Loading...
PA9901-LR000216 WATER INJECTION OBSERVATION ENGINEERING, INC. 8901 Carpenter Freeway, Suite 100 Dallas, Texas 75247 Date of Service: 02/16/00 Report No.: 0004548 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park 3116 Callaway Dr, Suite 116 154 S. State Road Carrollton, TX 75006 Coppell, Texas Location: Service and Well Buildings and General Contactor: Hisaw Restroom and Concession Stand Injector: Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 1st No. of Probes: 4 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: Both Service and Well Buildings were only penetrating 4 feet instead of 8 feet. Technician: M. Villanueva Started: 10:00 a.m. Stopped: 5:30 p.m. Report Distribution: �. ! • /. ' ng, Inc. (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. A/1 Eric J. Cleveland, P.E. Senior Project Engineer 99dp This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, Inc.