PA9901-LR000417 CONCRETE COMPREsk_AVE STRENGTH TES', ][4])(:::
ENGINEERING, INC.
a division of l
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
Date of Service: 04/05/2000 Report No.: 0009095 04/17/2000
Client No.: 36503000 Project No.: 94001043
Client: Hisaw & Associates Project: Wagon Wheel Park
Attn: Bill Morgan 154 S. State Road
3116 Kellway Dr, Suite 116
Carrollton TX 75006 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Hisaw MIX I.D.: 9339
CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/05/2000 BATCH TIME: 10:4Oam
PLANT: 27 TIME SAMPLED: 1 1:3Oam BY: Brad Rengstorff
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear
STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 71 F CONCRETE: 81 F
SLUMP: 4 -6" TRUCK NO: 807 TICKET NO: 505588
AIR: N/A AIR CONTENT ( %): N/A UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C -143 PLACEMENT LOCATION:
Edge around pond and backstops
ASTM C -172
ASTM C -39
SAMPLE LOCATION: Southwest corner edge of pond
REPORT OF TESTS ACCUMULATIVE YARDS: 10
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 5.50 04/12/2000 7 103960 3680
1 2 5.50 04/12/2000 7 103180 3650
Average 3670
1 3 5.50 05/03/2000 28
1 4 5.50 05/03/2000 28
Technician: Brad Rengstorff Started: 10:30am Finished: 12:30pm
Report Distribution: _ eering, Inc.
(1) Hisaw & Associates
(1) City of Coppell - Engineering Dept. Eric J. Cleveland, P.E.
Senior Project Engineer
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 1 of 1
CONCRETE COMPRELJ IVE STRENGTH TES', WC
- ENGINEERING, INC.
a division of 1J rracon
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 03/16/2000 Report No.: 0007229 Report Date
04/17/2000
Client No.: 36503000 Project No.: 94001043
Client: Hisaw & Associates Project: Wagon Wheel Park
Attn: Bill Morgan 154 S. State Road
3116 Kellway Dr, Suite 116
Carrollton TX 75006 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Hisaw MIX I.D.: 44
CONCRETE SUPPLIER: Lattimore PLACEMENT DATE: 03/16/2000 BATCH TIME: 1:45pm
PLANT: 7 TIME SAMPLED: 3:OOpm BY: Greg Dimock
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy
STRENGTH: 4200 psi @ 28 Days TEMPERATURE (F) - AIR 72 F CONCRETE: 71 F
SLUMP: 3.0" Max TRUCK NO: 1093 TICKET NO: 7084582
AIR: N/A AIR CONTENT ( %): N/A UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C -143 PLACEMENT LOCATION:
ASTM C-172 Manhole in pumphouse
ASTM C -39 Sampled from truck.
SAMPLE LOCATION: See placement location
REPORT OF TESTS ACCUMULATIVE YARDS: 8
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 3.00 03/23/2000 7 137290 4860
1 2 3.00 03/23/2000 7 135130 4780
Average 4820
1 3 3.00 04/13/2000 28 157380 5570
1 4 3.00 04/13/2000 28 160290 5670
Average 5620
Technician: Greg Dimock Started: 1:OOpm Finished: 3:OOpm
� neer
' • • iin ,Inc.
Report Distribution: - g
(1) Hisaw & Associates
(1) City of Coppell - Engineering Dept. 4P ' /Eri J. Cleveland, P.E.
S; nior Project Engineer
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 1 of 1