ST8804-CS 901004COPPgIJ~ PUBLIC WORKS
MEMORANDUM
DATE
TO:
F ROM
RE:
October 4, 1990
File
Public Works Staff
Developmental Fees - Park Place Addition
Water/Sewer Impact Fees
Water Impact
88 Lots @ $660.00 each
100% Due prior to Council approval of final plat.
Wastewater Impact
88 Lots @ $422.00 each
This fee will not be collected until an interlocal
agreement is adopted between the Coppell MUD #1 and
the City.
Water Tap Fee (Inspection)
88 Lots @ $100.00 each
100% Due at time of Building Permit.
Sewer Tap Fee (Inspection)
88 Lots @ $100.00 each
100% Due at time of Building Permit.
$58,080.00
$37,136.00
$ 8,800.00
$ 8,800.00
Park Fees
Park Place Addition
88 Lots @ $150.00 each
50% Due prior to Council approval of final plat
by developer.
50% Due prior to building permits being issued by
builder(s).
$13,200.00
Street $i9n~ssessment
SIGN UNIT PRICE QUANTITY
EXTENDED PRICE
No Parking $53.10 0 $ -
Speed Limit 63.54 19 1207.26
Yield 58.56 0 -
Stop 65.12 0 -
Street Name 11.60 0 -
Stop & Street Combo 96.85 8 774.80
Total $1982.06
100% Due prior to acceptance of subdivision.
Street Light Assessment
$292.60 per light for every 200
You are being assessed for 5377
lights.
feet of roadway.
ft. of roadway, which totals to 26
$292.60 x 26 lights = $7,607.60
100% Due prior to acceptance of subdivision.
Roadway Assessment
The above referenced subdivision fronts Sandy Lake
length of 678.32 feet. Approximate cost of a four
road in a six lane R.O.W. for this project is:
Road for the
lane divided
678.32 F.F. x $170.40
100% Due prior to final
infrastructure.
(Per F.F. )
acceptance
$115,585.73
of the subdivision
Construction Permit Fee
$730,725 project cost x 2% = $14,614.50
100% Due at time of pre-construction conference.
cc:
Frank Trando, Finance Director
Gary Sieb, Planning and Zoning
Dale Jackson, Building Inspections
COPPgLL PUBLIC WORKS
DATE:
TO:
FROM:
RE=
October 4, 1990
File
Public Works Staff
Construction Fees for Heartz Road - North of Sandy Lake
Construction Permit Fees
- $600,000 Construction cost x 2% = $12,000.00
100% Due at time of pre-construction conference.
Street Light Assessment
- $292.60 per light for every 200 feet of roadway.
You are being assessed for 2858 feet of roadway, which totals
to 14 lights.
- $292.60 x 14 lights = $4,096.40
100% Due prior to acceptance of Street Construction
Street Sign Assessment
SIGN UNIT PRICE 0UANTITY
EXTENDED PRICE
No Parking $53.10 0 $ -
Speed Limit 63.54 2 127.08
Yield 58.56 0 -
Stop 65.12 0 -
Street Name 11.60 0 -
Stop & Street Combo 96.85 2 193.70
Total $320.78
100% Due prior to acceptance of Street Construction.
cc:
Frank Trando, Finance Director
Larry Davis, Public Works Inspector