Loading...
PA9901-LR000503 CONCRETE COMPRE6SIVE STRENGTH TES' Ja - FPC ENGINEERING, INC. a division of 1rerracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 ■ Date of Service: 04/20/2000 Report No.: 0010578 Report Date 05/03/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/20/2000 BATCH TIME: 7:OOam PLANT: 27 TIME SAMPLED: 7:45am BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, windy, mild STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 64 F CONCRETE: 68 F SLUMP: 3 -5" TRUCK NO: 653 TICKET NO: 506112 AIR: 3 -5% AIR CONTENT ( %): 4.2 UNIT WEIGHT (pct): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C-172 Paving southside of parking lot ASTM C -39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 50 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.00 04/27/2000 7 89520 3170 1 2 5.00 04/27/2000 7 84820 3000 Average 3090 1 3 5.00 05/18/2000 28 1 4 5.00 05/18/2000 28 Sample location: 12' North x 280' east of southwest corner of parking lot This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 1 of 6 CONCRETE COMPRE,SIVE STRENGTH TES ,.. FPC ENGINEERING, INC. a division of 1I rracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/20/2000 Report No.: 0010578 Report Date 05/03/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Co ell, Texas Carrollton TX 75006 pp Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/20/2000 BATCH TIME: 8:1Sam PLANT: 27 TIME SAMPLED: 8:50am BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, windy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 66 F CONCRETE: 70 F SLUMP: 3 -5" TRUCK NO: 653 TICKET NO: 506123 AIR: 3 -5% AIR CONTENT ( %): 3.8 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C -172 See page 1 ASTM C -39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 140 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 5.25 04/27/2000 7 85240 3010 2 2 5.25 04/27/2000 7 87140 3080 Average 3050 2 3 5.25 05/18/2000 28 2 4 5.25 05/18/2000 28 Sample location: 15' N x 350' E of SW corner of parking lot This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 2 of 6 CONCRETE COMPRE6SIVE STRENGTH TES' lir ENGINEERING, INC. a division of 1kerracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/20/2000 Report No.: 0010578 Report Date 05/03/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/20/2000 BATCH TIME: 9:3 1 am PLANT: 27 TIME SAMPLED: 10:25am BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, windy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 67 F CONCRETE: 71 F SLUMP: 3 -5" TRUCK NO: 710 TICKET NO: 506133 AIR: 3 -5% AIR CONTENT ( %): 4.1 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: South firelane ASTM C -172 ASTM C -39 SAMPLE LOCATION: 20' N x 320' E of SW corner REPORT OF TESTS ACCUMULATIVE YARDS: 200 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 4.75 04/27/2000 7 106900 3780 3 2 4.75 04/27/2000 7 106500 3770 Average 3780 3 3 4.75 05/18/2000 28 3 4 4.75 05/18/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 3 of 6 CONCRETE COMPREL,L IVE STRENGTH TES., FPC ENGINEERING, INC. a division of lFerracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/20/2000 Report No.: 0010578 Report Date 05/03/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Co ell, Texas Carrollton TX 75006 pp Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/20/2000 BATCH TIME: 11:OSam PLANT: 27 TIME SAMPLED: 12:2Opm BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, windy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 72 F CONCRETE: 73 F SLUMP: 3 -5" TRUCK NO: 879 TICKET NO: 506147 AIR: 3 -5% AIR CONTENT ( %): 3.8 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: South firelane ASTM C -172 ASTM C -39 SAMPLE LOCATION: 20' N x 380' E of SW corner - REPORT OF TESTS ACCUMULATIVE YARDS: 290 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 5.25 04/27/2000 7 101220 3580 4 2 5.25 04/27/2000 7 100350 3550 Average 3570 4 3 5.25 05/18/2000 28 4 4 5.28 05/18/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 4 of 6 CONCRETE COMPREL.lIVE STRENGTH TES_ 1 ENGINEERING, INC. a division of lFerracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/20/2000 Report No.: 0010578 Report Date 05/03/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Co ell, Texas Carrollton TX 75006 pp Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/20/2000 BATCH TIME: 12:45pm PLANT: 27 TIME SAMPLED: 2:OOpm BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, mild STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 75 F CONCRETE: 73 F SLUMP: 3-5" TRUCK NO: 923 TICKET NO: 506160 AIR: 3 -5% AIR CONTENT ( %): 3.3 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C -172 South firelane ASTM C -39 SAMPLE LOCATION: 20' N x 440' E of SW corner REPORT OF TESTS ACCUMULATIVE YARDS: 340 • CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 1 5.00 04/27/2000 7 91380 3230 5 2 5.00 04/27/2000 7 94130 3330 Average 3280 5 3 5.00 05/18/2000 28 5 4 5.00 05/18/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 5 of 6 CONCRETE COMPREL,AVE STRENGTH TES H3C Fir ENGINEERING, INC. a division of l(erracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/20/2000 Report No.: 0010578 Report Date 05/03/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/20/2000 BATCH TIME: 1:27pm PLANT: 27 TIME SAMPLED: 2:SOpm BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, windy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 77 F CONCRETE: 75 F SLUMP: 3-5" TRUCK NO: 1831 TICKET NO: 5 14005 AIR: 3 -5% AIR CONTENT ( %): 3.6 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C -172 South firelane ASTM C -39 SAMPLE LOCATION: 20' N x 500' E of SW corner REPORT OF TESTS ACCUMULATIVE YARDS: 400 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 6 1 5.25 04/27/2000 7 78480 2780 6 2 5.25 04/27/2000 7 75320 2660 Average 2720 6 3 5.25 05/18/2000 28 6 4 5.25 05/18/2000 28 Technician: Shane Spinks Started: 6:OOam Finished: 4:OOpm Report Distribution: ngineering, Inc. (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. .c J. Cleveland, P.E. enior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 6 of 6