Loading...
PA9901-LR090206 Iu[1J ... CONSULTING SERVICES, INC. Concrete Testing Report 2530 Electronic Lane, Suite 710 Dallas, Texas 75220 Phone (214) 351 -5633 Fax (214) 351 -5680 Project Name: Wagon Wheel Storage Building GME Project No.: 08.05.0269 -0018 Client Name: City of Coppell Date: 02/06/09 FIELD TEST DATA Location of Pour When Sampled: Parking lot west entrance: 30' to 70'N Contractor: Jamail & Smith Construction Supplier /Plant: Southern Star # 125 Sampled By: John McRae Delivery Ticket No.: 1450545 Time Batched: 8:33 a.m. Sampled: 9:19 a.m. Truck No: 6221 Mix ID No.: -- Temperature: Air: 60° Concrete: 65° Load Size (cu. yds.): 10 Total Pour (cu. yds.): 20/70 Slump (inches): 6.0 Air Content ( %): 4.5 Water Added on Site: 25 gallons* COMPRESSIVE STRENGTH TEST RESULTS Specimen Type: Cylinders Test Method: ASTM C -39 x, ASTM C-1231 , ASTM C-617 Set No. Lab No. Type Cure Date Tested Age in Days Fa Load Specimen Are Compress (lbs.) (sq. in) Strength (PSI) 1 C -7105 Lab 02/13/09 7 88,860 28.27 3143 1 C -7106 Lab 03/06/09 28 28.27 1 C -7107 Lab 03/06/09 28 28.27 1 C -7108 Lab 11 28.27 SPECIFIED STRENGTH 3000 psi Remarks: *water added by subcontractor - -- Randy with Jamail & Smith informed of slump which is specified to be ± 4. Briefing: Reference (''MF report # 08.05.0269.0017 GME Representativ:. Jo 40 cRae ., Travel Time: Reviewed By: / Time on Job: Distribution: City of Coppell Reporting: Jamail & Smith Construction Total Time: 111, N lu .LA mi CONSULTING SERVICES, INC. Concrete Testing Report 2530 Electronic Lane, Suite 710 Dallas, Texas 75220 Phone (214) 351 -5633 Fax (214) 351 -5680 Project Name: Wagon Wheel Storage Building GME Project No.: 08.05.0269 -0018 Client Name: City Qf Coppelj Date: 02/06/09 FIELD TEST DATA Location of Pour When Sampled: Parking lot west entrance: 30' to 70'N Contractor: Jamail & Smith Construction Supplier /Plant: Southern Star # 125 Sampled By: John McRae Delivery Ticket No.: 1450545 Time Batched: 8:33 a.m. Sampled: 9:19 a.m. Truck No: 6221 Mix ID No.: -- Temperature: Air: 60° Concrete: 65° Load Size (cu. yds.): 10 Total Pour (cu. yds.): 20/70 Slump (inches): 6,0 Air Content ( %): 4.5 Water Added on Site: 25 gallons* COMPRESSIVE STRENGTH TEST RESULTS Specimen Type: Cylinders Test Method: ASTM C -39 x_, ASTM C -1231 , ASTM C -617 Set No. Lab No. Type Cure Date Tested Age in Days Failure Load Specimen Arel Compressive (lbs.) (sq. in.) Strength (PSI) 1 C -7105 Lab 02/13/09 7 88,860 28.27 3143 1 C -7106 Lab 03/06/09 28 124,520 28.27 4404 1 C -7107 Lab 03/06/09 28 121,010 28.27 4280 1 C -7108 e Lab H 28.27 SPECIFIED STRENGTH 3000 psi Remarks: *water added by subcontractor - -- Randy with Jamail & Smith informed of slump which is specified to be ± 4: Briefing: Reference GMF report # 08.05.0269.0017 GME Representative: John ' .e A Travel Time: Reviewed By: nm / / ;7 � ' 1" Time on Job: Distribution: Reporting: City of Coppell Jamail & Smith Construction Total Time: