Loading...
PA9901-LR000505 CONCRETE COMPRELJ IVE STRENGTH TES ENGINEERING, INC. a division of lferracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04 /05/2000 Report No.: 0009095 Report Date 05/05/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/05/2000 BATCH TIME: 10:4Oam PLANT: 27 TIME SAMPLED: 11:30am BY: Brad Rengstorff SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 71 F CONCRETE: 81 F SLUMP: 4 -6" TRUCK NO: 807 TICKET NO: 505588 AIR: N/A AIR CONTENT ( %): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C-172 Edge around pond and backstops ASTM C -39 SAMPLE LOCATION: Southwest corner edge of pond REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.50 04/12/2000 7 103960 3680 1 2 5.50 04/12/2000 7 103180 3650 Average 3670 1 3 5.50 05/03/2000 28 138860 4910 1 4 5.50 05/03/2000 28 141350 5000 Average 4960 Technician: Brad Rengstorff Started: 10:30am Finished: 12:30pm v- Report Distribution: gi ° Br Inc. (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. Eric J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 1 of 1