Loading...
Sales Tax 10C-CS110520Page 1 of 1 Leslie Henderson -Belt Line Geomtechnical Report From: George Marshall To: Ken Griffin Date: 5/20/201111:04 AM Subject: Belt Line Geo- technical Report CC: Leslie Henderson Attachments: Notice of termination ltr.doc Ken, GME started their work on Wednesday &Thursday this week. On Thursday Charlie Love was present with the arrow board and noticed the contractor had an unusual way of directing traffic (cussing &flipping the drivers off). This morning I heard about this and I have decided I would like to terminate their contract. So far they have only performed 8 bores for a total of 130 feet deep. The total number is 23 for a depth of 340 feet. Their anticipated schedule was only 3 days. We are providing the arrow board along with staff to move it so their slow progress is affecting the staff for traffic. At the beginning of the project Doug scheduled 2 meetings and canceled the day of. Please review the attached Notice of Contract Termination. I strongly believe this level of service is not acceptable. Please feel free to give me a call to discuss. Thank You, George George Marshall, PE City of Coppell Engineering 972- 304 -3562 469 - 964 -4731 file: HC: \Documents and Settings \lhenderson \Local Settings\Temp\XPgrpwise\4DD64AB3,,, 5/25/2011 Leslie Henderson -Belt Line Road Geomtechnical Report From: George Marshall To: ddodd @njdhs.com Date: Subject: CC: Attachments: Mr. Dodd, 5/20/20113:35 PM Belt Line Road Geo- technical Report Ken Griffin; Leslie Henderson Notice of termination ltr.doc Page 1 of 1 I would like to terminate the contract for professional services of GME. I have attached the letter I wish to send. Ken has directed me to send this over to you for approval. Thank You, George George Marshall, PE City of Coppell Engineering 972- 304 -3562 file: HC: \Documents and Settl*ngs\lhenderson\Local Settings \Temp \XPgrpwise \4DD68A4A... 5/25/2011