Loading...
Wellsite-ES071221 TAR2 DfAP co z.o PIPELINE EASEMENT AND RIGHT OF WAY AGREEMENT THE STATE OF TEXAS § KNOW ALL PERSONS BY THESE PRESENTS: COUNTY OF § DALLAS § This Pipeline Easement and Right of Way Agreement ( "Agreement ") is by and between COMMUNITY BANK & TRUST, WACO, TEXAS, TRUSTEE OF THE REBECCA ABIGAIL - RAPOPORT 1989 TRUST DATED DECEMBER 19,1989 and COMMUNITY BANK & TRUST, WACO, TEXAS, TRUSTEE OF THE EMILY PALMER RAPOPORT 1989 TRUST DATED DECEMBER 19, 1989 (collectively "Grantor ") and TEXAS MIDSTREAM GAS SERVICES, LLC ( "Grantee "). RECITALS A. Grantor is the owner of the surface of certain lands (the "Land"), part of which is described on Sheet 2 of Exhibit A attached hereto ( "Easement Tract "). B. Grantee wishes to receive a right of way and easement (the "Easement ") across a portion of the Lands as such right of way and easement is more particularly described on Sheet 2 of Exhibit A. C. Grantor wishes to grant the Easement to Grantee and Grantee wishes to accept the Easement and use the Easement, all pursuant and subject to the terms of this Agreement. GRANT OF EASEMENT AND AGREEMENT Now therefore, for and in consideration of $100.00 and other good and valuable consideration (including additional cash consideration [the "Initial Consideration "] to be paid by Grantee concurrent with the execution and delivery of this Agreement by Grantor), the receipt and sufficiency of which are hereby acknowledged, Grantor and Grantee agree as follows: 1. Grant of the Easement. Grantor hereby grants, sells and conveys to Grantee, its successors and assigns, a Easement under and across the Easement Tract, to lay, construct, inspect, maintain, repair, operate, alter, abandon in place and remove at will, in whole or in part, a pipeline (the "Pipeline ") for the transportation of oil, gas, petroleum and other gases, fluids or substances which can be transported through an underground pipeline and all underground appurtenant facilities thereto, including without limitation, all, valves, fittings, graphite and steel anodes and other underground devices for the control of pipeline corrosion, and similar appurtenances as may be necessary or convenient in the operation of said pipeline(s), as well as those legally required above - ground "pipeline warning" signs (the "Surface Signs ") located within the Easement Tract (collectively, the "Equipment"), over, across, under and upon the Easement Tract. PIPELINE EASEMENT AND RIGHT OF WAY AGREEMENT Page 1 of 6 G: \WPDocs \BLG \jeb \FASHGL29 PipelineEasement.doc 2. Temporary Construction Easement. Grantor also grants to Grantee a temporary construction easement (the "Temporary Construction Easement ") over, across and through (i) a variable width strip of land ( "Temporary Workspace ") running along and adjacent to the Easement Tract, as shown on Sheet 3 of Exhibit A, and (ii) two roughly square "Additional Workspace" areas, each as shown on Sheet 4 of Exhibit A. Grantee shall give at least 72 hours written notice to Grantor prior to the commencement of construction of the Pipeline or any part thereof. The Temporary Construction Easement granted herein will terminate and cease upon completion of the installation and testing of the Pipeline and Equipment or March 1, 2008, whichever is earlier. Notwithstanding anything herein to the contrary, all components of the Pipeline and Equipment (other than the Surface Signs) shall be constructed at a depth of seven (7) feet or more below existing grade. 