Loading...
ST9301-LR051122 fl Engineering Q 8908 Ambassador Row, Dallas, TX 75247 2 696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 MOISTURE DENSITY RELATIONS Client: City of Coppell Report No.: 245731 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 11/18/2005 Coppell TX 75019 Report Date: 11/22/2005 Project: East Sandy Lake Road tik\I VD 4U ST 93 -01 Services: Obtain a sample of material from the jobsite, bring the sample back to the laboratory and perform a moisture density relationship test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company DATE SAMPLED: 11/18/2005 TEST FOR: Wall Backfill MATERIAL PREPARATION: Moist MATERIAL: Light Brown Clayey Sand w /Trace RAMMER TYPE: Mechanical Limestone Fragments SAMPLED BY: D. Rogers CLASSIFICATION: Wall Backfill SAMPLE LOCATION: Stockpile west of site trailer north side TEST METHOD: ASTM D -698 ASTM D -4318 of Sandy Lake Rd Method A REPORT OF TEST MAXIMUM DRY DENSITY, pcf: 1 17.5 MOISTURE DENSITY RELATIONS 123 v rve OPTIMUM MOISTURE CONTENT, %: 10.0 Speci fic air d ids avit', cl 2.70 LIQUID LIMIT: 27 121 Dry PLASTIC LIMIT: 14 Density (pcf) PLASTICITY INDEX: 13 119 '\\ PASSING #200: 17.0 117 115 6 8 10 12 14 16 18 MOISTURE CONTENT ( %) pH = 8.16 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 06 Page 1 of 2 one Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 MOISTURE DENSITY RELATIONS Client: City of Coppell Report No.: 245730 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 11/18/2005 Coppell TX 75019 Report Date: 11/22/2005 Project: East Sandy Lake Road ST 93 -01 W Services: Obtain a sample of material from the jobsite, bring the sample back to the laboratory and perform a moisture density relationship test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company DATE SAMPLED: 11/18/2005 TEST FOR: General Fill MATERIAL PREPARATION: Moist MATERIAL: Reddish Brown Sandy Clay RAMMER TYPE: Mechanical w /Sandstone & Gravel SAMPLED BY: D. Rogers CLASSIFICATION: General Fill SAMPLE LOCATION: Stockpile south of Sandy Lake @ TEST METHOD: ASTM D -698 ASTM D -4318 Kimball Court Method B REPORT OF TEST MAXIMUM DRY DENSITY, pa: 117.5 MOISTURE DENSITY RELATIONS 118 Zero air voids c.irve OPTIMUM MOISTURE CONTENT, %: 12.5 Specific Gravity 2.70 LIQUID LIMIT: 30 116 Dry PLASTIC LIMIT: 15 Density (pcf) PLASTICITY INDEX: 15 114 % PASSING #200: 39.0 112 110 ; ` t 1 9 11 13 15 17 19 21 MOISTURE CONTENT ( %) pH = 7. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd 16 Page 1 of 2 ■ i 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 245085 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Coppell TX 75019 Date of Service: 11/09/2005 Report Date: 11/22/2005 Project: East Sandy Lake Road ST 93 -01 n ` �� c ) '�� 5 Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: ASTM D -2922 Gauge: Troxler 3430 Moisture Density ASTM D -3017 Gauge Serial No: 32719 Current: 627 Current: 2801 Test Mode: DT Previous: 636 Previous: 2766 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Light Gray Clay with gravel 20.0 105.0 Optimum +5 95 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pct) (% max) Fill 1 North retaining wall, 46' left, Station 29 +50, 6" 1 20.3 121.4 100.9 96 1st lift Fill 2 North retaining wall, 46' left, Station 27 +50, 6" 1 20.5 124.5 103.3 98 1st lift Test results on this report meet project specification. P 411 11 • Technician: Lanny Gist Started: 2:OOpm Finished: 3:45pm i RI % � > Report Distribution: O r (1) City of Coppell (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 1 of 1 8908 Ambassador Row, Dallas, TX 75247 Engineering 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 243945 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 10/24/2005 Coppell TX 75019 1,� j Reeport Date: 11/22/2005 • Project: East Sandy Lake Road / Vt" • ST93 -01 2,,451 Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN I.D.: 9616 -B MEASURED D CONCRETE SUPPLIER: Southern Star PLACEMENT DATE: 10/24/2005 (inches) PLANT: 22 WEATHER CONDITIONS: Cloudy 2.5 SPECIFICATION REQUIREMENTS TIME SAMPLED: 2:OOpm BATCH TIME: 1:30pm STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 87 F CONCRETE: 86 F SLUMP (in): 3" - 5" TRUCK NO: 5013 TICKET NO: 842385 AIR ( %): 3% - 