PA9901-LR000429 REPORT OF SOIL -LIME MIXTURE PULVERIZATION
ENGINEERING, INC.
8901 Carpenter Frwy., Site 100
Dallas. Texas 75247
Date of Service: 04/29/00 Report No.: 0011429
Client No.: 36503000 Project No.: 94001043
Client: Hisaw & Associates Project: Wagon Wheel Park
3116 Kellway Dr., Suite 116 154 S. State Road
Carrollton, Texas 75006 Coppell, Texas
Contractor: Specification Requirements:
Test Location: North Driveway Area Minimum Passing 1 3/4" Sieve: 100%
Minimum Passing #4 Sieve: 60%
Sample Condition: Dry
Test Method: NTCOG
1 -3/4" Sieve #4 Sieve
Test No. Location %Pass % Pass
1 10' north, 200' west of southeast corner of drive 100 66
2 10' north, 160' west of southeast corner of drive 100 61
3 10' north, 120' west of southeast corner of drive 100 63
Technician: C. Cantwell Started: 11:00 a.m. Stopped: 12:30 p.m.
Report Distribution: • e g, Inc.
(1) Hisaw & Associates
(I) City of Coppell - Engineering Dept.
Eric J. Cleveland, P. E.
Senior Project Engineer
309 sds This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, Inc.