PA0101-LR031220 TEAM Consultants, Inc.
Geotechnical, Environmental, Construction Materials Testing
CONCRETE STRENGTH REPORT
(AST C -39), (ASTM C -78), (ASTM C -298) OR (TEX- 418 -A), (TEX- 448 -A)
( Mr. Steve Jes DATE: 12/20/2003 REPORT NO.: 4-87
ruction Company JOB NO.: 035225
P.O. Box 59025
Dallas, TX 75229 PROJECT: Denton Creek/Ashbury Manor
Hike and Bike Trail
Cy1 or Slump(in.) Air ( %) Strength (psi)
Beam Date Date ASTM ASTM 28 -Day
No. Location Break Made (C -143) (C -231) 7 -Day 28 -Day Specs.
7- A Sidewalk at east of 11/28 11/20 3.00 3.0 (3020)* -
B field 12 11/28 11/20 (3050)*
C 12/18 11/20 4090
D 12/18 11/20 4160
•
* 8 day break due to Holiday
Kit
REMARKS: Conical fracture on cylinders unless otherwise noted. / f
Cylinder diameter 6.00" unless otherwise noted.
Area of cylinder 28.27 sq. in. unless otherwise noted. fi LO
TEAM Consuli:Iits Inc.
i
B (----5 ,, '.
lrf Tinny Wooley
cc: City of Coppell Parks /John Elias
City of Coppell Parks /Larry Davis
TBG Partners/Tom - Woliver-------------- . -_.___
2970 S. Walton Walker; Suite 101 Dallas, TX 75211 (214) 331 -4395 Fax (214) 331 -4458
3101 Pleasant Valley, Suite 101 Arlington, TX 76015 (817) 467 -5500 Fax (817) 468 -9920