1. We need to resolve the amount of sealant to be used on the control joints:
a) plans call for tool joint which is not feasible
b) contractor sawed the joints already
2. Alignment and tie -in to existing ADA ramp at Westminster Way
a) It would appear that if the alignment of the proposed 12' trail were modified to move
east, the conflict with the expanded metal fence and brick masonry pylon at the box
culvert could be reduced.
3. The question has come up whether to apply the 6" yellow centerline stripe
a) In the past, it has been Parks & Recs' request not to apply this stripe, but it is specified in
the contract.
4. The section of trail adjacent to Asbury Estates has surface water flowing from various lots.
This will cause water to travel over the proposed new trail.
a) Contractor has installed some 4" perforated pipe in an effort to relieve the surface water
effects.
b) It had to be done in my opinion, but it is not a pay item.
5. After reviewing the plans, I noticed that Pacheco Koch was listed as the civil engineering
firm, however, no engineer's seal or signature was applied to the plans.
6. As you are aware, there is an existing irrigation system in the 20' easement adjacent to
Asbury Estates and Asbury Manor. It is my understanding at this time that no provisions
were made for its replacement in this contract, and the intent is for the Asbury Manor,
Asbury Estates and Mansions on the Lake HOA's to replace this existing system at their cost.
a) Cross - sleeves need to be provided at various locations under the proposed 12' trail to
allow for re- installation of the above mentioned irrigation system at a later date.