MA1006-CS110518 (3) T N E C I T Y •O F
COPPELL
0E-=4.
r e f `- p q o
x A s ' t B
PRE- CONSTRUCTION MEETING
ATTENDANCE SHEET
PROJECT: MA 10 -06 Belt Line /Denton Tap Brick Paver Replacement
DATE: May 18, 2011 TIME: 9:00 a.m.
NAME
/� REPRESENTING PHONE FAX EMAIL ADDRESS
1. /� L/ Q7 5 Z %O
2. — 00i.1 RC( ie N. (tKay 1$ocn4i i4 Q 72- - 17L -g c Gaoler 6omany(TG corn
3. 4 / Cf ce/ , 1/ / )2. 3 ay- 2c7q 3 dY= 3 c 7 e ) /r, (4,,G eG /,( &�
4 . 6/o4y— o 4r6t7 9737 �r r•Sk -tl e cc e%
5. /�i147 Ge ' -i/CE Ac .iiet / 9 441491:0 9/9? mat i✓.41/cevz
6. C t /7734 -L a4s Oc ppeL/ &x.3 o v
7. fflt KC 6,01- 22P telbcnu.:¢,ti, `!'12
8. M 4 CniY S%J ens t 41 " / 'J(
9. s� � sue, ,N Z -1 - /SSif 4 bo.,...,
PROJECT: MA 10 -06 Belt Line /Denton Tap Brick Paver Replacement
NAME REPRESENTING PHONE FAX EMAIL ADDRESS
10. Algik f3oc Stf• w, —J evNa . 7Z)4 -13�3 (17z)a23_ 7 t m r.44 .,(4.... r/e...r..7.,
11. � t� Sii L CDP .
12.
13.
14.
15.
JIM BOWMAN CONSTRUCTION COMPANY, L.P.
2716 S. Rigsbee Dr. • Plano,Texas 75074 • (972)423-1313
May 18, 2011
Mr. George Marshall, P.E.
City of Coppell
255 E. Parkway Blvd.
Coppell, TX 75019
Re: JBCC Project#895—Belt Line& Denton Tap Brick Paver Replacement
We offer the following list of personnel for emergency contact purposes:
Name Title Cell Phone Home
Adrian Bowman Assistant GM (214)535-6588 (972)208-6018
Vicente Murillo Paving Superintendent (214)535-2804 (972)487-9362
Jim Bowman General Manager (214) 926-7398 (972)509-1599
Dusty DeFury Estimator (214)926-9554 (903)267-0533
Subcontractor Type of Work Phone
Metroplex Pavement Markings Pavement Markings (972)399-3500
North TX Bomanite Stamped Concrete (972)484-8465
Buyers Barricades Barricades/ Detours (817) 535-3939
Horizon Signals(via Buyers) Temporary Signals (610)256-6007
Please call if you have any questions.
Sincerely,
- •rian1°.owman
Assis;r:nt General Manager