Loading...
PA9901-LR000209 IN -PLACE DENSITY T_ STING Br ENGINEERING, INC. a division of 1f rracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/04/2000 Report No.: 0003638 Report Date Client No.: 36503000 Project No.: 94001043 02/09/2000 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Callaway Dr, Suite 116 Carrollton TX 75006 Coppell, Texas Services: In -place density testing. PROJECT DATA CONTRACTOR: Laboratory Test Method: Field Test Method: Hisaw ASTM D -698 ASTM D2922 ASTM D3017 MOISTURE DENSITY RELATIONS: Maximum Project Requirements M/D No. Description Moisture '% Density pcf Moisture Density 1 Gray & dk brown clay w /gravel 20.0 104.5 Opt. or above 95% 2 Mix, lt. brown & tan sand w /med & dk brown & 13.0 116.0 Opt. or above 95% tan clay FIELD DENSITY TESTS TEST PROBE LIFT/ M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION DEPTH ELEV No. ( %) (pct) (% max) 30" RCP Storm Sewer 42 25' north of Junction Box on line A 4' BG 1 24.0 101.2 97 43 25' north of Junction Box on line A 2' BG 1 23.7 101.5 97 44 25' north of Junction Box on line A FG 1 24.8 99.9 96 Sanitary Sewer 45 50' north of manhole on lateral off line A 4' BG 2 16.5 111.2 96 46 50' north of manhole on lateral off line A 2' BG 2 17.2 111.7 96 47 50' north of manhole on lateral off line A FG 2 15.9 110.7 95 30" RCP Storm Sewer 48 30' north of surface drain inlet on line A 4' BG 1 25.4 100.6 96 49 30' north of surface drain inlet on line A 2' BG 1 23.9 102.6 98 50 30' north of surface drain inlet on line A FG 1 24.3 101.4 97 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of I-IBC Engineering, Inc. 07SDS Page 1 of 2 Report No.: 0003638 Eir =IL:- TEST PROBE LIFT/ M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION DEPTH ELEV No. ( %) (pct) (% max) 18" RCP Storm Sewer 51 125' south of surface drain inlet on line A 2' BG 1 24.9 100.4 96 52 125' south of surface drain inlet on line A FG 1 24.2 100.0 96 Test results on this report meet project specification. BG = below grade FG = final grade First Trip: 3 hours Field Results Reported To: Utility Superintendent Technician: Jessie Tipton Started: Finished: 11 gineering, Inc. Report Distribution: (1) Hisaw & Associates (1) City of Coppell - Engineering Dept. Eric J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07SDS Page 2 of 2