Loading...
PA9901-LR000427 CONCRETE COMPRL JSIVE STRENGTH TES Y ENGINEERING, INC. a division of 1I rracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/18/2000 Report No.: 0010318 Report Date 04/27/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIx I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/18 /2000 BATCH TIME: 10:2Oam PLANT: 27 TIME SAMPLED: 11: loam BY: Mario Villanueva SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 84 F CONCRETE: 80 F SLUMP: 3 -5" TRUCK NO: 653 TICKET NO: 506047 AIR: 3 -6% AIR CONTENT ( %): 3.5 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: Northwest parking lot and west end of firelane ASTM C -172 ASTM C -39 Sample was obtained at point of discharge of pump hose. SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.00 04/25/2000 7 83650 2960 1 2 5.00 04/25/2000 7 84810 3000 Average 2980 1 3 5.00 05/16/2000 28 1 4 5.00 05/16/2000 28 Sample location: 20 Feet south, 110' east of northwest corner of parking lot This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 4 CONCRETE COMPRE,SIVE STRENGTH TES' ENGINEERING, INC. a division of lI rracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/18/2000 Report No.: 0010318 Report Date 04/27/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/18/2000 BATCH TIME: 12:2Opm PLANT: 27 TIME SAMPLED: 12:45pm BY: Mario Villanueva SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 85 F CONCRETE: 82 F SLUMP: 3 -5" TRUCK NO: 653 TICKET NO: 506058 AIR: 3 -6% AIR CONTENT ( %): 4.2 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C -172 Seepage 1 ASTM C -39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 120 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 5.25 04/25/2000 7 98230 3470 2 2 5.25 04/25/2000 7 97240 3440 Average 3460 2 3 5.25 05/16/2000 28 2 4 5.25 05/16/2000 28 Sample location: 30 Feet south, 30 feet east of northwest corner of parking lot This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 2 of 4 CONCRETE COMPRL,SIVE STRENGTH TES1' FPC ENGINEERING, INC. a division of - I rracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/18/2000 Report No.: 0010318 Report Date 04/27/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field lest and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/18/2000 BATCH TIME: 12:15pm PLANT: 27 TIME SAMPLED: 2:40pm BY: Mario Villanueva SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 86 F CONCRETE: 80 F SLUMP: 3-5" TRUCK NO: 931 TICKET NO: 506074 AIR: 3 -6% AIR CONTENT ( %): 4.0 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C -172 See below ASTM C -39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 220 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 5.00 04/25/2000 7 89290 3160 3 2 5.00 04/25/2000 7 84520 2990 Average 3080 3 3 5.00 05/16/2000 28 3 4 5.00 05/16/2000 28 Sample location: 60 Feet South, 40' east of firelane of northwest corner of parking lot This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page3of4 CONCRETE COMPREA,SIVE STRENGTH TES ENGINEERING, INC. a division of 1Ferracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/18/2000 Report No.: 0010318 Report Date 04/27/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/18/2000 BATCH TIME: 3:25pm PLANT: 27 TIME SAMPLED: 4:1 OpM BY: Mario Villanueva SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 86 F CONCRETE: 84 F SLUMP: 3 -5" TRUCK NO: 94 TICKET NO: 506084 AIR: 3 -6% AIR CONTENT ( %): 4.4 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C -172 See page 1 ASTM C -39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 280 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 5.25 04/25/2000 7 90980 3220 4 2 5.25 04/25/2000 7 89050 3150 Average 3190 4 3 5.25 05/16/2000 28 4 4 5.25 05/16/2000 28 Sample location: 240 Feet south, 40' west of firelane northwest corner of parking lot Technician: Mario Villanueva Started: 11:OOam Finished: 6:OOpm . e. Report Distribution: gineering, Inc. (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. rric J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 4 of 4