3. Grantee's Use of the Easement. Grantee shall have all of the rights and benefits necessary and convenient for the full enjoyment and use of the Easement and the rights herein granted, including, without limitation, the right of ingress to and egress to and from the Easement and the right from time to time to cut all trees, undergrowth and other obstructions that, in Grantee's reasonable judgment, may injure, endanger or interfere with the Grantee's use of the Easement Tract. Subject to Paragraph 8(b) below, Grantor shall not construct nor permit to be constructed, any house, building or any other structure or facility on the Easement Tract without the express prior consent of Grantee, such consent not to be unreasonably withheld. If certain trees are marked by Grantor as "To be Preserved ", Grantor and Grantee agree to work in good faith to preserve such trees to the extent possible. Grantor agrees not to impound water over the Easement without the prior approval of Grantee. 4. Covenants Running With the Land. This Agreement, together with the other provisions of this grant of Easement, shall constitute covenants running with the land, binding upon and inure to the benefit of Grantor and Grantee, and their respective heirs, legal representatives, successors and assigns. Grantee's rights hereunder may be assigned in whole but not in part. 5. Surface Damage Payments. The Initial Consideration paid by Grantee to Grantor includes any and all damages that may be sustained by original construction of the Pipeline within the Easement, including without limitation, cutting trees and damages to land, trees, fences and growing crops (to the extent allowed hereafter). After the original construction of the Pipeline, and if not repaired in the normal course of business, Grantee will pay to the owner of the Land and, if leased, to his tenant, actual damages done to timber, fences, growing crops, landscaping, driveways, parking areas and other surface features and improvements by reason of entry to repair, maintain and remove said Pipeline, or for any future construction within the Easement done by Grantee. 6. Reversion. The Easement granted herein, and all rights and privileges in connection herewith, shall automatically revert to Grantor, its successors and assigns, if and when the Easement shall cease to be used by Grantee for the aforesaid purposes for a period of twelve (12) consecutive months without suspension of use for regulatory reasons or events of force majeure. 7. Indemnity. Grantee hereby indemnifies and holds harmless Grantor, its successors and assigns and all such parties' officers, directors, trustees, shareholders, beneficiaries, partners, and shareholders (collectively, "Grantor Parties ") from and against and all loss, cost, liability, expense or obligation of every kind and character, seen and unforeseen, including reasonable attorney's fees that Grantor Parties or any of them may suffer or be threatened with relating to, directly or indirectly, the PIPELINE EASEMENT AND RIGHT OF WAY AGREEMENT Page 2 of 6 G: \WPDocs \BLG \jeb \FASHGL29 PipelineEasement.doc Pipeline, the Equipment or any use thereof or any use of the Easement by Grantee, its successors or assigns or any third party. 