals or exceeds the project specifications. Average of 20 sets = 4360 PSI @ 28 days Ens' V Technician: Eric J. Cleveland, P.E. ' Report Distribution: (1) Hisaw & Associates (1) City ofCoppell - Engineering Dept. Eric J. Cleveland, P.E. Senior Project Engineer C0 Ms '" r ,his , ?3 u .4.iding . l.:ifs,,:3. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 11EJC Page 2 of 2 CONCRETE COMPREF - IVE STRENGTH TEST 1_13u ENGINEERING, INC. a division of Werracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/24/2000 Report No.: 0010849 Report Date 05/25/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw Mix I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/24/2000 BATCH TIME: 12 :OOpm PLANT: 27 TIME SAMPLED: 12 :35pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F) - AIR 68 F CONCRETE: 75 F SLUMP: 4.0" Max TRUCK NO: 1888 TICKET NO: 506359 AIR: 3 -6% AIR CONTENT ( %): 2.9 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C -172 Paving- northeast firelane & parking ASTM C -39 Sampled from pump. SAMPLE LOCATION: 30' E of W joint & 2' N of S joint REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (ibs. force) (psi) TYPE 1 1 5.00 05/01/2000 7 91270 3230 1 2 5.00 05/01/2000 7 94130 3330 Average 3280 1 3 5.00 05/22/2000 28 117880 4170 1 4 5.00 05/22/2000 28 116180 4110 Average 4140 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of !IBC Engineering, Inc. OILL Page 1 of 3 CONCRETE COMPREFAVE STRENGTH TEST Hi: ENGINEERING,, INC. a division of lferracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/24/2000 Report No.: 0010849 Report Date 05/25/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Co ell Texas Carrollton TX 75006 PP Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/24/2000 BATCH TIME: 12:31pm PLANT: 27 TIME SAMPLED: 1:2Opm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F) - AIR 73 F CONCRETE: 76 F SLUMP: 4.0" Ma TRUCK NO: 923 TICKET NO: 506367 AIR: 3 -6% AIR CONTENT ( %): 5.5 UNIT WEIGHT (pct): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: See page 1 ASTM C -172 ASTM C -39 Sampled from truck. SAMPLE LOCATION: 120' E of W joint & 20' S of N curb REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE 2 1 4.75 05/01/2000 7 76100 2690 2 2 4.75 05/01/2000 7 77740 2750 Average 2720 2 3 4.75 05/22/2000 28 98330 3480 2 4 4.75 05/22/2000 28 101240 3580 Average 3530 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 2 of 3 1 CONCRETE COMPREF'IVE STRENGTH TEST ENGINEERING, INC. a division of 1ierracOn 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 04/24/2000 Report No.: 0010849 05/25/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw mix LD.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/24/2000 BATCH TIME: 1:4Opm PLANT: 27 TIME SAMPLED: 2:3Opm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 3500 psi (Q 28 Days TEMPERATURE (F) - AIR 75 F CONCRETE: 78 F SLUMP: 4.0" Max TRUCK NO: 1807 TICKET NO: 506376 AIR: 3 -6% AIR CONTENT ( %): 5.0 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: See page 1 ASTM C -172 ASTM C -39 Sampled from truck. SAMPLE LOCATION: 25' W of E curb & 25' S of N curb REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 5.00 05/01/2000 7 71810 2540 3 2 5.00 05/01/2000 7 72080 2550 Average 2550 3 3 5.00 05/22/2000 28 93140 3290 3 4 5.00 05/22/2000 28 94130 3330 Average 3310 Technician: Greg Dimock Started: 10:OOam Finished: 5:OOpm �S n i I • ering, Inc. Report Distribution: g g (1) Hisaw & Associates (1) City of Coppell - Engineering Dept . J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 3 of 3