Loading...
PA9901-LR000219 WATER INJECTION OBSERVATION IBC ENGINEERING, INC. 8901 Carpenter Freeway, Suite 100 Dallas, Texas 75247 Date of Service: 02/19/00 Report No.: 0004836 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park 3116 Callaway Dr, Suite 116 154 S. State Road Carrollton, TX 75006 Coppell, Texas Location: Concession Stand and Restroom General Contactor: Hisaw and Pump Pad and Service Bldg. Injector: Kenneth Moore Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 3rd and 4th No. of Probes: 4 Probe Length: 11 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: Only able to penetrate 7 feet on Pump Pad. Technician: C. Williams /T. Smith Started: 8:00 a.m. Stopped: 12:00 p.m. Report Distribution: E : i ering, Inc. (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. // Ic J. Cleveland, P.E. Senior Project Engineer 99dp This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of NBC Engineering, Inc.