8. Additional Provisions. (a) Grantee will utilize the Easement Tract only for the Pipeline and Equipment. Except as provided in Paragraph 8(b) below and except for the Pipeline and Equipment, no structures, improvements or impediments shall be constructed on, under or across any portion of the Easement Tract. (b) To the extent that such uses are consistent with applicable laws, rules and regulations, Grantor, its successors and assigns, reserve, retain, and shall have the right to fully use and enjoy the said premises covered by the Easement Tract, including the right to lay out and construct and maintain streets, alleys, landscaping, signage, lighting and lighting poles and equipment, parking lots, fences, walls and utilities across said Easement Tract, provided that such improvements do not endanger or interfere with the normal operation of the Pipeline. Grantor shall notify Grantee at least thirty (30) days in advance of the construction or installation of any improvements on the Easement Tract. Grantor reserves the right to use the Easement Tract in common with Grantee, provided that such use(s) do not endanger or interfere with the normal operation of the Pipeline and Equipment and provided Grantor maintains minimum clearances over the Pipeline, and minimum distances from the Pipeline and Equipment as required by prudent and customary engineering practices, standards, and applicable laws, rules, regulations and codes. Grantor may not erect buildings on or over any portion of the Easement Tract. (c) In addition to the consideration recited above for the grant of this easement, after the installation of the Pipeline and Equipment, Grantee agrees to restore the Easement Tract and any lands within the Temporary Construction Easement, to a condition as good as exists on the date prior to any work, including but not limited to fences, driveways, parking areas, drainage channels, terraces, landscaping, and other improvements damaged by the installation of the Pipeline and Equipment. All installation and restoration work shall be completed by Grantee by March 1, 2008. (d) Grantee shall, at its sole cost and expense, install and at all times maintain the Pipeline and Equipment within the Easement Tract in a good and workmanlike manner. Grantee agrees to repair and restore any damage or injury (including, without limitation, paving, driveways, parking areas, fences, landscaping, and other surface features) to the Easement Tract and the land adjacent thereto (the "Adjacent Land") caused or occasioned by the installation, operation, maintenance, repair, or removal of the Pipeline and or Equipment. (e) This conveyance is expressly subject to all existing rights -of -way and other matters of record or visible upon inspection of the Easement Tract. It is the intent of the Parties that this Agreement grants Grantee an interest in the surface only, and not in the minerals under the Easement Tract. Accordingly, Grantor expressly reserves and PIPELINE EASEMENT AND RIGHT OF WAY AGREEMENT Page 3 of 6 G: \W'PDocs \BLG \jeb \FASHGL29 PipelineEasement.doc retains a mineral reservation of all of Grantor's and all other existing interests in and to all oil, gas and other minerals on, in or under the Easement Tract. (f) The easements, covenants, and restrictions set forth in this Agreement shall run with the land and shall be binding on Grantor and Grantee, their successors and assigns. (g) Nothing contained in this agreement is intended to nor shall it be construed as dedicating any easements or rights to any other party or entity except as expressly set forth herein. (h) If and to the extent that Grantor requires that the Pipeline and/or Equipment be moved or relocated within the Easement Tract, Grantee agrees to cooperate with Grantor and Grantor's plans, provided that all costs and expenses for such a relocation of the Pipeline and/or Equipment shall be borne solely by Grantor. 