Loading...
MA1006-CN110524 fiLLIMICE CWOTECI-1111CfiL • GEOTECHNICAL ENGINEERING OUP • ENVIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS ENGINEERING AND TESTING May 18, 2011 Mr. George S. Marshall, P.E. Phn: (972) 304 -3562 City of Coppell Fax: (972) 304 -3570 255 Parkway Blvd. Coppell, Texas 75019 Re: Belt Line & Denton Tap Brick Paver Replacement C.I.P. Project MA 10 -06 Coppell, Texas Engineering Inspection & Testing Services AGG Proposal No: P11 -0530C Dear Mr. Marshall: Alliance Geotechnical Group (AGG) is pleased to confirm our firm's interest in providing materials inspection and testing services for the proposed Belt Line & Denton Tap Brick Paver Replacement C.I.P Project MA 10 -06 project noted above. A schedule of unit fees for this project is attached. After reviewing our fee schedule if you have any questions, please contact the undersigned at (972) 444 -8889. If acceptable, please sign below and fax back to our office as our Authorization to Proceed. We look forward to the opportunity of working with you on this project. Respectfully submitted, ALLIANCE GEOTECHNICAL GROUP / . Perry akara, S.E.T. sen: ; o Y� Sr. Project Manager CMT D-• -rent Manager Approved by: Date: r Z Si ature M ! MBE 3228 Halifax Street • Dallas, Texas 75247 Tel: 972-444-8889 • Fax: 972-444-8893 • www.aggengr.com :Moa,a SCHEDULE OF FEES FOR CONSTRUCTION MATERIALS ENGINEERING & TESTING BELT LINE DENTON TAP BRICK PAVER REPLACEMENT COPPELL, TEXAS AGG PROPOSAL NO.: P11 -0530C DESCRIPTION OF SERVICES QUANTITY UNIT FEE UNIT FEE A. MASS GRADING, LIME AND WALL BACKFILL TESTING & INSPECTION • Moisture /Density Relationship of Soils (ASTM D -698) 2 @ $150.00 each $300.00 • Atterberg Limits 2 @ $50.00 each $100.00 • Lime Series ( 5 point PI method) @ $225.00 each $0.00 • Cement Series ( as needed) @ $375.00 each $0.00 • Sulfate Test @ $90.00 each $0.00 • Paving Subgrade Density Test (1 per 300 If/ lift) 18 @ $13.00 each $234.00 • Lime Gradation Test (1 per 300 If) @ $13.00 each $0.00 • Lime Depth Verification (1 per 300 If) @ $13.00 each $0.00 • Lime Subgrade In -Place Density Test (1 per 300 If) @ $13.00 each $0.00 • Sr. Engineering Tech to perform testing 26 @ $37.00 hour $962.00 • Sr. Engineering Tech to perform proof roll observation 12 @ $37.00 hour $444.00 • Project Manager 4 @ $75.00 hour $300.00 • Geotechnical Project Manager( as needed) @ $90.00 hour $0.00 • Sr. Geotechnical Engineer ( as needed) @ $110.00 hour $0.00 • Vehicle Charge 10 @ $35.00 trip $350.00 Sub -Total $2,690.00 B. CONCRETE & REINFORCING TESTING & INSPECTION • Concrete Inspection & Testing (regular time) 75 @ $37.00 hour $2,775.00 • Concrete Cylinder Test - (4 cyls per 100 cyd ) - Stamped Paving 16 @ $14.00 each $224.00 • Concrete Cylinder Test - (4 cyls per 100 cyd ) - Center Paving 12 @ $14.00 each $168.00 • Concrete Cylinder Test - (4 cyls per 100 cyd ) - Paving 20 @ $14.00 each $280.00 • Concrete Core Depth Checks ( 2" dia core / 300 If) @ $40.00 each $0.00 • Project Manager 2 @ $75.00 hour $150.00 • Vehicle Charge 19 @ $35.00 trip $665.00 Sub -Total $4,262.00 ESTIMATED TOTAL $6,952.00 P11 -0530C SCHEDULE OF FEES FOR CONSTRUCTION MATERIALS ENGINEERING & TESTING BELT LINE DENTON TAP BRICK PAVER REPLACEMENT COPPELL, TEXAS AGG PROPOSAL NO.: P11 -0530C DESCRIPTION OF SERVICES QUANTITY UNIT FEE UNIT FEE NOTES: 1. Overtime rates of 1.5 times the regular hourly rate will be charged for hours worked over eight (8) hours per day Monday thru Friday or any time before 7:00 a.m. or after 5:00 p.m. Service performed on Saturdays and Sundays will be billed at 1.5 times the regular hourly rate. Services performed on recognized holidays will be billed at 2.0 times the regular hourly rate. ( WILL BE BILLED TO CONTRACTOR) 2. All laboratory test fees are F.O.B. our laboratory; additional charge for sample pickup may apply. 3. Any additional tests will be billed on a hourly rate and charged at the applicable rate, portal -to- portal. 4. Additional test not specified in this proposal will be quoted upon request. 5. This proposal does not include any technician stand -by, non - readiness charges, and /or trips or re -tests of the previous failing tests. 6. The above unit rates are based on the following estimated schedule: * Proctor pickup - 1 estimated site visit * Subgrade proof rolling observation - 3 estimated site visits * Subgrade field density testing - 6 estimated site visits * Bomanite stamped concrete - 4 estimated concrete placement * Center detail concrete paving - 3 estimated concrete placements * Standard concrete paving - 5 estimated concrete placements * Concrete test cylinder pickup - 7 estimated site visits P11 -0530C