Loading...
PA9901-LR000329 CONCRETE COMPREoSIVE STRENGTH TES .. WC ENGINEERING, INC. a division of 16-racon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/20/2000 Report No.: 0007593 Report Date 03/29/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr, Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX LD.: 44 CONCRETE SUPPLIER: Lattimore PLACEMENT DATE: 03/20/2000 BATCH TIME: 1 :OOpm PLANT: 7 TIME SAMPLED: 2:21pm BY: Joey Gordon SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTII: 4200 psi @ 28 Days TEMPERATURE (F) - AIR 72 F CONCRETE: 79 F SLUMP: 3.0" Max TRUCK NO: 938 TICKET NO: 7084673 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C -172 Irrigation manhole ASTM C -39 Sampled from truck. SAMPLE LOCATION: Irrigation manhole REPORT OF TESTS ACCUMULATIVE YARDS: 5.5 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 3.00 03/27/2000 7 130720 4620 1 2 3.00 03/27/2000 7 125490 4440 Average 4530 1 3 3.00 04/17/2000 28 1 4 3.00 04/17/2000 28 Technician: Joey Gordon Started: 2:OOpm Finished: 4:OOpm ngineering, Inc. Report Distribution: (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. Eric J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 1 of 1