Loading...
PA0101-LR040320 TLAM Consultants, Inc. Geotechnical, Environmental, Construction Materials Testing CONCRETE STRENGTH REPORT (ASTM C -39), (ASTM C -78), (ASTM C -298) OR (TEX- 418 -A), (TEX- 448 -A) Mr. Steve Jeske DATE: 03/20/2004 REPORT NO.: 4546 Jeske Construction Company JOB NO.: 035225 P.O. Box 59025 Dallas, TX 75229 PROJECT: Denton Creek/Ashbury Manor Hike and Bike Trail Cyl or Slump(in.) Air ( %) Strength (psi) Beam Date Date ASTM ASTM 28 -Day No. Location Break Made (C -143) (C -231) 7 -Day 28 -Day Specs. 15- A Andy Brown West Park, 02/23 02/16 4.25 2.1 (3600) -- B west of Denton Tap bridge 02/23 02/16 (3580) C joggers trail, runs under 03/15 02/16 4670 D bridge 03/15 02/16 4670 16- A Jogging trail, Sta. 4 +89 02/27 02/20 4.50 3.3 (2550 B 02/27 02/20 (2730) -- C 03/19 02/20 3610 D 03/19 02/20 3540 111 ( IA/ 1 REMARKS: Conical fracture on cylinders unless otherwise noted. ' Cylinder diameter 6.00" unless otherwise noted. d i 3° I I Area of cylinder 28.27 sq. in. unless otherwise noted. TEAM Consultants, Inc. lrf By: ��� Ti ' y Wooley cc: City of Coppell Parks /John Elias City of Coppell Parks /Larry Davis TBG Partners /Tom Woliver 2970 S. Walton Walker, Suite 101 Dallas, TX 75211 (214) 331 -4395 Fax (214) 331 -4458 3101 Pleasant Valley, Suite 101 Arlington, TX 76015 (817) 467 -5500 Fax (817) 468 -9920