PA9901-LR000330 REPORT OF SOIL -LIME MIXTURE PULVERIZATION • I-PC
ENGINEERING, INC.
8901 Carpenter Frwy., Suite 100
Dallas. Texas 75247
Date of Service: 03/30/00 Report No.: 0008642
Client No.: 36503000 Project No.: 94001043
Client: Hisaw & Associates Project: Wagon Wheel Park
3116 Kellway Dr., Suite 116 154S. State Road
Carrollton, Texas 75006 Coppell, Texas
Contractor: Specification Requirements:
Test Location: South Parking Area Minimum Passing 1 3/4" Sieve: 100%
Minimum Passing #4 Sieve: 60%
Test Method: NTCOG
1 3/4" Sieve #4 Sieve
Test No. Location %Pass % Pass
1 20' north, 60' west of southeast corner 100 61
2 20' north, 210' west of southeast corner 100 68
3 30' north, 375' west of southeast corner 100 66
Technician: L. Jones Started: 1:00 p.m. Stopped: 2:00 p.m.
Report Distribution: n:ineering, Inc.
(1) Hisaw & Associates
(1) City of Coppell - Engineering Dept.
Z1,
ri J. Cleveland, P. E.
Sensor Project Engineer
309 This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, Inc.
CONCRETE COMPRE;,AVE STRENGTH TES's Fir
ENGINEERING, INC.
a division of 1I rracon
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 03/21/2000 Report No.: 0007599 Report Date
03/30/2000
Client No.: 36503000 Project No.: 94001043
Client: Hisaw & Associates Project: Wagon Wheel Park
Attn: Bill Morgan 154 S. State Road
3116 Kellway Dr, Suite 116
Carrollton TX 75006 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Hisaw MIX I.D.: 44
CONCRETE SUPPLIER: Lattimore PLACEMENT DATE: 03/21/2000 BATCH TIME: 1:38pm
PLANT: 7 TIME SAMPLED: 2:37pm BY: Joey Gordon
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy, rain
STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 60 F CONCRETE: 65 F
SLUMP: 3.0" Max TRUCK NO: 955 TICKET NO: 7084747
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C -143 PLACEMENT LOCATION:
ASTM C-172 Manhole irrigation
ASTM C -39 Sampled from truck.
SAMPLE LOCATION: See placement location Technician Time: See Report 0007733
REPORT OF TESTS ACCUMULATIVE YARDS: 9
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE
1 1 2.00 03/28/2000 7 174410 6170
1 2 2.00 04/18/2000 28
1 3 2.00 04/18/2000 28
Technician: Joey Gordon Started: Finished: •
ngineeririg, Inc.
4 /. Report Distribution:
(1) Hisaw & Associates
(1) City of Coppell - Engineering Dept. Eric J. Cleveland, P.E.
Senior Project Engineer
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 1 of 1
CONCRETE COMPREL STRENGTH TES'
ENGINEERING, INC.
a division of 1 J rracon
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 03/21/2000 Report No.: 0007733 Report Date
03/30/2000
Client No.: 36503000 Project No.: 94001043
Client: Hisaw & Associates Project: Wagon Wheel Park
Attn: Bill Morgan 154 S. State Road
3116 Kellway Dr, Suite 116
Carrollton TX 75006 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Hisaw MIx I.D.: 9339
CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 03/21/2000 BATCH TIME: 1:28pm
PLANT: 27 TIME SAMPLED: 2:O7pm BY: Joey Gordon
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy, heavy rain
STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F) - AIR 60 F CONCRETE: 64 F
SLUMP: 4.0" Max TRUCK NO: 855 TICKET NO: 474926
AIR: N/A AIR CONTENT ( %): N/A UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C -143 PLACEMENT LOCATION:
Footing for manmade lake
ASTM C -172
ASTM C -39 Sampled from truck.
SAMPLE LOCATION: See placement location
REPORT OF TESTS ACCUMULATIVE YARDS: 10
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 3.50 03/28/2000 7 128570 4550
1 2 3.50 04/18/2000 28
1 3 3.50 04/18/2000 28
Technician: Joey Gordon Started: 1:OOpm Finished: 3:30pm A t / �gi rieering, Inc.
Report Distribution: v
(I) Hisaw & Associates
(1) City of Coppell - Engineering Dept. is J. Cleveland, P.E.
Senior Project Engineer
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of 1-IBC Engineering, Inc.
01LL Page 1 of 1