PA9901-LR081205 GME 1 CONSULTING SERVICES, INC. Concrete Testing Report 2530 Electronic Lane, Suite 710 Dallas, Texas 75220 Phone (214) 351 -5633 Fax (214) 351 -5680 Project Name: Wagon Wheel Storage Building GME Project No.: 08.05.0269 -0010 Client Name: City of Coppell Date: 12/05/08 FIELD TEST DATA Location of Pour When Sampled: Piers: G -2, R.2 -2.4 and A -2 Contractor: Jamail & Smith Construction Supplier /Plant: Southern Star # 125 Sampled By: Bill Harvey Delivery Ticket No.: 1419388 Time Batched: 11:15 a.m. Sampled: 12:20 p.m. Truck No: 7039 Mix ID No.: 9453 Temperature: Air: 57° Concrete: 53 Load Size (cu. yds.): 10 Total Pour (cu. yds.): 20/54 Slump (inches): 4.75 Air Content ( %): -- Water Added on Site: 10 gallons* COMPRESSIVE STRENGTH TEST RESULTS Specimen Type: Cylinders Test Method: ASTM C -39 x, ASTM C -1231 , ASTM C -617 Set No. Lab No. Type Cure Date Tested Age in Days Failure Load Specimen Are Compressive (lbs.) (sq. in.) Strength (PSI) 1 C -5741 Lab 12/12/08 7 122,270 28.27 4324 1 C -5742 Lab 01/02/09 28 28.27 1 C -5743 Lab 01/02/09 28 28.27 1 C -5744 Lab H 28 SPECIFIED STRENGTH' 4000 psi Remarks: *water added by Jamail & Smith superintendent Briefing: Reference GME report # 08.05.0269.0009 GME Representative: Bill Harvey Travel Time: Reviewed By: nmc ,j� Time on Job: Distribution: City of Coppell Reporting: Jamail & Smith Construction Total Time: GME I CONSULTING SERVICES, INC. Pier Observation Report 2530 Electronic Lane, Suite 710 Dallas, Texas 75220 Phone (214) 351 -5633 Fax (214) 351 -5680 Project Name: Wagon Wheel Park Storage Building GME Project No.: 08.05.0269 -0009 Client Name: City of Coppell Date: 17/05/OR General Contractor: Jamail 8./ Smith GME Rep: Rill Harvey Pier Contractor: Dallas Foundation Concrete Supplier: Southern Star PIER INFORMATION Pier Designation C -1 B -1 C -2 A -1 A -2 *Building No. -- -- -- -- -- Date Drilled 12/05/08 12/05/08 12/05/08 12/05/08 12/05/08 Date Concrete Placed 12/05/08 12/05/08 12/05/08 12/05/08 12/05/08 Shaft Diameter (in) 48 48 48 48 48 *Bell Diameter (in) -- -- -- -- -- Vertical Steel (No., Size and Length) 6 #6/9.6' 6 #6/9.6' 6 #6/9.6' 6 #6/9.6' 6 #6/9.6' Reinforcing Steel Ties (No. and Spacing) #3 @ 16 "o.c. #3 @ 16 "o.c. #3 @16 "o.c. #3 @ 16 "o.c. #3 @16 "o.c. * Splices (Lap Length and Elevation) -- -- -- -- -- *Length of Casing (ft) and Diameter (in) -- -- -- -- -- Depth to Bearing Strata (ft) -- -- -- -- -- *Design Penetration (ft) -- -- -- -- -- *Actual Penetration (ft) -- -- -- -- -- Top of Pier Elevation (ft) 98.0 98.0 98.0 98.0 98.0 Ground Surface Elevation (ft) 99.5 99.5 99.5 99.5 99.5 Total Pier Depth (ft) 8.3 8.3 8.4 8.3 8.7 Bottom of Pier Elevation (ft) 91.2 91.2 91.1 91.2 90.8 Remarks: Reviewed By: nn..._ GME Representative: Bill Harvey *if applicable Page 2 of 5 GME f l CONSULTING SERVICES, INC. Pier Observation Report 2530 Electronic Lane, Suite 710 Dallas, Texas 75220 Phone (214) 351 -5633 Fax (214) 351 -5680 Project Name: Wagon Wheel Park Storage Building GME Project No.: 08.05.0269 -0009 Client Name: City of Cnppell Date: 17 /O5 /OR General Contractor: Jamail & Smith GME Rep: Bill Harvey Pier Contractor: Dallas Foundation Concrete Supplier: Southern Star PIER INFORMATION Pier Designation B.2 -2.4 A -3 C -3 A -4 A -5 *Building No. -- -- -- -- -- Date Drilled 12/05/08 12/05/08 12/05/08 12/05/08 