Loading...
PA9901-LR000302 PST -PLACE DENSITY TFSTING I-12C ENC'INEERIMJ, INC. a division of 1kerracan 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/17/2000 Report No.: 0004665 Report Date 03/02/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Callaway Dr, Suite 116 Carrollton TX 75006 Coppell, Texas Services: In -place density testing. PROJECT DATA CONTRACTOR: Laboratory Test Method: Field Test Method: Hisaw ASTM D -698 ASTM D2922 ASTM D3017 MOISTURE DENSITY RELATIONS: Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Gray & dk brown clay w /sand & gravel 20.0 104.5 -2/ +4% 92% 2 Med brown sandy clay 15.0 112.0 -2/ +4% 92% FIELD DENSITY TESTS TEST PROBE LIFT/ M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION DEPTH ELEV No. ( %) (pct) (% max) Storm Sewer, Line A 53 Station 20 +50 8" TOG 2 13.0 103.0 92 54 Station 19 +95 8" 2' BEG 1 18.5 96.8 93 55 Station 21 +70 8" TOG 2 13.3 102.7 92 56 Station 21 +80 8" TOG 1 19.3 96.3 92 Storm Sewer, Line C 57 Station 1 +70 8" 2' BEG 2 16.5 106.4 95 Storm Sewer, Line B 58 Station 2 +15 8" 3' BEG 2 16.9 108.7 97 59 Station 0 +55 8" 2.5' BEG 2 16.9 107.3 96 Storm Sewer, Line A 60 Station 32 +10 8" 2' BEG 2 17.6 106.5 95 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07SDS Page 1 of 2 Report No.: 0004665 E"""'"G''` TEST PROBE LIFT / M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION DEPTH ELEV No. ( %) (pct) (% max) 61 Station 30 +50 8" 2.5' BEG 1 19.3 99.9 96 62 Station 28 +80 8" 3' BEG 1 19.8 104.9 100 Test results on this report meet project specification. TOG = top of grade BEG = below existing grade • Field Results Reported To: Contractor ' A6 7 - neering, Inc. Technician: Mike Whyman Started: 12:30p Finished: 3:OOp Report Distribution: (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. ric J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07SDS Page 2 of 2