Loading...
MA1006-AG110412AGENDA REQUEST FORM T H E . ` ' T Y . a F DEPT: Engineering COPPELL DATE: April 12, 2011 k s ITEM #: 15 WORK SESSION CONSENT IZI REGULAR ITEM TYPE: DISCUSSION ITEM CAPTION: Discussion regarding restricting access through the Belt Line Road, Denton Tap Road and Southwestern Blvd. intersection for the reconstruction of the intersection with stamped concrete. GOAL(S): EXECUTIVE SUMMARY: In order to remove and replace the pavers at the intersection of Belt Line Road /Denton Tap Road /Southwestern Blvd., the City of Coppell will need to temporarily close various lanes of traffic in all directions to allow for construction. At least one lane of traffic will be allowed north and south on Denton Tap Road /Belt Line Road at all times. Staff will be available to answer any questions at the Council meeting. FINANCIAL COMMENTS: RECOMMENDED ACTION: ACTION TAKEN BY COUNCIL: Staff recommends approval of this intersection closure. 1 #D. Tap -Belt Line intersec. closure MEMORANDUM TO: Mayor and City Council FROM: Kenneth M. Griffin, P.E., Director of Engineering /Public Works DATE: April 12, 2011 REF: Discussion regarding restricting access through the Belt Line Road, Denton Tap Road and Southwestern Blvd. intersection for the reconstruction of the intersection with stamped concrete. Staff has been working on the design to remove and replace the pavers at the intersection of Belt Line/Denton Tap /Southwestern and reconstruct the intersection similar to the one at Sandy Lake and Denton Tap Road. It is anticipated that the project will be bid sometime during April 2011, so the successful responsible low bidder will be able to start work in the early summer. This will allow completion prior to the start of school in August 2011. The closure will be very similar to the one employed at the intersection of Sandy Lake and Denton Tap Road last summer. At least one lane of traffic will be allowed north and south on Denton Tap/Belt Line at all times. In an effort to expedite the traffic movement, the traffic signal operation will be manipulated to provide mostly green time for the north and south movement. The incoming traffic from E. Belt Line Road headed westbound from MacArthur Blvd. would be detoured at Sanders Loop down to the intersection of Sanders Loop and S. Belt Line Road. Because that intersection is not signalized, it would be very difficult for vehicles to merge into the traffic; therefore, temporary traffic signals will be placed at the intersection of Sanders Loop and S. Belt Line Road to allow traffic from Sanders Loop to enter S. Belt Line Road. This traffic signal will be coordinated with the one immediately south at the intersection of Airline Drive and S. Belt Line Road to allow for an orderly progression of traffic. Traffic that is normally on Southwestern Blvd. will begin being re- routed at the intersection of Southwestern and Freeport Parkway, either north to Bethel Road or south to Airline Drive. Traffic headed southbound on Coppell Road and any traffic generated by the businesses along Southwestern Blvd., between Coppell Road and Denton Tap Road, will be detoured west to Freeport Parkway and again north or south to Bethel Road or Airline Drive. It is anticipated that this project will take approximately the same time as the one at Sandy Lake and Denton Tap Road, given good weather during the course of the project. Last summer, we were fortunate that there were very few rain events and no rain events that entirely shut down work during the construction. The goal is to have all contracts in place prior to June 6, 2011 and the intersection open prior to the start of school in August. This project will be incentivized with bonuses to encourage the expediting of the construction. Staff will be available to answer any questions at the Council meeting. P, AREA REFERENCED BY AGENDA ITEM ?tt &. F r 0 1/2 1 1 INCH = 1 MILE 4 BELT LINE & DENTON TAP BRICK PAVER REPLACEMENT CITY OF COPPELL PROJECT MA 1 0 -06 OPPELL Created o¢ 6 Ap,l2011 by George Marshall S: \CAD \ln_Design \MA10 -O6 DT -BL Brick P— r\dwg \CC Exhibits\MA10 -06 CC EXHIBITS.dwg Created in AUtOCAD BELT LINE & DENTON TAP BRICK PAVER REPLACEMENT CITY OF COPPELL PROJECT MA 1 0 -06 0 25 50 OPPELL 1 INCH= 50 FEET pw Created on'. 6 Apri12011 by George Marshall S: \CAD \In Design \MA10 -O6 DT -BL Brick P— r\dwg \CC Erhibits\mA10 -06 CC EXHIBITS.dwg Created in AUtOCAD ILL Wb' .. iL �# y F - BETHEL 11 71, -j Qj J ' ^ a 4,i . n - �,q k S 0 500 1000 1 INCH= 1000 FEET AREA REFERENCV . BY AGENDA IT' ?F — a r L LT u m o �� L,,wr� TEMPORARY ' SIGNAL LIGHT IaE d o r— - BELT LINE & DENTON TAP BRICK PAVER REPLACEMENT PROPOSED ALTERNATE CITY ❑ F C❑ P P E L L PROJECT M A 1 0-06 ROUTE OPPELL Created on'. 6 Ap,l 2011 by George Marshall S: \CAD \ln_Design \MA10 -O6 DT -BL Brick P— r\dwg \CC Erhibits\mA10 -06 CC EXHIBITS.dwg Created in AUtOCAD AREA OF PROPOSED ROAD CLOSURE DAIRY QUEEN a . iL no 0 M _ ' a ,. - a =CHEVRON ` .. I y a� � BELT LINE & D E N T O N TAP ����������� I BRICK PAVER REPLACEMENT _rff * * *f * *vf *l CITY OF COPPELL PROJECT MA 1 0 -06 AREA OF PROPOSED 0 50 100 ROAD CLOSURE OPPELL 1 INCH = 100 FEET Created on'. 6 Ap,l 2011 by George Marshall S: \CAD \ln_Design \MA10 -06 DT -BL Brick P— r\dwg \CC Erhibits\MA10 -06 CC EXH IBITS.dwg Created in AUtOCAD `TEXACO CHICKEN RIVERSIDE EXPRESS ti+ CHURCH OF CHRIST r RIVEWAYS TO REMAIN OPEN AT ALL TIMES . A . a _ ' a ,. - a =CHEVRON ` .. I y a� � BELT LINE & D E N T O N TAP ����������� I BRICK PAVER REPLACEMENT _rff * * *f * *vf *l CITY OF COPPELL PROJECT MA 1 0 -06 AREA OF PROPOSED 0 50 100 ROAD CLOSURE OPPELL 1 INCH = 100 FEET Created on'. 6 Ap,l 2011 by George Marshall S: \CAD \ln_Design \MA10 -06 DT -BL Brick P— r\dwg \CC Erhibits\MA10 -06 CC EXH IBITS.dwg Created in AUtOCAD