9. Entire Agreement. This Agreement constitutes the entire understanding among the Grantor and Grantee, their respective partners, members, trustees, shareholders, officers, directors and employees with respect to the subject matter hereof, superseding all negotiations, prior discussions and prior agreements and understandings relating to such subject matter. 10. Counterpart Signatures. Grantor and Grantee may execute this Agreement in any number of counterparts, each of which shall be deemed an original instrument, but all of which together shall constitute but one and the same instrument. The parties agree that facsimile signatures are binding. 11. Notices. All notices given or required under this Agreement shall be given in writing and shall be given either by hand delivery or by depositing such notice in the United States first class mail, postage prepaid, by certified or registered mail, return receipt requested, addressed to the party to be notified at the following address, or such other address as any such party shall from time to time designate in writing: TO GRANTOR: TO GRANTEE: % Larry D. Jaynes TEXAS MIDSTREAM GAS SERVICES, LLC THE REBECCA ABIGAIL RAPOPORT 1989 Post Office Box 18162 TRUST and THE EMILY PALMER Oklahoma City, Oklahoma 73154 -0162 RAPOPORT 1989 TRUST Attn: Director — Right of Way Coordination 5400 Bosque Boulevard, Suite 302 Waco, Texas 76710 and to: COMMUNITY BANK & TRUST Post Office Box 2303 Waco, Texas 76703 -2303 Attn: Trust Department PIPELINE EASEMENT AND RIGHT OF WAY AGREEMENT Page 4 of 6 G: \WPDocs \BLG \jeb \FASHGL29 PipelineEasement.doc with copy to: PAKIS, GIOTES, PAGE & BURLESON, P.C. Attn: John Burleson Post Office Box 58 Waco, Texas 76703 -0058 In witness whereof, Grantor and Grantee have executed this Agreement on the dates set forth in the acknowledgments below. GRANTOR: GRANTEE: THE REBECCA ABIGAIL RAPOPORT 1989 TEXAS MIDSTREAM GAS SERVICES, TRUST LLC, an Oklahoma limited liability company By: COMMUNITY BANK & TRUST, Trustee By: Name: E • C. JO NSON J)PA Title: Preside By: Name: STEVE DOW Title: Vice President and Trust Officer THE EMILY PALMER RAPOPORT 1989 TRUST By: COMMUNITY BANK & TRUST, Trustee By: —6 4= q). 2 -- -L41,---- Name: STEVE DOW Title: Vice President and Trust Officer PIPELINE EASEMENT AND RIGHT OF WAY AGREEMENT Page 5 of 6 G: \WPDocs \BLG \jeb \FASHGL29 PipelineEasement.doc THE STATE OF TEXAS § COUNTY OF McLENNAN § THIS INSTRUMENT was acknowledged before me on the,day of October, 2007, by STEVE DOW, Vice President and Trust Officer of COMMUNITY BANK & TRUST, Trustee of THE REBECCA ABIGAIL RAPOPORT 1989 TRUST, on behalf of said trust. 