Loading...
PA0101-LR031206 TEAM Consultants, Inc. Geotechnical, Environmental, Construction Materials Testing CONCRETE STRENGTH REPORT (ASTM C -39), (ASTM C -78), (ASTM C -298) OR (TEX- 418 -A), (TEX - 448 -A) Mr. Steve Jeske DATE: 12/06/2003 REPORT NO.: 11/20 Jeske Construction Company JOB NO.: 035225 P.O. Box 59025 Dallas, TX 75229 PROJECT: Denton Creek/Ashbury Manor Hike and Bike Trail Cyl or Slump(in.) Air ( %) Stren th (psi) Beam Date Date ASTM ASTM 28 -Day No. Location Break Made (C -143) (C -231) - ay 1 8 - Day Specs. 5- A Bike trail at Field 15 11 /11 11/04 5.50 3.0 (3240) B 11 /11 11/04 (3180) C 12/02 11/04 4210 D 12/02 11/04 ` 4230 f , \ \ .Q../ o -77 REMARKS: Conical fracture on cylinders unless otherwise noted. Cylinder diameter 6.00" unless otherwise noted. Area of cylinder 28.27 sq. in. unless otherwise noted. TEAM Consultants, Inc. lrf By Timmy Wooley cc: City of Coppell Parks /John Elias City of Coppell Parks /Larry Davis TBG Partners /Tom Woliver 2970 S. Walton Walker; Suite 101 Dallas, TX 75211 (214) 331 -4395 Fax (214) 331 -4458 3101 Pleasant Valley, Suite 101 Arlington, TX 76015 (817) 467 -5500 Fax (817) 468 -9920