Loading...
PA9901-LR000510 REPORT OF SOIL -LIME MIXTURE PULVERIZATION I-BC ENGINEERING, INC. 8901 Carpenter Frwy., Suite 100 Dallas. Texas 75247 Date of Service: 05/10/00 Report No.: 0012475 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park 3116 Kellway Dr., Suite 116 154 S. State Road Carrollton, Texas 75006 Coppell, Texas Contractor: Specification Requirements: Test Location: Pump House Access Rd. Minimum Passing 1 3/4" Sieve: 100% Minimum Passing #4 Sieve: 60% Sample Condition: Field Moist Test Method: NTCOG 1 -3/4" Sieve #4 Sieve Test No. Location %Pass % Pass 1 45' E and 20' S of Pump House 100 68 Technician: P. Green Started: 4:00 p.m. Stopped: 4:30 p.m. Report Distribution: F E .' trig Inc. (1) Hisaw & Associates /+ (1) City of Coppell - Engineering Dept. Eric J. Cleveland, P. E. Senior Project Engineer 309 This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, Inc.