0 STACY L KOLAR MY COMMISSION EXPIRES ^ s ' December 10, 2008 N4 ry ' ublic, State of Texas THE STATE OF TEXAS § COUNTY OF McLENNAN § THIS INSTRUMENT was acknowledged before me on the,rA r '` day of October, 2007, by STEVE DOW, Vice President and Trust Officer of COMMUNITY BANK & TRUST, Trustee of THE EMILY PALMER RAPOPORT 1989 TRUST, on behalf of said trust. AV -s STACY L KOLAR ". M �V ' _ MY COMMISSION EXPIRES ' >f < ' � December 10, 2008 �•� Nog 'ublic, State of Texas THE STATE OKLAHOMA § COUNTY OF OKLAHOMA § THIS INSTRUMENT was acknowledged before me on the /71 day of Qsteber, 2007, by JAMES C. JOHNSON, President of TEXAS MIDSTREAM GAS SERVICES, LLC, an Oklahoma limited liability company, on behalf of said limited liability company. S � ca 1 (111 ° y c_ Notary Public, Sta Df Oklahoma :' # 0700165 EXP. 02/20/11E PIPELINE EASEMENT AND RIGHT OF WAY AGREEMENT Page 6 of 6 G: \WPDocs \BLG \jeb \FASHGL29 PipelineEasement.doc A --- EXHIBIT "A" -- KI 1 HOUGHTON PROPERTIES L11# A SECURE LOCK � ® P .e /' BLOCK A. LOT 1 PD . X2`, ( ° RA / /,) VOL 2003106 0 or � � � � ry Sy PG. 13485 y A,' �PiV _ - 5$� yob �5 ON SS% 0 ) • REBECCA ABIGAIL AND EMILY PALMER RAPOPORT NORTHPOINT ADDITION SUBDIVISION #30293G 1 BLOCK 1, LOT 1 1 DFAP - 002.00 D20070358228 GREENWAY -GPV/ 1 A REPLAT OF A PART OF COPPELL PRTNRS LP FREEPORT NORTH NORTHPOINT ADDITION BLOCK 1, LOT 1 SUBDIVISION #302930 G O e1 VOL 98193 PG. 00031 BLACK 1, LOT 1 P �� ` VOL 97217 PG. 2461 VOL. 96097 PG. 3964 FELLOWSHIP CHURCH - i FELLOWSHIP CHURCH FELLOWSHIP OF LAS COUNAS ADDN FELLO SU 3658 ADDN SUBDIVISION #13658 BLOCK 1, LOT 1R-1 I DFAP- 001.00 D201143136 1 BLOCK 1, LOT 1R & 2 VOL. 94091 PG. 1680 • P :E OF , .� E / ,Ae Oy � , ' BASIS OF BEARING: THE EASTERLY LINE OF THAT PARCEL OF LAND AS DESCRIBED NA. • ••.•• � 5896 IN VOLUME 96097, PAGE 3964 OF THE DALLAS COUNTY RECORDS BEARS ;'0p Q y / S00'43'43 "E (GRID) IN THE STATE OF TEXAS NORTH CENTRAL 4202 ZONE. V: \ 52871\ ACTIVE\ 187107355 \DRAWING \EXHIBITS \07355_251 _DFW_AP \WORKING \07355_251 _EXHIBIT_002.00.DWG TEXAS MIDSTREAM GAS SERVICES PROPOSED PIPELINE CROSSING DFAP- 002.00 REBECCA AND EMILY RAPOPORT TRACT COUNTY OF DALLAS, STATE OF TEXAS /� �/ 004ri DFW AP PAD ROUTE DOWNTOWN DESIGN SERVICES, INC. D BY JRP 09/17/07 SCALE: 1 0 200' 3 10/19 JRP JMM ROUTE /ESMT ADJUSTMENT CHECKED SA 09/17/07 v Stantec Consulting Inc. aY 0 100 200 4c.) 2000 S Color Blvd 2 10/15 PDJ JMM OWNER NAME TR 2 PROJECT Ste 2 -300 ENGINEER Denver, CO 80222 1 10 / 11 PDJ SA REVISED PERMANENT ESMT SECTION Tel. 303.758. 058 HEAD Fox. .slonlec.com 303.7584828 REV. DATE BY APP, DESCRIPTION APPROVED w. BY SHEET 1 OF 5 EXHIBIT "A" ‘, POINT OF COMMENCEMENT i POINT OF 126'56'14" HOUGHTON lif"'111)-- S49'53'23 "E BEGINNING R=855.00' PROPERTIES LTD 68.84' RIGHT- L= 401.97' SECURE LOCK BLOCK A, LOT 1 6= 02'39'12" " �, CHB= S66'30'19" DFAP - 005.00 IN R= 845.00' S01'48 21 W OF -WAY CH= 388.28' VOL. 2003106 12.27' / L=39.27' / . . o PG. 13485 CHB = 551'13'00 "E / \.h NOrin,,, 1NT CH=39.26' / '... "'RIVE RIGHT- �1 S38'22'05 "E OF -WAY / o 142.67' ADDITIONAL \ �\ �\ k k, t.. 4 WORKSPACE \ \;\ 20' PERMANENT 5o •� ^ \ l� EASEMENT 4.1 ^ �. 1 60 VARIABL WIDTH 1 20,245 SF 5 0� SAME§ le'S WORK PACE# 0.465 ACt Pt ON y 5 UR I d A REPEAT OF I 4S N ito Q.+. i'' w FREEPORT NORTH 6 I `ro BLOCK 1, LOT 1 REBECCA ABIGAIL AND rM VOL 98193 PG. 00031 EMILY PALMER RAPOPORT 7 VOL. 97217 PG. 2461 GREENWAY -GPV/ NORTHPOINT ADDITION ADDITIONAL � o COPPELL PRTNRS LP SUBDIVISION #30293G WORKSPACE c n BASIS OF BEARING NORTHPOINT ADDITION BLOCK 1, LOT 1 I / SO0'43'43 "E SUBDIVISION #30293G DFAP- 002.00 S01'54'16 "E BLOCK 1, LOT 1 D20070358228 VOL. 96097 PG. 3964 L 47.25' FELLOWSHIP CHURCH I I 6 5 4;/ FELLOWSHIP CHURCH FELLOWSHIP OF POINT OF , A D O � G y FELLOWSHIP OF LAS COLINAS