Loading...
ST9301-LR051216 I F v Engineering n 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 7701 W Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 247066 Ms. Suzan Taylor PO Box 9478 Project No.: 059909 Coppell TX 75019 Date of Service: 12/12/2005 Report Date: 12/16/2005 Project: East Sandy Lake Road 11 ('� 4 ST 93 -01 �V4� X) ,�^ b Z �'i O Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Gauge: Troxler 3430 Test Methods: ASTM D - 2922 Moisture Density ASTM D - 3017 Gau Serial No: 35518 Current: 735 Current: 2582 Test Mode: DT Previous: 732 Previous: 2578 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Light Brown Sandy Clay w/ Limestone Fragments 11.0 122.5 Optimum +5 95 min 2 Tan crushed limestone w/ Sandy Clay 14.5 115.5 Optimum +4 98 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pct) (% max) Fill 1 East wing wall, subgrade 6" 1 13.3 132.7 117.1 96 Fill 2 West wing wall, subgrade 6" 1 14.2 135.1 118.3 97 Flex base 3 Box culvert, 50' from west end, 2nd lift 6" 2 16.5 132.7 113.9 99 Test results on this report meet project specification. 7 Technician: Joe Jernigan Started: 3:00pm Finished: 4:45pm S`� n Report Distribution: (1) City Co , "' 1 Ci of ell //I:A _ / � _ PP (1) City of Coppell K. Scott Watson, AET (I) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc ) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd )7SS Page 1 of 1 1 n Engineering E ngneer 8908 Ambassador Row, Dallas, TX 75247 f w l 1 l�• 2696 Gravel Drive, Fort Worth, TX 76118 k - = 7701 W Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 247100 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Coppell TX 75019 Date of Service: 12/13/2005 Report Date: 12/16/2005 Project: East Sandy Lake Road 104 7,2e) 544g ST 93 -01 Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: ASTM D -2922 Gauge: Troxler 3430 Moisture Density ASTM D -3017 Gauge Serial No: 35519 Current: 690 Current: 2548 Test Mode: BS Previous: 688 Previous: 2594 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Tan crushed limestone w/ Sandy Clay 14.5 115.5 Optimum +4 95 min 1 1 TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) Fill 1 Sandy Lake Road, elevation 432, 40' left, 0" 1 16.5 134.5 115.5 100 east side of box culvert Fill 2 Sandy Lake Road, elevation 432.5, 45' left, 0" 1 16.3 131.9 113.4 98 west side of box culvert Fill 3 Sandy Lake Road, elevation 432.5, 41' left, 0" 1 16.0 130.5 112.5 97 east side of box culvert Fill 4 Sandy Lake Road, elevation 433, 45' left, 0" 1 15.4 132.0 114.4 99 west side of box culvert Test results on this report meet project specification. 1,1..04/..li : Technician: Julio Perez Started: 7:30am Finished: 2:30pm "IV/ � Report Distribution: �/;�,7� 7 (1) City of Coppell j� (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 1 of 1 R o n e Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 7701 W Little York, Ste 600, Houston, TX 77040 r Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 247209 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Coppell TX 75019 Date of Service: 12/14/2005 Report Date: 12/16/2005 Project: East Sandy Lake Road 11l I 'l V./3 54 ST 93 -01 W Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: Gauge: Troxler 3430 ASTM D -2922 Moisture Density ASTM D -3017 Gauge Serial No: 33438 Current: 535 Current: 2550 Test Mode: BS Previous: 568 Previous: 2551 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Tan crushed limestone w/ Sandy Clay 14.5 115.5 Optimum +4 95 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) Fill 1 Sandy Lake Road, elevation 433, 45' left, 0" 1 16.6 134.9 115.7 100 east side of box culvert Fill 2 Sandy Lake Road, elevation 433.5, 45' left, 0" 1 16.9 132.8 113.6 98 west side of box culvert Fill 3 Sandy Lake Road, elevation 434, 44' left, 0" 1 18.2 135.5 114.6 99 Station 43 +00 on box culvert Fill 4 Sandy Lake Road, elevation 433.5, 40' left, 0" 1 14.5 132.1 115.4 100 east side of box culvert Fill 5 Sandy Lake Road, elevation 434, 43' left, 0" 1 16.0 130.5 112.5 97 west side of box culvert LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. )7TM Page 1 of 2 Report No.: 247209 11 1 kg Project No.: 059909 Client: City of Coppell TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) Fill 6 Sandy Lake Road, elevation 434, 44' left, 0" 1 14.5 131.4 114.8 99 east side of box culvert Test results on this report meet project specification. Technician time: 8:15am - 10:15am 12:OOpm - 6:OOpm / / Technician: Julio Perez Started: Finished: >/ � rA t ( - • 1 4i ft 1 Report Distribution: �, � (1 ) City of Coppell � (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 2 of 2