Loading...
SW0801-CS110420 Apr.20.2011 10:44 AM Public Works 9724625199 PAGE. 1/ 1 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: Construction Inspector Engineering From: Frank Garza, Streets Department Date: April 20, 2011 RE: Denton Tap Sidewalk Project 1. We did walk -thru 4/15/11 and contractor was still pouring concrete. 2. We went back 4/18/11 and contractor was still working. 3. Checked 4 /20 /11 and all was O.K. except for a hairline crack in drain by Dairy Queen. CM' OFCOPPEELL PUBLIC WORKS DEPARTMENT