ADDN LAS COLINAS ADDN TERMINUS P' � SUBDIVISION #13658 SUBDIVISION #13658 1 0 %1 BLOCK 1, LOT 1R -1 DFAP- 001.00 N89'32'38 "E 1 5 0201143136 BLOCK 1, LOT 1R & 2 65.15' I VOL. 94091 PG. 1680 LEGAL DESCRIPTION OF PERMANENT EASEMENT A 20 FOOT WIDE EASEMENT ACROSS A PORTION OF THE BLOCK 1, LOT 1 OF NORTHPOINT ADDITION SUBDIVISION AS DESCRIBED IN #D20070358228 OF THE RECORDS OF DALLAS COUNTY, STATE OF TEXAS, SITUATED IN THE JAMES GIBSON SURVEY ABSTRACT NUMBER 586 AND JAMES GIBSON SURVEY, ABSTRACT NUMBER 1716D, BEING 10.00 FEET ON EACH SIDE OF THE FOLLOWING CENTERLINE; COMMENCING AT THE NORTHWEST CORNER OF SAID PARCEL; THENCE ALONG THE NORTHEASTERLY BOUNDARY OF SAID PARCEL, THE FOLLOWING THREE (3) COURSES; 1. S49'53'23 "E, A DISTANCE OF 68.84 FEET; 2. THENCE ALONG THE ARC OF A CURVE TO LEFT HAVING A CENTRAL ANGLE OF 02'39'12", A RADIUS OF 845.00 FEET, AND AN ARC LENGTH OF 39.27 FEET, THE CHORD OF WHICH BEARS S5113'00 "E, A DISTANCE OF 39.26 FEET; 3. THENCE S 01'48'21" W, A DISTANCE OF 12.27 FEET TO THE POINT OF BEGINNING; THENCE PARALLEL WITH AND 10 FEET SOUTHERLY OF THE SOUTHERLY ROW OF NORTHPOINT DRIVE ALONG THE ARC OF A NON- TANGENT CURVE TO LEFT HAVING A CENTRAL ANGLE OF 26'56'14 ", A RADIUS OF 855.00 FEET, AND AN ARC LENGTH OF 401.97 FEET, THE CHORD OF WHICH BEARS S6610'19 "E, A DISTANCE OF 388.28 FEET; THENCE S 3822'05" E, A DISTANCE OF 142.67 FEET; THENCE S 00'43'43" E, A DISTANCE OF 420.84 FEET; THENCE S 0115'16" E, A DISTANCE OF 47.25 FEET TO THE POINT OF TERMINUS ON THE SOUTHERLY BOUNDARY OF SAID PARCEL; PE ' FROM WHICH THE SOUTHEAST CORNER OF SAID PARCEL BEARS N 89'32'38" E, A Gj '� ,G1S f R E : o :9 , 41STANCE OF 65.15 FEET; 1 / • •.. THE SIDELINES OF SAID EASEMENT SHALL BE PROLONGED OR SHORTENED TO •y+ V I) , � ' COMMENCE AT THE BOUNDARY OF SAID PARCEL AND TERMINATE AT THE ° • - •P 5896 Pte: BOUNDARY OF SAID PARCEL TO ELIMINATE ANY GAP OR OVERLAP. ' e • CPESS10`:• f ,14•.....• ' v, CONTAINING AN AREA OF 20,245 SQUARE FEET OR 0.465 ACRES, MORE OR LESS. 7 V: \52871 \ ACTIVE \ 187107 \DRAWING \EXHIBITS \07355_251 _DFW_AP \ WORKING \07355_251 _EXHIBI T_002.00.DWG EASEMENT TABLE CENTERLINE LENGTH 1012.74 61.96 RDS. TEXAS MIDSTREAM GAS SERVICES EASEMENT AREA 20,245 S.F. 0.465 AC PROPOSED PIPELINE CROSSING TEMP. WORKSPACE 32,057 S.F. 0.736 AC DFAP- 002.00 ADO'L. WORKSPACE 62,094 S.F. 1.426 AC REBECCA AND EMILY RAPOPORT TRACT ��, �..I� ,r COUNTY OF DALLAS, STATE OF TEXAS L�. 20' PERMANENT EASEMENT DFW AP PAD ROUTE DOWNTOWN DESIGN SERVICES, INC. DRAWN JRP 09/17/07 SCALE: 1' • 200' .3 10/19 JRP JMM ROUTE /ESMT ADJUST CHECKED Stantec Consulting Inc. MENT e Y SA 09 /17/07 0 100 200 /� 2000 S Colorado 81v4 2 10/15 PDJ JMM OWNER NAME TR 2 PROJECT 1 Ste 2 -300 ENGINEER Te 30 .7 40282 1 10 11 PDJ SA REVISED PERMANENT ESMT SECTION Tel. 3 03.75 .482 / HEAD Fox. 303.758.4828 APPROVED ''. "rrslonlec.com REV. DATE BY APP. DESCRIPTION BY SHEET 2 OF 5 EXHIBIT "A" S49'53'23 "E- A= 09'05'32" 6 8.84' -R=865.00' POINT OF L= 137.27' COMMENCEMENT CHB= 558'02'1 "E A= 1703'05" HOUGHTON 4 CH= 137.12' X02'39'12" R= 865.00' PROPERTIES LTD R= 845.00' L= 257.43' SECURE LOCK 'L= 39.27' CHB=S7111'40"E BLOCK A, LOT 1 Sol 48 21 W DFAP- 005.00 CHB = 551'13 00 E 24.54' CH= 256.48 CH= 39.26' / VOL 2003106 / 50' PG. 13485 B GINNING // A D ive !Np E N29•59'05" ∎ // 50.05' ' ∎ / 60 S38'22'05 "E 135.33' ADDITIONAL 38'22'05 "W 108.38' 'k WORKSPACE ■15'O1'11" 20' PERMANENT 2c S� R= 915.00 EASEMENT 5 (1 4. ( 1 , ^ L= 239.86' VARIABLE WIDTH .r ^ CH =N70'02'00 "W TEMPORARY S00'43'42 "E 41345 CO CH= 239.17' WORKSPACE I 215.57' 16p 32,057 S.F. I A REPLAT OF �5 L�� E GOB Sp�! 