Loading...
PA9901-LR000223 WATER INJECTION OBSERN,,,TION ENGINEERING, INC. 8901 Carpenter Freeway, Suite 100 Dallas, Texas 75247 Date of Service: 02/23/00 Report No.: 0005196 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park 3116 Callaway Dr, Suite 116 154 S. State Road Carrollton, TX 75006 Coppell, Texas Location: General Contactor: Hisaw Injector: Kenneth Moore Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 4th No. of Probes: 4 Probe Length: 8 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: Technician: C. Williams /T. Smith Started: 8:00 a.m. Stopped: 12:30 p.m. Report Distribution: WC Engineering, Inc. (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. Eric J. Cle'eland, P.E. Senior Project Engineer 99dp This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, Inc.