12/05/08 Date Concrete Placed 12/05/08 12/05/08 12/05/08 12/05/08 12/05/08 Shaft Diameter (in) 48 48 48 48 48 *Bell Diameter (in) -- -- -- -- -- Vertical Steel (No., Size and Length) 6 #6/9.6' 6 #6/9.6' 6 #6/9.6' 6 #6/9.6' 6 #6/9.6' Reinforcing Steel Ties (No. and Spacing) #3 @ 16 "o.c. #3 @ 16 "o.c. #3 @ 16 "o.c. #3 @ 16 "o.c. #3 @ 16 "o.c. *Splices (Lap Length and Elevation) -- -- -- -- -- *Length of Casing (ft) and Diameter (in) -- -- -- -- -- Depth to Bearing Strata (ft) -- -- -- -- -- *Design Penetration (ft) -- -- -- -- -- *Actual Penetration (ft) -- -- -- -- -- Top of Pier Elevation (ft) 98.0 98.0 98.0 98.0 98.0 Ground Surface Elevation (ft) 99.5 99.5 99.5 99.5 99.5 Total Pier Depth (ft) 8.3 8.6 7.8 8.7 8.5 Bottom of Pier Elevation (ft) 91.2 90.9 91.7 90.8 91.0 Remarks: Reviewed By: nmc -. 1 GME Representative: Bill Harvey *if applicable Page 3 of 5 GME CONSULTING SERVICES, INC. Pier Observation Report 2530 Electronic Lane, Suite 710 Dallas, Texas 75220 Phone (214) 351 -5633 Fax (214) 351 -5680 Project Name: Wagon Wheel Park Storage Building GME Project No.: 08.05.0269 -0009 Client Name: City of Cnppell Date: 1 7/05/OR General Contractor: Jamail & Smith GME Rep: Bill Harvey Pier Contractor: Dallas Foundation Concrete Supplier: Southern Star PIER INFORMATION Pier Designation G -5 B -5 A.5 -2A B.2 -3 B.2 -4 *Building No. -- -- -- -- __ Date Drilled 12/05/08 12/05/08 12/05/08 12/05/08 12/05/08 Date Concrete Placed 12/05/08 12/05/08 12/05/08 12/05/08 12/05/08 Shaft Diameter (in) 48 48 48 48 48 *Bell Diameter (in) -- -- -- -- -- Vertical Steel (No., Size and Length) 6 #6/9.6' 6 #6/9.6' 6 #6/9.6' 6 #6/9.6' 6 #6/9.6' Reinforcing Steel Ties (No. and Spacing) #3 @16 "o.c. #3 @16 "o.c. #3 @16 "o.c. #3 (a 16 "o.c. #3 @16 "o.c. * Splices (Lap Length and Elevation) -- -- -- -- -- *Length of Casing (ft) and Diameter (in) -- -- -- -- -- Depth to Bearing Strata (ft) -- -- -- -- -- *Design Penetration (ft) -- -- -- -- -- *Actual Penetration (ft) -- -- -- -- -- Top of Pier Elevation (ft) 98.0 98.0 98.0 98.0 98.0 Ground Surface Elevation (ft) 99.5 99.5 99.5 99.5 99.5 Total Pier Depth (ft) 9.0 8.3 8.5 8.0 8.3 Bottom of Pier Elevation (ft) 90.5 91.2 91.0 91.5 91.2 Remarks: Reviewed By: nmc -/ f i'D`GZ_.- - GME Representative: Bill Harvey *if applicable Page 4 of 5 GME I CONSULTING SERVICES, INC. Pier Observation Report 2530 Electronic Lane, Suite 710 Dallas, Texas 75220 Phone (214) 351 -5633 Fax (214) 351 -5680 Project Name: Wagon Wheel Park Storage Building GME Project No.: 08.05.0269 -0009 Client Name: City of Coppell Date: 1 7 /05 /OR General Contractor: Jamail Rr Smith GME Rep: Rill Harvey Pier Contractor: Dallas Foundation Concrete Supplier: Southern Star PIER INFORMATION Pier Designation G -4 *Building No. -- Date Drilled 12/05/08 Date Concrete Placed 12/05/08 Shaft Diameter (in) 48 *Bell Diameter (in) -- Vertical Steel (No., Size and Length) 6 #6/9.6' Reinforcing Steel Ties (No. and Spacing) #3 @16 "o.c. * Splices (Lap Length and Elevation) -- *Length of Casing (ft) and Diameter (in) -- Depth to Bearing Strata (ft) -- *Design Penetration (ft) -- *Actual Penetration (ft) -- Top of Pier Elevation (ft) 98.0 Ground Surface Elevation (ft) 99.5 Total Pier Depth (ft) 8.0 Bottom of Pier Elevation (ft) 91.5 Remarks: Reviewed By: nmc / % GME Representative: Bill Harvey *if applicable Page 5 of 5 