Loading...
ST8804-CS 901004COPPgIJ~ PUBLIC WORKS MEMORANDUM DATE TO: F ROM RE: October 4, 1990 File Public Works Staff Developmental Fees - Park Place Addition Water/Sewer Impact Fees Water Impact 88 Lots @ $660.00 each 100% Due prior to Council approval of final plat. Wastewater Impact 88 Lots @ $422.00 each This fee will not be collected until an interlocal agreement is adopted between the Coppell MUD #1 and the City. Water Tap Fee (Inspection) 88 Lots @ $100.00 each 100% Due at time of Building Permit. Sewer Tap Fee (Inspection) 88 Lots @ $100.00 each 100% Due at time of Building Permit. $58,080.00 $37,136.00 $ 8,800.00 $ 8,800.00 Park Fees Park Place Addition 88 Lots @ $150.00 each 50% Due prior to Council approval of final plat by developer. 50% Due prior to building permits being issued by builder(s). $13,200.00 Street $i9n~ssessment SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $53.10 0 $ - Speed Limit 63.54 19 1207.26 Yield 58.56 0 - Stop 65.12 0 - Street Name 11.60 0 - Stop & Street Combo 96.85 8 774.80 Total $1982.06 100% Due prior to acceptance of subdivision. Street Light Assessment $292.60 per light for every 200 You are being assessed for 5377 lights. feet of roadway. ft. of roadway, which totals to 26 $292.60 x 26 lights = $7,607.60 100% Due prior to acceptance of subdivision. Roadway Assessment The above referenced subdivision fronts Sandy Lake length of 678.32 feet. Approximate cost of a four road in a six lane R.O.W. for this project is: Road for the lane divided 678.32 F.F. x $170.40 100% Due prior to final infrastructure. (Per F.F. ) acceptance $115,585.73 of the subdivision Construction Permit Fee $730,725 project cost x 2% = $14,614.50 100% Due at time of pre-construction conference. cc: Frank Trando, Finance Director Gary Sieb, Planning and Zoning Dale Jackson, Building Inspections COPPgLL PUBLIC WORKS DATE: TO: FROM: RE= October 4, 1990 File Public Works Staff Construction Fees for Heartz Road - North of Sandy Lake Construction Permit Fees - $600,000 Construction cost x 2% = $12,000.00 100% Due at time of pre-construction conference. Street Light Assessment - $292.60 per light for every 200 feet of roadway. You are being assessed for 2858 feet of roadway, which totals to 14 lights. - $292.60 x 14 lights = $4,096.40 100% Due prior to acceptance of Street Construction Street Sign Assessment SIGN UNIT PRICE 0UANTITY EXTENDED PRICE No Parking $53.10 0 $ - Speed Limit 63.54 2 127.08 Yield 58.56 0 - Stop 65.12 0 - Street Name 11.60 0 - Stop & Street Combo 96.85 2 193.70 Total $320.78 100% Due prior to acceptance of Street Construction. cc: Frank Trando, Finance Director Larry Davis, Public Works Inspector