ST8805-CS 890329Jerry Parch Consulting Engineers March 29, 1989 Mr. Russell Graeber L. H. Lacy Company 10888 Shady Trail Dallas, Texas 75354-1297 214/357-0146 RE: JP No. 88023; Construction Contract; Parkway Boulevard & High School Access Road; Parks of Coppell; Coppell, Texas Dear Russell: Enclosed is an executed copy of your construction contract with Coppell Independent School District (C.I.S.D.) for the construction of Sanitary Sewer, Water, Paving and Storm Drainage Improvements in Parkway Boulevard and the High School Access Road in Coppell, Texas. This letter is L. H. Lacy's Notice to Proceed with the contracted construction. Construction plans approved by the City of Coppell for the work contracted were sent to your office on March 20, 1989. Please advise me if you have received these plans. Currently the Site Grading Contractor is in the final stages of construction. It is anticipated that utility construction may begin in one to two weeks. Please prepare for start of your construction. These preparations should include 1. Examination of the site. Payment of the 1.5~ inspection fee required by the City of Coppell. Begin coordination with Brittain & Crawford Surveyors on survey requirements and schedules. 4. Begin coordination with Baker-Shiflett, Inc. on scheduling for utility trench backfill testing. Contact the Coppell Municipal Utility District regarding scheduling of work impacting their facilities, i.e. the sanitary sewer trunk line in Cottonwood Branch. Any other measures necessary expedite contract execution in and specifications. to begin the work and accordance with plans 320 Vv'estway Place, Suite 501 · Arlington, Texas 76018 · Metro (817) 467-2418 · (817) 465-0259 Hr. Russell Graeber JP No. 88023 Hatch 29, 1989 Page 2 of 2' Recently I had a brief discussion with your utility subcontractor, Hurray Construction, regarding trench safety measures to be implemented on this project. The trench safety provisions of the contract are extremely important and site specific as explained in Section 2C of the contract. Please insure that the utility subcontractor is familiar with all the trench safety requirements of the contract and in particular those provisions regarding submittal of the trench safety system which the contractor desires to utilize. The construction commencement date is April 10, 1989 although you are requested to proceed as soon as possible. The contract time is 120 calendar days. The contract due date is August 7, 1989.' This contract due date is extremely important. The constructed roadways will be used by faculty, students and staff members of the new Coppe11 High School as their only access when school opens in August. Prior' to the opening of the school, the constructed roadways will be used to transport furniture and other materials to the school site. Therefore, Parkway Boulevard and the.High School Access Road must be made available for use as soon as possible. The understanding and cooperation of h. H. Lacy as to the importance of these roadways to the new High School is requested and appreciated. I will contact you in the next few days in order to set up a meeting at the site with you or the pro~ect manager, and with Hr. Steve Morton - inspector for the City, the soils and testing engineer, and the surveyors. I am looking forward to working with L. H. Lacy on this pro~ect. Please call if you have any questions. Parche'., P.E. JP:ch Enclosure: cc= Executed Copy of the Construction Contract Ms. Vonita White/Coppe11 Independent School District ~r. Steve Norton/cit~.~ Mr. Russell Doyle, P.E./City of CoppeI1 Mr. Tom Baker/Baker-Shiflett, Inc. Hr Jack Crawford/Brittain & Crewford "'" Mr. Jay Chester, P.E./ABQ Development Corporation