0.736 AC± i A PART OF P0 J� ip VEYN00.43'43 "W- FREEPORT NORTH i BLOCK 1, LOT 1 5 REBECCA ABIGAIL AND195.00 r 60 VOL 98193 PG. 00031 EMILY PALMER RAPOPORT I I VOL 97217 PG. 2461 GREENWAY -GPV/ NORTHPOINT ADDITION I ADDITIONAL I I " , COPPELL PRTNRS LP SUBDIVISION #30293G I WORKSPACE I I S89'23'34 W 60.00 NORTHPOINT ADDITION I BLOCK 1, LOT 1 I I 1 BASIS OF BEARING SUBDIVISION #30293G ■ DFAP- 002.00 � , SOO'43'43 "E BLOCK 1, LOT 1 D20070358228 V L OL 96097 PG. 3964 FELLOWSHIP CHURCH I I 0,4) FELLOWSHIP CHURCH FELLOWSHIP OF 40 P ,CP y FELLOWSHIP OF LAS COLINAS ADDN LAS COLINAS ADDN �' 0� .4 SUBDIVISION #13658 SUBDIVISION #13658 ®� .1 BLOCK 1, LOT 1R -1 I DFAP- 001.00 5 D201143136 BLOCK 1, LOT 1R & 2 VOL 94091 PG. 1680 0 . A Gj � �� G \STFR e o : 9 ■ , • I Ci 41 ,3 �. • t , i Jl�ivv V: \52871 \ACTIVE \187107355 \DRAWING \EXHIBITS \07355_251 _DFW_AP \WORKING \07355_251 _EXHIBI T_002.00.DWG SEE SHEET 2 FOR TEXAS MIDSTREAM GAS SERVICES EASEMENT INFORMATION PROPOSED PIPELINE CROSSING DFAP - 002.00 REBECCA AND EMILY RAPOPORT TRACT COUNTY OF S, STATE OF TEXAS glardi VARIABLE DALLA TEMPORARY ORARY WORKSPACE DFW AP PAD ROUTE DOWNTOWN DESIGN SERVICES, INC. ° B Y ""N JRP 09/ SCALE: 1' ■ 200' 3 10/19 JRP NM ROUTE /ESMT ADJUSTMENT CHECKED SA 09/17/07 L.� Stantec Consulting Inc. By 2000 S Colorado Blvd 2 10/15 PDJ JIM OWNER NAME TR 2 PROJECT 100 200 er. ��' Ste 2 -300 ENGINEER l Telv .7 80282 1 10/11 PDJ SA REVISED PERMANENT ESMT SECTION Tel. 303.758.058 / HEAD Fa.. 303.758.4828 REV. DATE BY APP, DESCRIPTION APPROV .stontec.com I B Y I SHEE 3 OF 5 EXHIBIT "A" ‘....‘‘ ‘. 7 1,--,,,, .11 POINT OF S49'53'23 "E X04'46'48" COMMENCEMENT 68.84' R= 865.00' 402'39'12" L= 11.78' R= 845.00' CHB= 553'06'08 "E CH= 11.78' HOUGHTON L= 39.27' PROPERTIES LTD CHB= S51'13'00 "E S01'48'21 "W SECURE LOCK CH= 39.26' BLOCK A, LOT 1 24.54' POINT OF „ y . - DFAP- 005.00 X09'05 32 S29'59'0 BEGINNING VOL 2003106 R= 865.00' Allib.N%I. . '5 PG. 13485 L= 137.27' NO ._. __ CHB= S58'02'18 "E ' - N29'59'05 "E , ® VO 1 NT CH= 137.12 r N60 °00'55 "W �\� 60 150.00' ADDITIONAL 44eP - WORKSPACE 1 Z16D \ \ \ 20' PERMANENT co + (4% 01500 ACt s ea , — os G c v V WIDTH \ 1 j I EASEMENT �` ^ S OS yp� SuRVE WORKSPACE i BASIS OF BEARING TEMPORARY 500'43'43 "E P: G� N89'16'17 "E 60' ~ r A REPLAT OF I A g''' 0) N00'18'04 "W 193.85' I FR EP R 200.00 I I BLOCK 1, LOT 1 REBECCA ABIGAIL AND I VOL. 98193 PG. 00031 EMILY PALMER RAPOPORT I VOL. 97217 PG. 2461 ADDITIONAL GREENWAY -GPV/ NORTHPOINT ADDITION WORKSPACE COPPELL PRTNRS LP SUBDIVISION #30293G 500'43'43 "E NORTHPOINT ADDITION BLOCK BLOCK 1, LOT 1 40,301 S.F. I 201.50' SUBDIVISION #30293G DFAP - 002.00 0.925 AC± I POINT OF BLOCK 1, LOT 1 D20070358228 BEGINNING VOL. 96097 PG. 3964 NO2'15'31 "W I H r FELLOWSHIP CHURCH 46'97 65�OP� FELLOWSHIP CHURCH FELLOWSHIP OF S89'42'13 "W +� C9 FELLOWSHIP OF LAS COLINAS ADDN LAS COUNAS ADDN 201.50' �' a� J¢, SUBDIVISION #13658 SUBDIVISION #13658 ©� N W BLOCK 1, LOT 1R -1 I DFAP- 001.00 S89'32'38 "W 5 D201143136 BLOCK 1, LOT 1R do 2 75.16' POINT OF VOL. 94091 PG. 1680 COMMENCEMENT • '<; �G \STERF.9 Q- * O I A il ,, • AdAv i I4',, 5896 , i V: \52871 \ ACTIVE \ \DRAWING \EXHIBITS \07355_251 _DFW_AP \ WORKING \07355_251 _EXHIBIT_002.00.DWG SEE SHEET 2 FOR TEXAS MIDSTREAM