Loading...
ST8805-CS 890417April 17, 1989 0 Ms. Vonita White Acting Superintendent Coppell Independent School District 1201 Wrangler Drive Coppe11, Texas 75019 214/471-1111 RE: JP No, 88023; Site Grading; P~rkway BouXevard and High School Access Road; Coppe11, Texas Dear Ms. White: Enclosed is a copy of the Final Payment request received from James Arnold Construction for grading work performed for street subgrades in Parkway Boulevard and the High School Access Road in the Parks of Coppell, Coppell, Texas. The total Amount of Work Done includes the Contract Amount of $17,786,00 and the additional amount of $336.00 authorized in my letter to the contractor of March 14, 1989. This additional amount is due to an increase in subgrade levels required by the paving contractor's decision to use 6-inch concrete pavement in both roadways rather than 7-inch pavement originally planned in the High School Access Road and S-inch pavement originally planned in Parkway Boulevard. Use of 6-inch pavement substantially reduces street paving costs. We have reviewed the grading in the roadways provided by the contractor. Subgrade levels have been verified by field survey and are within 0.1 feet of proposed grade. All compaction tests results are in compliance with specifications. The work was completed prior to the contract due date and the contractor has left the sit9 in a neat and orderly condition. I am not aware of any objections to the work from the City of Coppe11. However, by copy of this letter, I request that City Inspectors inform me if there is any reason that all or a portion of this final payment request should be withheld. The contractor's request is somewhat irregular since, in accordance with Section lB, Paragraph 8 of the contract, upon completion of the work the contractor should submit an invoice for 95%' of the contract amount. However, James Arnold Construction has completed the work and requests'full payment. Unless some valid objection is brought to our attention within a week of the date of this letter, full payment of $5,264.60 is recommended. 320 %Vestway mace, SUite 501 · Arlington, Texas 76018 · Metro (817)467-2418 · (817) 465-0259 Ms. Vonita White JP No. 88023 · April 17, 1989 Page 2 of 2 In accordance with the contract, final payment is due on the twentieth day of the month following a thirty day period from the date of completion. Therefore, final payment should be made no later than May 20, 1989. If you have any questions, please call. Sincere~ ~erry Parche', PiE. JP:ch Enclosure: Honthly Estimate from James Arnold Construction, April 7, 1989 cc: Mr. Jay Chester, P.E./ABQ Development Corporation ~dr, 8t~e~.l~/City of Coppell Mr. Joe Phelps/James Arnold Construction