North Gateway 6-CS110331
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
PD-240R3-HC, North Gateway Center, Lot 6, Block A, a zoning change
request from PD-240-HC (Planned Development-240-Highway
Commercial) to PD-240R3-HC (Planned Development-240 Revision
3-Highway Commercial), to amend the Concept Plan and attach a
Detail Site Plan to allow the development of a 4,171-square-foot
medical office on 0.63 acres of property located on the west side of
Denton Tap Road, approximately 420 feet north of S.H. 121, at the
request of Wilken Family Eye Care, being represented by Mike
Wright, M. J. Wright & Associates, Inc.
STAFF REP.: Matt Steer PROJECT ID# PD-11-0013
DRC DATE:
March 31, 2011 and April 7, 2011
CONTACT:
Michael Garza, E.I.T, Graduate Engineer 972-304-7019
COMMENT STATUS: PRELIMINARY FINAL REVISED
AFTER P&Z
1. The domestic water and meter should come off of the public main in Denton Tap.
2. You will need to provide for a future decel lane into this driveway.
3. The sidewalk should be 5’ off of the future decel lane. You may need to provide a 10’
street and sidewalk easement to accommodate the decel lane and sidewalk.
4. The fire lane and mutual access easement does not appear to match up with existing.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
North Gateway Center, Lot 6, Block A, Final Plat, to establish various utility
and fire lane easements to allow the development of a 4,171-square-
foot medical office on 0.63 acres of property located on the west side of
Denton Tap Road, approximately 420 feet north of S.H. 121, at the
request of Wilken Family Eye Care, being represented by Doug Stewart,
Texas Heritage Surveying, LLC.
STAFF REP.: Matt Steer PROJECT ID# FP-11-0014
DRC DATE:
March 31, 2011 and April 7, 2011
CONTACT:
Michael Garza, E.I.T, Graduate Engineer 972-304-7019
COMMENT STATUS: PRELIMINARY FINAL REVISED
AFTER P&Z
1. The domestic water and meter should come off of the public main in Denton Tap.
2. You will need to provide for a future decel lane into this driveway.
3. The sidewalk should be 5’ off of the future decel lane. You may need to provide a 10’
street and sidewalk easement to accommodate the decel lane and sidewalk.
4. The fire lane and mutual access easement does not appear to match up with existing.
5. Flood Plain signature block is missing.