ST8805-CS 890404 The Cily With A Beautiful Future
k~__~/ /~____.~ PRE-CONSTRUCTION PACKET
Paving,Water,Sanitary Sewer &
Storm Drainage Improvements.
PROJECT NAME: Parkway Boulevard and High
School Access Road
DATE:
TIME:
P.O. Box 478
Coppell, Texas 75019
214 - 462- 0022
April 4, 1989
1:00 PM
ATTENDANCE SleET
NAME: COM?ANY: PHONE:
Steve Morton
Alan Blankenship
Greq Lyons
Jack Crawford
City of Coppell
L. H. Lacy
L. H. Lacy
Brittain & Crawford
214/471-2251
21 4/357-01 46
21 4/357-01 46
81 7/926-021 I
Tom Baker
Baker-Shiflett
817/478-8254
Roy Grant
Baker-Shiflett
81 7/478-8'254
Tommy Thompson
Jerry Parche'
Baker-Shiflett
81 7/478z82'54
Jerry Parche' Conslt. Engrs~.817/467-2418
(1)
CITY OF COPPELL
PRE-CO{k~TRUCTION CONFERENCE
PROJFL~ NA~-. Parkway Boulevard and H£~h S,chool Access Roa~
DATE.. April 4 t 1989
TI~: I: 00 PM
ASSIGS~D INSPECTOR..
I.
II.
Steve Morton
AT~_AT~%NCE-. (See Attached List)
PLANS FURNISHED TO.- A) CITY
B) CONTRA~
C) OWNER
III.
IV.
Ve
YES X NO
UTILITY COMPLIES NOTIFIED..
A) TELEPHONE
B) GAS
C ) F~ECTRIC
D) CABLE T.V.
E) OTHER
STATUS OF RIGHT-OF-WAY AND/OR LAND ~~
EASE~TPS YES
HIG~NAY PERMIT YES
RAILROAD PE~4IT YES
STREET CUT PE~MI? YES
BORING PE~4I? YES
INSPECTION:
A.
B.
Co
DAILY INSPECTION BY ASSIGNED INSPECTOR
AFTER ~OCmS AND WEEKENDS (OVERTI~) TO
BE PAID BY THE C~ "AT OVERTI_N~
RATES".
C0N~ AND SUB-(~ TO NOTIFY
INSPECTO~ AT LW~ST T~7~qTY-FOUR (24) HOURS
BEFORE WATER/SANITARY Sf~iER/STORM Sf~ER/
PAVING CONSTRUCTION BEGINS.
NO X
N/A
N/A
N/A
N/A
(2)
VI.
TESTING OF MATERIALS.'
1. DENSITIES
2. . APPROVED CONCRETE BATCH DESIGN
3. CONCRETE PAVING INCLUDING CORES
4. APPROVED ASPHALT BATCH EESIGN
VII.
SEND ONE COPY OF THE TEST P~ TO ~ INSP~
STREET CLf]SING REQUIRED: YES
IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE
AND FIRE D~P~ SEVENTY-TWO (72) HOURS IN
X
VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL-.
A. REQUIRED
B. TRAFFIC DETOUR
C. WARNING LIGHTS
IF STREET DEPART~ HAS TO C(X~ OUT TO MOVE
THE BARRICADES AND/OR REPLACE ANY BARRICADES,
THE C(~TPJ~fOR WILL BE CHARGED FOR THEIR TI~.
IX.
AS-BUILT PLANS .-
CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR
SUbMITtING THE CORR~C~ "AS-BUILT" PLANS TO THE CITY.
Xe
INFORMATION .-
DEVELOPER-.
ADDRESS-.
PROJECT MANAGER.-
Coppell Independent School District
CQ~pell, Texas 75019
1201 Wrangler Dr.,
214/471-1111
CONSULTING ENGINRRR.-
NA~..
ADDRESS..
PHONE .-
PROJECT ENGINEER:
Jerry Parche' Consultlnq Enqineers
320 Westway Pl.t Ste. 501, Arlinqton,
817/467-2418
Jerry Parche'
TX o
76018
(3)
Nb~= ~a H. Lacy Company
ADORESS, 10888 Shady Tr~%l. Dallas~ Texas 75354
PHONEs 214/357-0146
SUPERINTENDENTs Alan Blankenship
EXCAVATING CONTRACTOR~
NA~ James Arnold Construct~Qp
AEORESS~ ..p O Box 15]Q4~, Irving~ T~y~s 7~0~1
PHONE~ 214/263-4097
SUPERI~~ J~mes Arnol~
PAVING CO~:
SUPERINTENDENTs
Sa~e as' General
AS-BUILT DR~NI~ - UTILITIES
1 - MYLAR 3 - BLUE LINES
AS-BUILT DR/~NING~ - PAVING. DRAINAGE
I - MYLAR 3 - BLUE LINES
MAINTENANCE BOND - UTILITIES
PRO-RATA WORK SHEET COMPLETED/
STREET ASS~
WATER AND S~ER FINALED
PAVING AND DRAINAGE FINALED '
LETTER OF ACCEPTANCE WRITTEN
LETTER OF ~EPTANCE WIL5 ~ ~ ~W~,ITI~N UNTIL THE F4NCH LIST MaDE
THE WALK-~ HAS BEEN ~D AND RE-INSP~D BY T}{E ~ESPECTIVE
DEPART~.
THIS INCLUDES SUBMITTING.'
AS-BUILTS, - BGNE~, AND
PAYING PRO-RATA.
PRE-CONSTRUCTION NOTES
DEFICIENT PAVE~F_,NT, STRENG'iT{, THICKNESS
SCREEN WALL.
DISCUSS ANY CH~_ -~ IN DESIGN - ~ BE IN WRITING F~ DEVEDOPER'S ENGIMEER
TO THE CITY OF COPPELL ENGINEERING DEPARTS.
CONSTRUCTION WATER - NOT AVAILABLE UNTIL PRESSURE TEST AND BACTERI(~CAL
COR-TEN BOLTS IN FI~INGS.
FIRE HYDRANT BURY LINE AT TOP OF CURB OR HIGHER.
STEPS IN MANHOLES.
WATEROUS VALVES AND HYDRANTS OR APPROVED EQUAL.
4' BURY ON HYDRANTS.
FORD DOUBLE CH~CK ~ LOOP (SEE CITY SPECIFICATIONS).
CITY OF COPPELL ~ENERAL CONSTRUCTION SPECIFICATIONS AVAILABLE AT THE
ENGINEERING DEPt.
TEMPORARY SANITARY FACILILTIES.
CONSTRUCTION HOURS AND TRAFFIC CONTROL CONSTRICTIONS (HC~'~S ].
LANDSCAPE ~I~NT.
(5)