Loading...
ST0701-CN110531 E HALFF May 26, 2011 AVO 25816 Mr. Keith Marvin, P.E. City of Coppell Engineering Services 255 Parkway Boulevard Coppell, TX 75019 RE: Southwestern Blvd. — Road and Bridge Improvement Project No. ST 07 -01 Dear Keith: As previously discussed, we have prepared the attached amendment to our engineering services contract for the Southwestern Boulevard Road and Bridge Improvement Project. The amendment is for SUE services requested by the City for locating the 24- inch water main crossing Grapevine Creek. Thanks for the opportunity to be of continuing service to the City of Coppell Sincerely, HALFF ASSOCIATES B. David Littleton, P.E. Vice President HALFF ASSOCIATES, INC. 1: 1 25000s1 258161Admin \Correspondence1Letters\Ltr 2011 -05 -26 COC -Rd & Bridge.doc 1201 NORTH BOWSER ROAD TEL (214) 346 -6200 WWW.HALFF.COM RICHARDSON. TX 75081 -2275 FAX (214) 739-0095 CITY OF COPPELL CONSULTING ENGINEER'S CONTRACT PROJECT NO. ST 07-01 AMENDMENT TO SCOPE OF SERVICES I. Scope of Work Halff Associates will provide Subsurface Utility Engineering (SUE) services required to locate the 24 -inch water main crossing Grapevine Creek. A. Locate line in field; B. Tie location to survey control; C. Show water main location on construction plans and record drawings. II. Compensation Engineer shall be paid an additional lump sum amount of Two - thousand and no /100 Dollars ($2,000). AGREED: AGREED /ACCEPTED: THE CITY OF COPPELL HALFF ASSOCIATES, INC. By: By: v Date 5 Date C1 1 /, Attest: ��DD __ Attest: ZDAi I:\25000s1258161Admin \Contracts \City of Coppell\Amendment Rd & Bridge\Amendment #2 ST 07 -01 (2011- 05- 26).doc