Loading...
PA9901-LR000417 CONCRETE COMPREsk_AVE STRENGTH TES', ][4])(::: ENGINEERING, INC. a division of l 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 04/05/2000 Report No.: 0009095 04/17/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr, Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 04/05/2000 BATCH TIME: 10:4Oam PLANT: 27 TIME SAMPLED: 1 1:3Oam BY: Brad Rengstorff SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 71 F CONCRETE: 81 F SLUMP: 4 -6" TRUCK NO: 807 TICKET NO: 505588 AIR: N/A AIR CONTENT ( %): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: Edge around pond and backstops ASTM C -172 ASTM C -39 SAMPLE LOCATION: Southwest corner edge of pond REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.50 04/12/2000 7 103960 3680 1 2 5.50 04/12/2000 7 103180 3650 Average 3670 1 3 5.50 05/03/2000 28 1 4 5.50 05/03/2000 28 Technician: Brad Rengstorff Started: 10:30am Finished: 12:30pm Report Distribution: _ eering, Inc. (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. Eric J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1 CONCRETE COMPRELJ IVE STRENGTH TES', WC - ENGINEERING, INC. a division of 1J rracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/16/2000 Report No.: 0007229 Report Date 04/17/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr, Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 44 CONCRETE SUPPLIER: Lattimore PLACEMENT DATE: 03/16/2000 BATCH TIME: 1:45pm PLANT: 7 TIME SAMPLED: 3:OOpm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 4200 psi @ 28 Days TEMPERATURE (F) - AIR 72 F CONCRETE: 71 F SLUMP: 3.0" Max TRUCK NO: 1093 TICKET NO: 7084582 AIR: N/A AIR CONTENT ( %): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C-172 Manhole in pumphouse ASTM C -39 Sampled from truck. SAMPLE LOCATION: See placement location REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 3.00 03/23/2000 7 137290 4860 1 2 3.00 03/23/2000 7 135130 4780 Average 4820 1 3 3.00 04/13/2000 28 157380 5570 1 4 3.00 04/13/2000 28 160290 5670 Average 5620 Technician: Greg Dimock Started: 1:OOpm Finished: 3:OOpm � neer ' • • iin ,Inc. Report Distribution: - g (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. 4P ' /Eri J. Cleveland, P.E. S; nior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1