Loading...
PA9901-LR000502 CONCRETE COMPRELySIVE STRENGTH TES' HE ENGINEERING, INC. a division of 1rerracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/24/2000 Report No.: 0010849 Report Date 05/02/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/24/2000 BATCH TIME: 12:OOpm PLANT: 27 TIME SAMPLED: 12:35pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F) - AIR 68 F CONCRETE: 75 F SLUMP: 4.0" Max TRUCK NO: 1888 TICKET NO: 506359 AIR: 3 -6% AIR CONTENT ( %): 2.9 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C -172 Paving- northeast firelane & parking ASTM C -39 Sampled from pump. SAMPLE LOCATION: 30' E of W joint & 2' N of S joint REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.00 05/01/2000 7 91270 3230 1 2 5.00 05/01/2000 7 94130 3330 Average 3280 1 3 5.00 05/22/2000 28 1 4 5.00 05/22/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 3 CONCRETE COMPRL►JSIVE STRENGTH TES_ WC ENGINEERING, INC. a division of 1I rracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/24/2000 Report No.: 0010849 Report Date 05/02/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/24/2000 BATCH TIME: 12:31pm PLANT: 27 TIME SAMPLED: 1:2Opm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F) - AIR 73 F CONCRETE: 76 F SLUMP: 4.0" Max TRUCK NO: 923 TICKET NO: 506367 AIR: 3 -6% AIR CONTENT ( %): 5.5 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C -172 See page 1 ASTM C -39 Sampled from truck. SAMPLE LOCATION: 120' E of W joint & 20' S of N curb REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 4.75 05/01/2000 7 76100 2690 2 2 4.75 05/01/2000 7 77740 2750 Average 2720 2 3 4.75 05/22/2000 28 2 4 4.75 05/22/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 2 of 3 CONCRETE COMPRELIL IVE STRENGTH TES_ 112C ENGINEERING, INC. a division of Mrrxon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/24/2000 Report No.: 0010849 Report Date 05/02/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/24/2000 BATCH TIME: 1:4Opm PLANT: 27 TIME SAMPLED: 2:3Opm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F) - AIR 75 F CONCRETE: 78 F SLUMP: 4.0" Max TRUCK NO: 1807 TICKET NO: 506376 AIR: 3 -6% AIR CONTENT ( %): 5.0 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: See page 1 ASTM C -172 ASTM C -39 Sampled from truck. SAMPLE LOCATION: 25' W of E curb & 25' S of N curb REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE 3 1 5.00 05/01/2000 7 71810 2540 3 2 5.00 05/01/2000 7 72080 2550 Average 2550 3 3 5.00 05/22/2000 28 3 4 5.00 05/22/2000 28 Technician: Greg Dimock Started: 10:00am Finished: 5:OOpm . - Report Distribution: • gingering, Inc. (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. ric J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 3 of 3