Loading...
ST8805-CS 890404 The Cily With A Beautiful Future k~__~/ /~____.~ PRE-CONSTRUCTION PACKET Paving,Water,Sanitary Sewer & Storm Drainage Improvements. PROJECT NAME: Parkway Boulevard and High School Access Road DATE: TIME: P.O. Box 478 Coppell, Texas 75019 214 - 462- 0022 April 4, 1989 1:00 PM ATTENDANCE SleET NAME: COM?ANY: PHONE: Steve Morton Alan Blankenship Greq Lyons Jack Crawford City of Coppell L. H. Lacy L. H. Lacy Brittain & Crawford 214/471-2251 21 4/357-01 46 21 4/357-01 46 81 7/926-021 I Tom Baker Baker-Shiflett 817/478-8254 Roy Grant Baker-Shiflett 81 7/478-8'254 Tommy Thompson Jerry Parche' Baker-Shiflett 81 7/478z82'54 Jerry Parche' Conslt. Engrs~.817/467-2418 (1) CITY OF COPPELL PRE-CO{k~TRUCTION CONFERENCE PROJFL~ NA~-. Parkway Boulevard and H£~h S,chool Access Roa~ DATE.. April 4 t 1989 TI~: I: 00 PM ASSIGS~D INSPECTOR.. I. II. Steve Morton AT~_AT~%NCE-. (See Attached List) PLANS FURNISHED TO.- A) CITY B) CONTRA~ C) OWNER III. IV. Ve YES X NO UTILITY COMPLIES NOTIFIED.. A) TELEPHONE B) GAS C ) F~ECTRIC D) CABLE T.V. E) OTHER STATUS OF RIGHT-OF-WAY AND/OR LAND ~~ EASE~TPS YES HIG~NAY PERMIT YES RAILROAD PE~4IT YES STREET CUT PE~MI? YES BORING PE~4I? YES INSPECTION: A. B. Co DAILY INSPECTION BY ASSIGNED INSPECTOR AFTER ~OCmS AND WEEKENDS (OVERTI~) TO BE PAID BY THE C~ "AT OVERTI_N~ RATES". C0N~ AND SUB-(~ TO NOTIFY INSPECTO~ AT LW~ST T~7~qTY-FOUR (24) HOURS BEFORE WATER/SANITARY Sf~iER/STORM Sf~ER/ PAVING CONSTRUCTION BEGINS. NO X N/A N/A N/A N/A (2) VI. TESTING OF MATERIALS.' 1. DENSITIES 2. . APPROVED CONCRETE BATCH DESIGN 3. CONCRETE PAVING INCLUDING CORES 4. APPROVED ASPHALT BATCH EESIGN VII. SEND ONE COPY OF THE TEST P~ TO ~ INSP~ STREET CLf]SING REQUIRED: YES IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE AND FIRE D~P~ SEVENTY-TWO (72) HOURS IN X VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL-. A. REQUIRED B. TRAFFIC DETOUR C. WARNING LIGHTS IF STREET DEPART~ HAS TO C(X~ OUT TO MOVE THE BARRICADES AND/OR REPLACE ANY BARRICADES, THE C(~TPJ~fOR WILL BE CHARGED FOR THEIR TI~. IX. AS-BUILT PLANS .- CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR SUbMITtING THE CORR~C~ "AS-BUILT" PLANS TO THE CITY. Xe INFORMATION .- DEVELOPER-. ADDRESS-. PROJECT MANAGER.- Coppell Independent School District CQ~pell, Texas 75019 1201 Wrangler Dr., 214/471-1111 CONSULTING ENGINRRR.- NA~.. ADDRESS.. PHONE .- PROJECT ENGINEER: Jerry Parche' Consultlnq Enqineers 320 Westway Pl.t Ste. 501, Arlinqton, 817/467-2418 Jerry Parche' TX o 76018 (3) Nb~= ~a H. Lacy Company ADORESS, 10888 Shady Tr~%l. Dallas~ Texas 75354 PHONEs 214/357-0146 SUPERINTENDENTs Alan Blankenship EXCAVATING CONTRACTOR~ NA~ James Arnold Construct~Qp AEORESS~ ..p O Box 15]Q4~, Irving~ T~y~s 7~0~1 PHONE~ 214/263-4097 SUPERI~~ J~mes Arnol~ PAVING CO~: SUPERINTENDENTs Sa~e as' General AS-BUILT DR~NI~ - UTILITIES 1 - MYLAR 3 - BLUE LINES AS-BUILT DR/~NING~ - PAVING. DRAINAGE I - MYLAR 3 - BLUE LINES MAINTENANCE BOND - UTILITIES PRO-RATA WORK SHEET COMPLETED/ STREET ASS~ WATER AND S~ER FINALED PAVING AND DRAINAGE FINALED ' LETTER OF ACCEPTANCE WRITTEN LETTER OF ~EPTANCE WIL5 ~ ~ ~W~,ITI~N UNTIL THE F4NCH LIST MaDE THE WALK-~ HAS BEEN ~D AND RE-INSP~D BY T}{E ~ESPECTIVE DEPART~. THIS INCLUDES SUBMITTING.' AS-BUILTS, - BGNE~, AND PAYING PRO-RATA. PRE-CONSTRUCTION NOTES DEFICIENT PAVE~F_,NT, STRENG'iT{, THICKNESS SCREEN WALL. DISCUSS ANY CH~_ -~ IN DESIGN - ~ BE IN WRITING F~ DEVEDOPER'S ENGIMEER TO THE CITY OF COPPELL ENGINEERING DEPARTS. CONSTRUCTION WATER - NOT AVAILABLE UNTIL PRESSURE TEST AND BACTERI(~CAL COR-TEN BOLTS IN FI~INGS. FIRE HYDRANT BURY LINE AT TOP OF CURB OR HIGHER. STEPS IN MANHOLES. WATEROUS VALVES AND HYDRANTS OR APPROVED EQUAL. 4' BURY ON HYDRANTS. FORD DOUBLE CH~CK ~ LOOP (SEE CITY SPECIFICATIONS). CITY OF COPPELL ~ENERAL CONSTRUCTION SPECIFICATIONS AVAILABLE AT THE ENGINEERING DEPt. TEMPORARY SANITARY FACILILTIES. CONSTRUCTION HOURS AND TRAFFIC CONTROL CONSTRICTIONS (HC~'~S ]. LANDSCAPE ~I~NT. (5)