PA9901-LR000516 REPORT OF SOIL -LIME MIXTURE PULVERIZATION I-BC
ENGINEERING, INC.
8901 Carpenter Frwy., Site 100
Dallas. Texas 75247
Date of Service: 05/16/00 Report No.: 0012944
Client No.: 36503000 Project No.: 94001043
Client: Hisaw & Associates Project: Wagon Wheel Park
3116 Kellway Dr., Suite 116 154 S. State Road
Carrollton, Texas 75006 Coppell, Texas
Contractor: Specification Requirements:
Test Location: S Parking Lot Minimum Passing 1 3/4" Sieve: 100%
Minimum Passing #4 Sieve: 60%
Sample Condition: Field Moist
Test Method: NTCOG
1 -3/4" Sieve #4 Sieve
Test No. Location %Pass % Pass
1 15' N and 40' E of SW corner of parking lot 100 61
2 20' N and 120' W of SE corner of parking lot 100 64
Technician: P. Green Started: 1:30 p.m. Stopped: 3:00 p.m.
Report Distribution: •,• e = ng, Inc.
(1) Hisaw Sr Associates
(1) City of Coppell - Engineering Dept.
Eric J. Cleveland, P. E.
Senior Project Engineer
309 This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, Inc.