Loading...
PA9901-LR000515 REPORT OF SOIL -LIME MIXTURE PULVERIZATION I-BC ENGINEERING, INC. 8901 Carpenter Frwy., Suite 100 Dallas. Texas 75247 Date of Service: 05/15/00 Report No.: 0012814 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park 3116 Kellway Dr., Suite 116 154 S. State Road Carrollton, Texas 75006 Coppell, Texas Contractor: Specification Requirements: Test Location: S Parking Lot Minimum Passing 1 3/4" Sieve: 100% Minimum Passing #4 Sieve: 60% Sample Condition: Field Moist Test Method: NTCOG 1 -3/4" Sieve #4 Sieve Test No. Location %Pass % Pass 1 15' S and 65' E of NW corner of S parking lot 100 70 2 10' S and 80' W of NE corner of S parking lot 100 67 Technician: P. Green Started: 12:30 p.m. Stopped: 2:00 p.m. Report Distribution: i Engi e ng Inc. (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. Eric J. Cleveland, P. E. Senior Project Engineer 309 This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, Inc.