ST9902-BD051129 (2)
ITEM NO. TEAGUE NALL AND PERKINS, INC. CO MTLTL \'G E \'GLti'EERS TNP JOB NO: CPL 00243 ENGINEER'S ESTIMATE: 54,683,610 BID DATE: November 29, 2005 BID TIME: 2:00 P.M. DESCRIPTION OF ITEMS M FIELD O FFI C E C ITY M S I G N PR S I G N G ENERAL S ITE PREPARATI REM EXI CO N C RETE CU RB O R CO N C RETE CU RB & GU TTER REM EXI CO N C RETE PA REM EXI CO N C RETE DRI AND S IDE W ALK S REM HMA PA REM & REL S TREET LI A U N C LA SS IFIED S TREET EX B MATERIAL 8" LIME S TABILIZED SU B G RADE LIME S TABILIZATI O N (424 8" C EMENT SU B G RADE TREATMENT C EMENT 6" REINF CO N C RETE PA W ITH 6" INTE CU RB 8" REINF CO N C RETE PA W ITH 6" INTE CU RB 6" CU RB & GU TTER REINF CO N C RETE S TREET HEADER ENHAN PA MEDIAN N 6" HMA PA TYPE B 4" HMA PA TYPE B 2" HMA PA TYPE D FLEXIBLE BA 6" REINF CO N C RETE DRI REPAIR G RA V EL DRI S TREET LI CO ND U IT P CO ND U IT S LEE V E S PA MARKIN 4" R W HITE REFLE TRAFFI B 4" R YELL REFLE TRAFFI B 4" R W HITE N - REFLE TRAFFI B 4" R W HITE / RED REFLE TRAFFI B TYPE III BARRI R S I G N A (NE IN R S I G N A (REL F IN MAINTAIN TRAFFI CO NTR O L DE F IN MAINTAIN AND REM ER CO NTR O L S 4" REINF CO N C RETE S IDE W ALK 6" REINF CO N C RETE TRAIL / BIKE PATH BARRIER FREE RAMP STREETLIGHT FOUNDATION Bid Tabulation Report Client: City of Coppell Description: West Sandy Lake Road - Phase I ST 99 -02A BIDDERS T JRJ Paving I Tiseo Paving I Site Concrete I LH Lacy I Jackson Construction I Mario Sinacola & Sons QUANTITY UNIT UNIT COST TOTAL UNIT COST TOTAL UNIT COST 1 LS $106,500.00 $106,500.00 $136,000.00 $136,000.00 $225,000.00 1 EA $14,000.00 $14,000.00 $43,500.00 $43,500.00 $20,000.00 1 EA $13,500.00 $13,500.00 $38,000.00 $38,000.00 $12,500.00 2 EA $1,000.00 $2,000.00 $550.00 $1,100.00 $550.00 1 LS $155,851.00 $155,851.00 $180,000.00 $180,000.00 $85,000.00 130 LF $12.02 $1,562.60 $10.00 $1,300.00 $10.00 2880 SY $4.29 $12,355.20 $8.40 $24,192.00 $10.00 150 SY $4.29 $643.50 $13.00 $1,950.00 $10.00 15125 SY $2.59 $39,173.75 $3.45 $52,181.25 $2.20 2 EA $682.50 $1,365.00 $1,000.00 $2,000.00 $3,375.00 12015 CY $15.63 $187 $10.50 $126 $11.00 1975 CY $0.00 $0.00 29221 SY $1.90 $55 $4.70 $137 $1.95 614 TON $106.80 $65 $100.00 $61 $100.00 10700 SY $2.29 $24 $4.70 $50 $1.95 225 TON $115.70 $26 $100.00 $22 $150.00 590 SY $37.39 $22 $35.00 $20 $29.50 35705 SY $32.82 $1 $28.95 $1 $30.50 450 LF $30.00 $13 $15.00 $6 $18.00 260 LF $25.00 $6 $10.00 $2 $40.00 1440 SY $85.05 $122 $73.00 $105 $85.00 20 EA $1 $39 $1 $32 $2 3315 SY $19.66 $65 $16.50 $54 $17.50 1210 SY $13.91 $16 $12.10 $14 $12.90 4525 SY $7.69 $34 $7.15 $32 $7.50 1320 SY $13.71 $18 $10.00 $13 $8.50 980 SY $37.39 $36 $35.00 $34 $40.00 115 SY $17.40 $2 $10.00 $1 $10.00 4520 LF $5.25 $23 $5.50 $24 $5.40 3075 LF $7.35 $22 $7.50 $23 $10.00 1 LS $3 $3 $4 $4 $8 1281 EA $5.51 $7 $6.05 $7 $8.25 560 EA $6.25 $3 $6.50 $3 $11.90 594 EA $2.21 $1 $2.35 $1 $3.25 196 EA $2.21 $433.16 $2.35 $460.60 $3.25 1 EA $875.00 $875.00 $1 $1 $650.00 55 EA $299.25 $16 $315.00 $17 $700.00 10 EA $157.50 $1 $200.00 $2 $300.00 1 LS $40 $40 $125 $125 $90 1 LS 1 $30 $30 $40 $40 $80 110 SY $31.50 $3 $30.25 $3 $36.00 990 SY $37.63 $37 $37.50 $37 $38.00 12 EA $750.00 $9 $1 $22 $2 33 EA $577.50 $19 $600.00 $19 $720.00 TOTAL UNIT COST $225,000.00 $200,000.00 $20,000.00 $22,000.00 $12,500.00 $13,000.00 $1,100.00 $1,600.00 $85,000.00 $170,000.00 $1,300.00 $2.00 $28,800.00 $5.00 $1,500.00 $4.00 $33,275.00 $6.50 $6,750.00 $3,400.00 $132,165.00 $13.34 $0.00 $56,980.95 $2.00 $61,400.00 $103.00 $20,865.00 $2.00 $33,750.00 $103.00 $17,405.00 $29.00 $1,089,002.50 $32.62 $8,100.00 $15.00 $10,400.00 $7.00 $122,400.00 $87.00 $42,000.00 $2,000.00 $58,012.50 $16.00 $15,609.00 $12.00 $33,937.50 $7.00 $11,220.00 $7.50 $39,200.00 $32.00 $1,150.00 $14.00 $24,408.00 $5.50 $30,750.00 $6.00 $8,500.00 $3,500.00 $10,568.25 $5.60 $6,664.00 $6.00 $1,930.50 $2.00 $637.00 $2.00 $650.00 $800.00 $38,500.00 $300.00 $3,000.00 $160.00 $90,000.00 $103,000.00 $80,000.00 $32,000.00 $3,960.00 $29.00 $37,620.00 $29.00 $27,600.00 $850.00 $23,760.00 $700.00 TOTAL UNIT COST $200,000.00 $200,000.00 $22,000.00 $50,000.00 $13,000.00 $17,000.00 $3,200.00 $400.00 $170,000.00 $175,000.00 $260.00 $7.00 $14,400.00 $5.00 $600.00 $10.00 $98,312.50 $3.00 $6,800.00 $3,500.00 $160,280.10 $13.65 $0.00 $58,442.00 $2.00 $63,242.00 $105.00 $21,400.00 $4.00 $23,175.00 $110.00 $17,110.00 $40.00 $1,164,697.10 $33.00 $6,750.00 $18.00 $1,820.00 $9.00 $125,280.00 $45.00 $40,000.00 $1,100.00 $53,040.00 $19.00 $14,520.00 $14.00 $31,675.00 $8.00 $9,900.00 $11.00 $31,360.00 $40.00 $1,610.00 $13.00 $24,860.00 $6.00 $18,450.00 $6.50 $3,500.00 $13,000.00 $7,173.60 $9.00 $3,360.00 $13.00 $1,188.00 $3.00 $392.00 $3.00 $800.00 $350.00 $16,500.00 $500.00 $1,600.00 $600.00 $103,000.00 $245,000.00 $32,000.00 $25,000.00 $3,190.00 $35.00 $28,710.00 $36.00 $10,200.00 $900.00 $23,100.00 $800.00 TOTAL UNIT COST $200,000.00 $210,000.00 $50,000.00 $30,000.00 $17,000.00 $20,000.00 $800.00 $2,500.00 $175,000.00 $340,000.00 $910.00 $10.00 $14,400.00 $10.00 $1,500.00 $15.00 $45,375.00 $4.00 $7,000.00 $4,000.00 $164,004.75 $15.00 $0.00 $58,442.00 $2.00 $64,470.00 $90.00 $42,800.00 $4.00 $24,750.00 $150.00 $23,600.00 $41.00 $1,178,265.00 $32.00 $8,100.00 $20.00 $2,340.00 $10.00 $64,800.00 $85.00 $22,000.00 $1,000.00 $62,985.00 $17.00 $16,940.00 $13.00 $36,200.00 $7.00 $14,520.00 $20.00 $39,200.00 $45.00 $1,495.00 $30.00 $27,120.00 $6.00 $19,987.50 $7.00 $13,000.00 $10,000.00 $11,529.00 $8.00 $7,280.00 $11.00 $1,782.00 $3.00 $588.00 $3.00 $350.00 $1,500.00 $27,500.00 $420.00 $6,000.00 $315.00 $245,000.00 $50,000.00 $25,000.00 $40,000.00 $3,850.00 $40.00 $35,640.00 $40.00 $10,800.00 $800.00 $26,400.00 $660.00 TOTAL $210,000.00 $30,000.00 $20,000.00 $5,000.00 $340,000.00 $1,300.00 $28,800.00 $2,250.00 $60,500.00 $8,000.00 $180,225.00 $0.00 $58,442.00 $55,260.00 $42,800.00 $33,750.00 $24,190.00 $1,142,560.00 $9,000.00 $2,600.00 $122,400.00 $20,000.00 $56,355.00 $15,730.00 $31,675.00 $26,400.00 $44,100.00 $3,450.00 $27,120.00 $21,525.00 $10,000.00 $10,248.00 $6,160.00 $1,782.00 $588.00 $1,500.00 $23,100.00 $3,150.00 $50,000.00 $40,000.00 $4,400.00 $39,600.00 $9,600.00 $21,780.00 Bid Tabulation Report TEAGUE NALL AND PERKINS, INC. Client: Cit of Coppell CONSU E,VG1,'VEEXV Description: West Sand Lake Road - Phase I ST 99-02A TNP JOB NO: CPL 00243 ENGINEER'S ESTIMATE: 54,683,610 BIDDERS BID DATE: November 29, 2005 BID TIME: 2: P.M. JRJ Pavin Tiseo Pavin Site Concrete LH Lac Jackson Construction Mario Sinacola & Sons ITEM NO. DESCRIPTION OF ITEMS QUANTITY UNIT UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL 1-45 SEGMENTAL RETAINING WALLS 615 SF $30.62 $18,831.30 $22.00 $13,530.00 $50.00 $30,750.00 $32.00 $19,680.00 $25.00 $15,375.00 $20.00 $12,300.00 1-46 RESTORE PARKWAYS AND DISTURBED AREAS 1 LS $48,230.00 $48,230.00 $50,000.00 $50,000.00 $35,000.00 $35,000.00 $70,000.00 $70,000.00 $60,000.00 $60,000.00 $5,000.00 $5,000.00 1-47 FURNISHING & PLACING TOPSOIL (6") 12040 SY $0.75 $9,030.00 $4.75 $57,190.00 $2.30 $27,692.00 $1.00 $12,040.00 $6.00 $72,240.00 $2.00 $24,080.00 1-48 REPAIR, REPLACE AND/OR MODIFY EXISTING IRRIGATION SYSTEMS 1 LS $8,000.00 $8,000.00 $25,000.00 $25,000.00 $15,000.00 $15,000.00 $2 $2,000.00 $12,000.00 $12 $15 $15 1-49 RELOCATE /ADJUST 12" WATER 3 EA $3 $9 $7 $22 $5 $16 $11 $34 $7 $21 $11 $33 1-50 ADJUST EXISTING VALVE BOX TO GRADE 28 EA $210.00 $5 $150.00 $4 $150.00 $4 $535.00 $14 $130.00 $3 $450.00 $12 1-51 ADJUST EXISTING WATER METER AND METER BOX 10 EA $630.00 $6 $50.00 $500.00 $410.00 $4 $653.00 $6 $200.00 $2 $1 $15 1-52 RELOCATE EXISTING WATER SERVICE, WATER METER AND METER BOX 2 EA $2 $5 $550.00 $1 $1 $2 $1 $3 $2 $5 $3 $6 1-53 CONNECT EXISTING SERVICE TO EXISTING 24" WATER LINE 1 EA $3 $3 $2 $2 $1 $1 $2 $2 $4 $4 $4 $4 1-54 ABANDON EXISTING WATER SERVICE 4 EA $525.00 $2 $270.00 $1 $465.00 $1 $800.00 $3 $200.00 $800.00 $750.00 $3 1-55 ABANDON EXISITNG WATER LINE 1 LS $5 $5 $550.00 $550.00 $15 $15 $5 $5 $9 $9 $20 $20 1-56 RELOCATE EXISTING AIR RELEASE VEN AND BOX 1 EA $3 $3 $1 $1 $1 $1 $1 $1 $7 $7 $5 $5 1-57 RELOCATE EXISTING BLOW OFF PIPE 1 EA $3 $3 $2 $2 $1 $1 $2 $2 $4 $4 $2 $2 1-58 CONNECT EXISTING 10" WATER LINE TO EXISTING 24" WATER LINE 1 EA $3 $3 $7 $7 $2 $2 $12 $12 $10 $10 $7 $7 1-59 CONNECT EXISTING 6" WATER TO EXISTING 24" WATER 1 EA $3 $3 $8 $8 $1 $1 $8 $8 $9 $9 $5 $5 1-60 8" WATER STUB-OUT 5 EA $5 $26 $4 $22 $3 $17 $6 $31 $5 $25 $8 $42 1-61 12" WATER STUB-OUT 2 EA $3 $7 $3 $7 $3 $7 $4 $8 $6 $12 $9 $18 1-62 SALVAGE & RELOCATE FIRE HYDRANT & VALVE ASSEMBLY 8 EA $4 $39 $2 $20 $1 $12 $2 $16 $2 $20 $6 $48 1-63 ADJUST FIRE HYDRANT 1 EA $1 $1 $400.00 $400.00 $700.00 $700.00 $1 $1 $1 $1 $2 $2 1-64 REMOVE FIRE HYDRANT & VALVE ASSEMBLY 1 EA $630.00 $630.00 $500.00 $500.00 $370.00 $370.00 $1 $1 $300.00 $300.00 $1 $1 1-65 ADJUST EXISTING SANITARY SEWER MANHOLES 8 EA $945.00 $7 $500.00 $4 $500.00 $4 $2 $16 $1 $12 $1 $14 1-66 CONCRETE ENCASEMENT OF SANITARY SEWER 45 LF $42.00 $1 $55.00 $2 $50.00 $2 $90.00 $4 $80.00 $3 $50.00 $2 1-67 TX3' REINFORCED CONCRETE BOX (RCB) 1288 LF $235.20 $302 $225.00 $289 $315.00 $405 $228.00 $293 $220.00 $283 $230.00 $296 1-68 6'X3' REINFORCED CONCRETE BOX (RCB) 762 LF $197.40 $150 $187.00 $142 $240.00 $182 $190.00 $144 $180.00 $137 $210.00 $160 1-69 4'X3' REINFORCED CONCRETE BOX (RCB) 205 LF $136.50 $27 $130.00 $26 $165.00 $33 $131.00 $26 $135.00 $27 $198.00 $40 1-70 1 4811 REINFORCED CONCRETE PIPE (RCP) 333 LF $147.00 $48 $121.00 $40 $155.00 $51 $133.00 $44 $285.00 $94 $175.00 $58 1-71 36" REINFORCED CONCRETE PIPE (RCP) 140 LF 1 $107.10 $14 $80.00 $11 $80.00 $11 $86.00 $12 $75.00 $10 $116.00 $16 1-72 33" REINFORCED CONCRETE PIPE (RCP) 301 LF $85.05 $25 $70.00 $21 $70.00 $21 $78.00 $23 $65.00 $19 $104.00 $31 1-73 30" REINFORCED CONCRETE PIPE (RCP) 389 LF $75.60 $29 $69.00 $26 $60.00 $23 $71.00 $27 $60.00 $23 $89.00 $34 1-74 1 2711 REINFORCED CONCRETE PIPE (RCP) 998 LF $68.25 $68 $52.00 $51 $50.00 $49 $65.00 $64 $50.00 $49 $79.00 $78 1-75 24" REINFORCED CONCRETE PIPE (RCP) 677 LF 1 $63.00 $42 $47.00 $31 $45.00 $30 $55.00 $37 $70.00 $47 $69.00 $46 1-76 2 REINFORCED CONCRETE PIPE (RCP) 540 LF $57.75 $31 $42.00 $22 $40.00 $21 $50.00 $27 $52.00 $28 $61.00 $32 1-77 18" REINFORCED CONCRETE PIPE (RCP) 274 LF $53.55 $14 $38.00 $10 $35.00 $9 $45.00 $12 $50.00 $13 $53.00 $14 1-78 1 10 , RECESSED CURB INLET 16 EA $2 $36 $2 $38 $2 $38 $2 $40 $2 $40 $2 $41 1-79 I2' RECESSED CURB INLET 6 EA $2 $15 $2 $16 $2 $16 $2 $16 $3 $18 $2 $16 1-80 I4' RECESSED CURB INLET 2 EA $2 $5 $3 $6 $3 $6 $3 $6 $4 $9 $3 $6 1-81 4x4 DROP INLET 2 EA $2 $4 $2 $5 $2 $5 $2 $4 $2 $5 $2 $4 1-82 1 4x4 GRATE INLET 1 EA $2 $2 $4 $4 $4 $4 $2 $2 $3 $3 $2 $2 1-83 TYPE A STORM DRAIN MANHOLE 4 EA $3 $12 $3 $14 $3 $13 $3 $15 $5 $22 $4 $18 1-84 TYPE B STORM DRAIN MANHOLE 2 EA $3 $7 $5 $10 $4 $8 $4 $9 $5 $10 $6 $13 1-85 MODIFIED TYPE B STORM DRAIN MANHOLE 2 EA $4 $8 $3 $7 $3 $6 $5 $10 $4 $8 $8 $17 1-86 1 TRENCH SAFETY 5907 LF $0.11 $649.77 $1.00 $5 $1.00 $5 $0.20 $1 $1.00 $5 $1.00 $5 1-87 RIPRAP, TYPE A 25 SY $57.75 $1 $55.00 $1 $55.00 $1 $64.00 $1 $80.00 $2 $60.00 $1 1-88 CONCRETE RIPRAP 150 SY $72.45 $10 $60.00 $9 $61.00 $9 $80.00 $12 $60.00 $9 $80.00 $12 1-89 HEADWALL FOR MULTIPLE BOX CULVERT 1 EA $9 $9 $10 $10 $10 $10 $11 1 $11 $8 $8,000.00 $1,6 $16 SUBTOTAL 1-1 THRU 1-89 $3,567,710.44 $3,620,940.00 $3,7 29,929.201 $3 53,018�11 $3,7 $4,1 Bid Tabulation Report TEAGUE NALL AND PERKINS, INC. Client: Cit of Coppell CONSULTING E,VG1,'VEEXV Description: West Sand Lake Road - Phase I ST 99-02A TNP JOB NO: CPL 00243 ENGINEER'S ESTIMATE: 54,683,610 BIDDERS BID DATE: November 29, 2005 BID TIME: 2:00 P.M. JRJ Pavin Tiseo Pavin Site Concrete LH Lac Jackson Construction Mario Sinacola & Sons ITEM NO. DESCRIPTION OF ITEMS QUANTITY I UNIT I UNIT COST I TOTAL I UNIT COST I TOTAL I UNIT COST I TOTAL I UNIT COST I TOTAL I UNIT COST I TOTAL I UNIT COST I TOTAL T-1 INSTALLATION OF HIGHWAY TRAFFIC SIGNALS 3 EA $19,162.50 $57,487.50 $20,000.00 $60,000.00 $20,000.00 $60,000.00 $19,000.00 $57,000.00 $20,000.00 $60,000.00 $19,000.00 $57,000.00 T-2 TRAFFIC SIGNAL POLE W/28 FOOT MAST ARM 1 EA $4,200.00 $4,200.00 $4,300.00 $4,300.00 $5,500.00 $5,500.00 $5,400.00 $5,400.00 $6,000.00 $6,000.00 $5,355.00 $5,355.00 T-3 TRAFFIC SIGNAL POLE W/32 FOOT MAST ARM 1 EA $4,462.50 $4,462.50 $4,600.00 $4,600.00 $6,000.00 $6,000.00 $5,900.00 $5,900.00 $6,200.00 $6,200.00 $5,775.00 $5,775.00 T-4 TRAFFIC SIGNAL POLE W/36 FOOT MAST ARM 2 EA $5,040.00 $10,080.00 $5,200.00 $10,400.00 $6,600.00 $13,200.00 $6,500.00 $13,000.00 $7,200.00 $14,400.00 $6,405.00 $12,810.00 T-5 TRAFFIC SIGNAL POLE W/40 FOOT MAST ARM 1 EA $5,250.00 $5,250.00 $5,400.00 $5,400.00 $6,900.00 $6,900.00 $6,800.00 $6,800.00 $7,500.00 $7,500.00 $6,720.00 $6,720.00 T-6 TRAFFIC SIGNAL POLE W/44 FOOT MAST ARM 3 EA $5,775.00 $17,325.00 $5,900.00 $17,700.00 $7,600.00 $22,800.00 $7,500.00 $22,500.00 $8,500.00 $25,500.00 $7,350.00 $22,050.00 T-7 TRAFFIC SIGNAL POLE W/48 FOOT MAST ARM 1 EA $5,749.59 $5,749.59 $6,000.00 $6,000.00 $7,800.00 $7,800.00 $7,700.00 $7,700.00 $8,600.00 $8,600.00 $7,560.00 $7,560.00 T-8 3-SECTION SIGNAL HEAD W/BACKPLATE 22 EA $708.75 $15,592.50 $725.00 $15,950.00 $810.00 $17,820.00 $800.00 $17,600.00 $900.00 $19,800.00 $800.00 $17,600.00 T-9 1 4-SECTION SIGNAL HEAD W/BACKPLATE 3 EA $892.50 $2,677.50 $925.00 $2,775.00 $1,100.00 $3,300.00 $1,100.00 $3,300.00 $1,000.00 $3 $1 $3 T-10 5-SECTION SIGNAL HEAD W/BACKPLATE 3 EA $1 $3 $1 $3 $1 $3 $1 $3 $1 $3 $1 $3 T -11 2" PVC CONDUIT 215 LF $5.25 $1 $6.00 $1 $5.40 $1 $5.00 $1 $6.00 $1 $6.00 $1 T-12 3" PVC CONDUIT 1160 LF $5.62 $6 $6.00 $6 $7.80 $9 $8.00 $9 $8.00 $9 $8.00 $9 T-13 GROUND BOXES 23 EA $63.00 $1 $650.00 $14 $420.00 $9 $420.00 $9 $400.00 $9 $400.00 $9 T-14 TRAFFIC SIGNAL CONTROLLER FOUNDATION 3 EA $1 $3 $1 $3 $1 $4 $1 $4 $1 $4 $1 $4 T-15 I CONDUCTOR 48 BARE WIRE 1498 LF $0.58 $868.84 $1.00 $1 $0.60 $898.80 $0.50 $749.00 $0.50 $749.00 $1.00 $1 T-16 I CONDUCTOR 46 XHHW WIRE 128 L $0.68 $87.04 $1.00 $128.00 $1.30 $166.40 $1.00 $128.00 $1.25 $160.00 $2.00 $256.00 T-17 I CONDUCTOR 48 XHHW WIRE 1500 LF $0.63 $945.00 $1.00 $1 $1.05 $1 $1.00 $1 $1.00 $1 $1.00 $1 T-18 I CONDUCTOR 412 XHHW WIRE 90 LF $0.53 $47.70 $1.00 $90.00 $0.50 $45.00 $1.00 $90.00 $0.40 $36.00 $1.00 $90.00 T-19 5 CONDUCTOR 412 GAUGE WIRE 1104 LF $1.31 $1 $2.00 $2 $1.05 $1 $1.00 $1 $1.00 $1 $1.00 $1 T-20 7 CONDUCTOR 412 GAUGE WIRE 687 LF $1.42 $975.54 $2.00 $1 $1.30 $893.10 $1.00 $687.00 $1.20 $824.40 $2.00 $1 T-21 10 CONDUCTOR 412 GAUGE WIRE 261 LF $1.52 $396.72 $2.00 $522.00 $2.70 $704.70 $3.00 $783.00 $2.50 $652.50 $3.00 $783.00 T-22 16 CONDUCTOR 412 GAUGE WIRE 1307 LF $2.73 $3 $3.00 $3 $3.50 $4 $3.50 $4 $4.00 $5 $4.00 $5 T-23 3 CONDUCTOR 418 GAUGE WIRE 1945 LF $0.95 $1 $1.00 $1 $0.70 $1 $1.00 $1 $0.70 $1 $1.00 $1 T-24 POWER SERVICE AND PEDESTAL EQUIPMENT 3 EA $3 $10 $3 $10 $5 $15 $5 $15 $5 $15 $5 $15 T-25 PEDESTRIAN PUSH BUTTON AND SIGN ASSEMBLIES 14 EA $105.00 $1 $110.00 $1 $180.00 $2 $170.00 $2 $180.00 $2 $168.00 $2 T-26 SPREAD SPECTRUM RADIO SYSTEM 3 EA $1,890.00 $5 $2 $6 $2 $6 $2 $6 $2 $6 $2 $6 T-27 YAGI SPREAD SPECTRUM RADIO ANTENNA AND MOUNTING BRACKETS 3 EA $446.25 $1 $450.00 $1 $500.00 $1 $500.00 $1 $500.00 $1 $500.00 $1 T-28 SSR COAXIAL CABLE 276 LF $3.15 $869.40 $4.00 $1 $1.90 $524.40 $2.00 $552.00 $2.00 $552.00 $2.00 $552.00 T-29 TRAFFIC SIGNAL FOUNDATIONS 119 LF $173.25 $20 $180.00 $21 $200.00 $23 $198.00 $23 $200.00 $23 $200.00 $23 T-30 PEDESTRIAN SIGNAL SECTIONS 14 EA $525.00 $7 $550.00 $7 $725.00 $10 $717.00 $10 $800.00 $11 $700.00 $9 T-31 PEDESTAL POLE ASSEMBLIES 3 EA $703.50 $2 $725.00 $2 $450.00 $1 $444.00 $1 $500.00 $1 $500.00 $1 T-32 VIDEO IMAGING VEHICLE DETECTION SYSTEM (VIVDS) 3 EA $10 $31 $11 $33 $12 $36 $11 $34 $12 $36 $12 $36 T-33 VIVDS COAXIAL CABLE 2019 LF $3.68 $7 $3.00 $6 $1.40 $2 $1.40 $2 $1.30 $2 $2.00 $4 T-34 OPTICOM DETECTOR PHASE SELECTOR 3 EA $4 $12 $4 $12 $2 $6 $2 $6 $2 $6 $2 $6 T-35 UNI-DIRECTIONAL OPTICOM DETECTOR 9 EA $840.00 $7 $750.00 $6 $600.00 $5 $600.00 $5 $600.00 $5 $600.00 $5 T-36 UPS SYSTEM 3 EA $11 $33 $12 $36 $6 $18 $6 $18 $6 $19 $6 $18 T-37 TRAFFIC SIGNAL CONFIRMATION LIGHTS 9 EA $152.25 $1 $160.00 $1 $160.00 $1 $160.00 $1 $180.00 $1 $160.00 $1 T-38 FURNISHING ILLUMINATED STREET SIGN 9 EA $2 $25 $2 $19 $4 $38 $4 $37 $4 $37 $4 $37 T-39 INSTALLATION OF ILLUMINATED STREET SIGN NAMES 9 EA $262.50 $2 $300.00 $2 $430.00 $3 $430.00 $3 $450.00 $4 $420.00 $3 SUBTOTAL 1-1 THRU 1-89 $321,370.05 $340,847.00 $357,548.20 $349,826.10 $366,152.10 $353,980.00 TOTAL (A) $3,889,080.49 $3,961,787.00 $4,087,477.40 $4,102,844.80 $4,350,612.35 $4,466,014.00 NUMBER OF CALENDAR DAYS 300 300 380 380 400 365 DAYS - $2000 (B) $600,000.00 $600,000.00 $760,000.00 $760,000.00 $800,000.00 $730,000.00 TOTAL (A+B) $4,489,080.49 $4,561,787.00 $4,847,477.40 $4,862,844.80 $5,150,612.35 $5,196,014.00