Loading...
PA9901-LR000518 (3) IN -PLACE DENSITY TJL JTING ENGINEERING, INC. a division of " k:rracOn 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/10/2000 Report No.: 0012474 Report Date 05/18/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: In -place density testing. PROJECT DATA CONTRACTOR: Laboratory Test Method: Field Test Method: Hisaw ASTM D -698 ASTM D2922 ASTM D3017 MOISTURE DENSITY RELATIONS: Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Dk brown sandy clay (lime treated) 21.5 98.0 -3/ +3% 95% FIELD DENSITY TESTS TEST PROBE LIFT / M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION DEPTH ELEV No. ( %) (pcf) (% max) Parking Lot 74 Pump house at Grade 1 19.9 97.2 99 Pump House Road 75 Approximately 350' W of State St. at Grade 1 19.5 99.5 102 76 Approximately 170' W of State St. at Grade 1 19.9 98.1 100 77 Approximately 50' W of State St. at Grade 1 23.5 94.6 97 Test results on this report meet project specification. eering, Inc. Technician: Phil Green Started: 4:OOp Finished: 5:30p Report Distribution: (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. 'rlc J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07SDS Page 1 of 1 CONCRETE COMPRE;,, iIVE STRENGTH TES ENGINEERING, INC. a division of lferracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 04/18/2000 Report No.: 0010318 05/18/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Coppell, Texas Carrollton TX 75006 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/18/2000 BATCH TIME: 10:2Oam PLANT: 27 TIME SAMPLED: 11: loam BY: Mario Villanueva SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 84 F CONCRETE: 80 F SLUMP: 3 -5" TRUCK NO: 653 TICKET NO: 506047 AIR: 3 -6% AIR CONTENT ( %): 3.5 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: Northwest parking lot and west end of firelane ASTM C -172 ASTM C -39 Sample was obtained at point of discharge of pump hose. SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.00 04/25/2000 7 83650 2960 1 2 5.00 04/25/2000 7 84810 3000 Average 2980 1 3 5.00 05/16/2000 28 118830 4200 1 4 5.00 05/16/2000 28 119580 4230 Average 4220 Sample location: 20 Feet south, 110' east of NW corner of parking lot This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of I Engineering, Inc. O1LL Page 1 of 5 CONCRETE COMPRE: ,DIVE STRENGTH TES ENGINEERING, INC a division of 1I rtacon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 04/18/2000 Report No.: 0010318 05/18/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Coppell, Texas Carrollton TX 75006 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/18/2000 BATCH TIME: 12:2Opm PLANT: 27 TIME SAMPLED: 12:45pm BY: Mario Villanueva SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 85 F CONCRETE: 82 F SLUMP: 3 -5" TRUCK NO: 653 TICKET NO: 506058 AIR: 3 -6% AIR CONTENT ( %): 4.2 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: See page 1 ASTM C -172 ASTM C -39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 120 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 5.25 04/25/2000 7 98230 3470 2 2 5.25 04/25/2000 7 97240 3440 Average 3460 2 3 5.25 05/16/2000 28 129390 4580 2 4 5.25 05/16/2000 28 133810 4730 Average 4660 Sample location: 30 Feet south, 30 feet E of NW corner of parking lot This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 2 of 5 CONCRETE COMPRES►,IVE STRENGTH TEST HE ENGINEERING, INC. a division of 1I rr con 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 04/18/2000 Report No.: 0010318 05/18 /2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Coppell, Texas Carrollton TX 75006 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/18/2000 BATCH TIME: 12:1 Spm PLANT: 27 TIME SAMPLED: 2:4Opm BY: Mario Villanueva SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 86 F CONCRETE: 80 F SLUMP: 3 -5 TRUCK NO: 931 TICKET NO: 506074 AIR: 3 -6% AIR CONTENT (%): 4.0 UNIT WEIGHT (pd): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: See below ASTM C -172 ASTM C -39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 220 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 5.00 04/25/2000 7 89290 3160 3 2 5.00 04/25/2000 7 84520 2990 Average 3080 3 3 5.00 05/16/2000 28 118800 4200 3 4 5.00 05/16/2000 28 123640 4370 Average 4290 Sample location: 60' S, 40' E of firelane of NW corner of parking lot This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 3 of 5 CONCRETE COMPRE►_ AVE STRENGTH TES' WC ENGINEERING, INC. a division of 1kerr7e con 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 04/18/2000 Report No.: 0010318 05/18/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Coppell, Texas Carrollton TX 75006 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/18/2000 BATCH TIME: 3:25pm PLANT: 27 TIME SAMPLED: 4:1Opm BY: Mario Villanueva SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 86 F CONCRETE: 84 F SLUMP: 3-5" TRUCK NO: 94 TICKET NO: 506084 AIR: 3 -6% AIR CONTENT ( %): 4.4 UNIT WEIGHT (pct): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: See page 1 ASTM C -172 ASTM C -39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 280 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 5.25 04/25/2000 7 90980 3220 4 2 5.25 04/25/2000 7 89050 3150 Average 3190 4 3 5.25 05/16/2000 28 110760 3920 4 4 5.25 05/16/2000 28 113080 4000 Average 3960 Sample location: 240 Feet S, 40' W of firelane NW corner of parking lot This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 4 of 5 Report No.: 0010318 • oe,.e�a, ollrvr.m� Technician: Mario Villanueva Started: 11:OOam Finished: 6:OOpm 4' � / Report Distribution: '' n erin ;, Inc. (I) Hisaw & Associates - -- T- _ -- (1) City of Coppell - Engineering Dept. • J. Cleveland, P.B. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 5 of 5