Loading...
PA9901-LR000330 REPORT OF SOIL -LIME MIXTURE PULVERIZATION • I-PC ENGINEERING, INC. 8901 Carpenter Frwy., Suite 100 Dallas. Texas 75247 Date of Service: 03/30/00 Report No.: 0008642 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park 3116 Kellway Dr., Suite 116 154S. State Road Carrollton, Texas 75006 Coppell, Texas Contractor: Specification Requirements: Test Location: South Parking Area Minimum Passing 1 3/4" Sieve: 100% Minimum Passing #4 Sieve: 60% Test Method: NTCOG 1 3/4" Sieve #4 Sieve Test No. Location %Pass % Pass 1 20' north, 60' west of southeast corner 100 61 2 20' north, 210' west of southeast corner 100 68 3 30' north, 375' west of southeast corner 100 66 Technician: L. Jones Started: 1:00 p.m. Stopped: 2:00 p.m. Report Distribution: n:ineering, Inc. (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. Z1, ri J. Cleveland, P. E. Sensor Project Engineer 309 This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, Inc. CONCRETE COMPRE;,AVE STRENGTH TES's Fir ENGINEERING, INC. a division of 1I rracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/21/2000 Report No.: 0007599 Report Date 03/30/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr, Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 44 CONCRETE SUPPLIER: Lattimore PLACEMENT DATE: 03/21/2000 BATCH TIME: 1:38pm PLANT: 7 TIME SAMPLED: 2:37pm BY: Joey Gordon SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy, rain STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 60 F CONCRETE: 65 F SLUMP: 3.0" Max TRUCK NO: 955 TICKET NO: 7084747 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C-172 Manhole irrigation ASTM C -39 Sampled from truck. SAMPLE LOCATION: See placement location Technician Time: See Report 0007733 REPORT OF TESTS ACCUMULATIVE YARDS: 9 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE 1 1 2.00 03/28/2000 7 174410 6170 1 2 2.00 04/18/2000 28 1 3 2.00 04/18/2000 28 Technician: Joey Gordon Started: Finished: • ngineeririg, Inc. 4 /. Report Distribution: (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. Eric J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1 CONCRETE COMPREL STRENGTH TES' ENGINEERING, INC. a division of 1 J rracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/21/2000 Report No.: 0007733 Report Date 03/30/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr, Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIx I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 03/21/2000 BATCH TIME: 1:28pm PLANT: 27 TIME SAMPLED: 2:O7pm BY: Joey Gordon SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy, heavy rain STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F) - AIR 60 F CONCRETE: 64 F SLUMP: 4.0" Max TRUCK NO: 855 TICKET NO: 474926 AIR: N/A AIR CONTENT ( %): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: Footing for manmade lake ASTM C -172 ASTM C -39 Sampled from truck. SAMPLE LOCATION: See placement location REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 3.50 03/28/2000 7 128570 4550 1 2 3.50 04/18/2000 28 1 3 3.50 04/18/2000 28 Technician: Joey Gordon Started: 1:OOpm Finished: 3:30pm A t / �gi rieering, Inc. Report Distribution: v (I) Hisaw & Associates (1) City of Coppell - Engineering Dept. is J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of 1-IBC Engineering, Inc. 01LL Page 1 of 1