GAS SERVICES EASEMENT INFORMATION PROPOSED PIPELINE CROSSING DFAP- 002.00 REBECCA AND EMILY RAPOPORT TRACT 12...11:3 COUNTY OF DALLAS, STATE TEXAS ADDITIONAL WORKSPACES DFW AP PAD ROUTE DOWNTOWN DESIGN SERVICES, INC. ° B Y E' JRP 09/17/07 SCALE: 1" .200 3 10/19 JRP JMM ROUTE /ESMT ADJUSTMENT CHECKED SA 09/17/07 v Stantec Consulting Inc. BY 0 100 200 `./ 2000 S Colorado Blvd 2 10/15 P0J JMM OWNER NAME TR 2 PROJECT Ste 2 -300 ENGINEER Oenver, CO 80222 1 10 / 11 PDJ SA REVISED PERMANENT ESMT S ECTION Tel. 303.758.4058 HEAD StalteC Fw. .slo 303 nteC.tom .758A828 REV. DATE BY APP. DESCRIPTION APPROVED BY SHEET a OF 5 EXHIBIT "A" (- .... 1 6 ;.7 - KI , HPOINT DRIVE I I NORT TI 15' UTIL I I I 24' FIRELANE ( 90' ROW DEDICATION) V2003213 25X15 1 I EASEMENT V97172 P3930 /\.n P1910 EASEM NT (l V98009 P10 ` V98008 P10 �. _ _ �1 - -71 - - -- 15' UTILITY ESMT // — - ---- — k 70'X20' WTR CAB. A SLIDE 7706 / �� / . \ — — — — V98008 P10 I / / / \\ RIGHT— . OF —WAY 22'X20' UTILITY 10' UTILITY ESMT i � �. - -__ CAB.A SLIDE 7706 CAB. SLIDE 7706 10 TU ELEC. ESMT \. , _ t • r V98193 P31 / /^,�� �/�/ — —;; _ 1 I 30' ACCESS ESMT RIGHT— / // i `�� 7� 24' FIRE — _ I y LOCATION NOT OF —WAY \`t LANE ESMT V96097 P3964, 1 ►I (DETERMINED BY DEED) / i/ ii � \ �\ 15' DRAINAGE ESMT 1 I V12367 P1221 V98017 P1875 1 I / / ii / 1 „2"*. � VACATED BY _ _ _ _ I I LOCATION NOT KNOW / / ) i � ` _ SEPARATE [ _ I— r � L AT THIS TIME 9/4/07 �i �� // <\ -., /Z �`� DOCUMENT 1 20' TXU ELEC. ESMT �i ��/ ��i I ESMT � CAB. SLIDE 7706 ii T1LITY i 10' UT10' U ELEC. ESMT �/ �� I 24' FIRE ) / TX CAB. SLIDE 7706 , /". / \ f CAB. SLIDE 7706 I LANE ESMT I � ��� ^ I 20' WATER ESMT ii i J 1 , ,\, --- I 20' TXU 1 1_ V98193 P31 . ELEC. ESMT i C 11 ( CAB. SLIDE 7706 1 / ' — 20' TXU ELEC. ESMT . ` ` L �. L h I I I CAB. SLIDE 7706 �� } I " 1 I I I 24' FIRELANE I) ( _ � ( 1 � I I I EASEMENT 11 1 30' RRELANE I I � 30' FIRELANE I I 1 1 V98193 P31 I II 1 I EASEMENT i 1 EASEMENT � I � I I 15' 11J ELEC. 11 1 1 V99028 P27 I I V99028 P27 1 1 1 EASEMENT � � I 1 i I I I I 1 1 V98193 P31 ,U I BASIS OF BEARING: THE EASTERLY UNE OF THAT PARCEL OF LAND AS DESCRIBED IN VOLUME 96097, PAGE 3964 OF THE DALLAS COUNTY RECORDS BEARS S00'43'43 "E (GRID) IN THE STATE OF TEXAS NORTH CENTRAL 4202 ZONE. SURVEYOR'S CERTIFICATE TO PARTIES INTERESTED IN TITLE TO THE PREMISES SURVEYED, I DO HEREBY CERTIFY THAT THE ABOVE LEGAL DESCRIPTION WAS PREPARED FROM PUBLIC RECORDS AND FROM AN ACTUAL AND ACCURATE SURVEY UPON THE GROUND AND THAT SAME IS TRUE AND CORRECT. '�Q' �\STER �y 4 DATE OF SURVEY: 08/23/07- 09/14/07 SEYED M. ALVANI > (0/ Q F O • ' 4 R.P.LS. NO. 5896 A/ ' 1 .' ' DATE OF SIGNATURE: 10/19/07 • 4: 5896 �.� , vr 5'l•, V: \52871 \ACTIVE \ \DRAWING \EXHIBITS \07355_251 _DFW_AP \WORKING \07355_251 _EXHIBIT_002.00.DWG SEE SHEET 2 FOR TEXAS MIDSTREAM GAS SERVICES EASEMENT INFORMATION PROPOSED PIPELINE CROSSING DFAP- 002.00 REBECCA AND EMILY RAPOPORT TRACT p p � COUNT OF DALLAS, STATE OF TEXAS EXISTING EASEMENTS DFW AP PAD ROUTE DOWNTOWN DESIGN SERVICES, INC. D BY JRP 09/17/07 SCALE: 1' v.200 3 10/19 JRP JMM ROUTE /ESMT ADJUSTMENT CHECKED B SA 09/17/07 ,� Stantec Consulting Inc. 0 100 200 `./ 2000 S Colorado Blvd 2 10/15 PDJ JMM OWNER NAME TR 2 PROJECT Ste 2 -300 ENGINEER Denver, 30 7 4 0 8 1 10/11 P03 SA REVISED PERMANENT ESMT SECTION Tel. 303,758.4058 / HEAD StintaC FF, .sl 03.75 .48 303.758.4828 REV. DATE BY APP. DESCRIPTION APPROVED BY SHEET 5 OF 5