GME CONSULTING SERVICES, INC. Daily Report 2530 Electronic Lane, Suite 710 Dallas, Texas 75220 Phone (214) 351 -5633 Fax (214) 351 -5680 Project Name: Wagon Wheel Park Storage Building GME Job No: 08.05.0269 -0008 Client Name: City of Coppell Date: 12/05/08 Type Service: Pier Drilling Observation Weather: Sunny /cool Did Work Observed Meet Job Requirements: Yes Deviations Reported To: -- GME senior geotechnical engineer, Doug Ziolkowski, traveled to the job site to observe the beginning of the pier drilling operations. The GME engineer arrived on -site at 7:45 a.m. Upon arrival, the GME engineer met with GME field representative, Bill Harvey, who will be performing the pier observations services for GME. The GME engineer reviewed the project geotechnical report by GME to familiarize the field representative with the soil and groundwater conditions anticipated to be encountered. GME did not have any foundation plans; so, the GME engineer borrowed the concrete subs plan set to review and familiarize the GME field representative with the structural aspects of the project. GME made a field sketch of the pier layout plan. At arrival, the GME engineer found that none of the pier locations had been marked on the ground. The concrete subcontactor and his personnel completed layout at 9:15 a.m. Pier drilling by Dallas Foundation began at 9:25 a.m. at Piers C -1 and B -1. Both piers were drilled to 8.3 feet depth and were dry and relatively clean at completion. After observing the 1 pier job, the GME engineer felt confident the GME field representative was familiar with the job requirements and left the site. Briefing: Distribution: Travel Time: 1.00 City of Coppell Jamail & Smith Construction Time on Job: 2.00 Reporting: Total Time: 3.00 Reviewed by: nmc t`� GME Representative: Doug Ziolkowski Page 1 of 1 G'ME CONSULTING SERVICES, INC. Pier Observation Report 2530 Electronic Lane, Suite 710 Dallas, Texas 75220 Phone (214) 351 -5633 Fax (214) 351 -5680 Project Name: Wagon Wheel Park Storage Building GME Job No: 08.05.0269 -0009 Client Name: City of Coppell Date: 12/05/08 Type Service: Pier Installation Observation Weather: Clear /cool Did Work Observed Meet Job Requirements: Yes Deviations Reported To: -- A GME representative, Bill Harvey, arrived at the job site at 7:40 a.m. to observe pier installations. Initially, Mr. Harvey met with GME senior engineer, Doug Ziolkowski, to review pier layout, soil conditions and installation details and procedures. Pier layout was completed at 9:15 a.m. and drilling began at 9:20 a.m. A total of 16 -48" diameter strait t -shaft siers were completed in au:ered holes that were .lumb and reasonably clean and dry prior to concrete placement. Rebar cages were fabricated in general compliance with the design plans, and concrete was placed that appeared to be in general compliance with the design specifications. A total of 54 cubic yards of concrete was placed. A concrete slump test was performed, and one set of four concrete test cylinders was cast for strength verification. All pier work was completed at 4:10 p.m. GME representative left the job site at 4:15 p.m. Briefing: Distribution: Travel Time: 1.00 City of Coppell Jamail & Smith Construction Time on Job: 8.50 Reporting: Total Time: 9.50 Reviewed by: Lit •� /_ GME Representative: Bill Harvey Page 1 of 5