Bellacere Addn-CS110224
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
PD-227R3-TH-1, Bellacere Addition, a zoning change request from PD-
227R-SF-12 (Planned Development-227 Revision-Single Family-12)
to PD-227R3-TH-1 (Planned Development-227 Revision 2-
Townhouse-1), to allow the construction of eight (8) single-family
homes and two common area lots on 1.96 acres of property located
along the north side of Sandy Lake Road, approximately 150 feet east
of Summer Place Drive, at the request of Tommy Cansler, Timberland
Creek Companies.
STAFF REP.: Gary Sieb PROJECT ID# PD-11-0010
DRC DATE:
February 24, 2011 and March 3, 2011
CONTACT:
Michael Garza, E.I.T, Graduate Engineer 972/304-7019
COMMENT STATUS: PRELIMINARY FINAL REVISED
AFTER P&Z
1. There will be additional comments during detailed engineering plan review.
2. The right of way for Sandy Lake was already dedicated with the original plat
recorded in 2008. Show it as existing ROW.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
Bellacere Addition, Preliminary Plat, to subdivide 1.96 acres of property
into eight (8) single-family lots and two common area lots located
along the north side of Sandy Lake Road, approximately 150 feet east
of Summer Place Drive, at the request of Tommy Cansler, Timberland
Creek Companies.
STAFF REP.: Gary Sieb PROJECT ID# PP-11-0011
DRC DATE:
February 24, 2011 and March 3, 2011
CONTACT:
Michael Garza, E.I.T, Graduate Engineer 972/304-7019
COMMENT STATUS: PRELIMINARY FINAL REVISED
AFTER P&Z
1. There will be additional comments during detailed engineering plan review.
2. The right of way for Sandy Lake was already dedicated with the original plat
recorded in 2008. Show it as existing ROW.