6% AIR CONTENT ( %): 3.5 UNIT WEIGHT (pcf): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 Storm sewer inlet throat curb and gutter, Stations 38 +15 and 43 +50 except 9.1.2 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: Station 38 +15 ASTM C -39 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 1 1 10/31/2005 7 6.00 28.26 112680 3980 Unbonded Cap 1 2 11/21/2005 28 6.00 28.26 148190 5240 Unbonded Cap 1 3 11/21/2005 28 6.00 28.26 145600 5150 Unbonded Cap Average 5200 1 4 Hold / Technician: Randy Nudge Started: 1:15pm Finished: 3:15pm '414•1 e' g Report Distribution: �> , 1 (1) City of Coppell i Zeir (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. O1SS Page 1 of 1 1 8908 Ambassador Row, Dallas, TX 75247 2 696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 ,'',:`'.< b _ Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 243853 Ms. Suzan Taylor P roject No.: 059909 PO Box 9478 Date of Service: 10/21/2005 Coppell TX 75019 Report Date: 11/22/2005 Project: East Sandy Lake Road tti ql A CO ST 93 -01 Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN I.D.: 9616 -B M SLUMP D CONCRETE SUPPLIER: Southern Star PLACEMENT DATE: 10/21/2005 (inches) PLANT: 27 WEATHER CONDITIONS: Clear 3.0 SPECIFICATION REQUIREMENTS TIME SAMPLED: 2:42pm BATCH TIME: 1:35pm STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 73 F CONCRETE: 81 F SLUMP (in): 2" - 4" TRUCK NO: 8 TICKET NO: 1013066 AIR ( %): 3% - 5% AIR CONTENT ( %): 3.6 UNIT WEIGHT (pcf): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 Inlet tops, D -2 Station 24 +93 38.25 left, and F - Station 36 +92 except 9.1.2 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: D -2, Station 24 +93 ASTM C -39 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 1 1 10/28/2005 7 6.00 28.26 107110 3790 Unbonded Cap 1 2 11/18/2005 28 6.00 28.26 130800 4630 Unbonded Cap 1 3 11/18/2005 28 6.00 28.26 146000 5160 Unbonded Cap Average 4900 1 4 Hold Started: m Finished: 3:45 m - 41 Technician: Tim Stone 1:00 P p �♦/ � � Report Distribution: „F it (1) City of Coppell 41� (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 0 1SS Page 1 of 1 i one 8908 Ambassador Row, Dallas, TN 75247 2 696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 •. " z Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 243771 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Coppell TX 75019 Date of Service: 10/20/2005 Report Date: 11/22/2005 Project: East Sandy Lake Road \ rr�� 0 A� ,/� ST 93 -01 S(i° Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN I.D.: 9616 -B MEASURED SLUMP CONCRETE SUPPLIER: Southern Star PLACEMENT DATE: 10/20/2005 (inches) PLANT: 27 WEATHER CONDITIONS: Clear 4.5 SPECIFICATION REQUIREMENTS TIME SAMPLED: 3:1 Spm BATCH TIME: 2:36pm STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 84 F CONCRETE: 86 F SLUMP (in): 2" - 4" TRUCK NO: 923 TICKET NO: 1013042 AIR ( %): 3% - 5% AIR CONTENT ( %): 3.6 UNIT WEIGHT (pci): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 Inlet top, westbound Sandy Lake Road, Station 26 +12.44 except 9.1.2 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: Center of inlet mouth, ASTM C -39 REPORT OF TESTS Station 26 +12.44 Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 1 1 10/27/2005 7 6.00 28.26 96790 3420 Unbonded Cap 1 2 11/17/2005 28 6.00 28.26 128880 4560 Unbonded Cap 1 3 11/17/2005 28 6.00 28.26 125480 4440 Unbonded Cap Average 4500 1 4 Hold `� . 1 Technician: Nathan Witherell Started: l:l 5pm Finished: 4:15pm 1 j � " ,� I , 4 ' Report Distribution: , � . ; ; ' , (1) City of Coppell (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. OISS Page 1 of 1 Rone E E 8908 Ambassador Row, Dallas, TX 75247 2 696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 243743 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 10/20/2005 Coppell TX 75019 Report Date: 11/22/2005 I Project: East Sandy Lake Road 1 t 95 -A /I ST 93 -01 ° Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN I.D.: 1851 M SLUMP D CONCRETE SUPPLIER: Tiseo/LMC PLACEMENT DATE: 10/20/2005 (inches) PLANT: 7 WEATHER CONDITIONS: Clear 2.5 SPECIFICATION REQUIREMENTS TIME SAMPLED: 12:O3pm BATCH TIME: 11:O6am STRENGTH: 3600 psi @ 28 Days TEMPERATURE (F) - AIR 83 F CONCRETE: 81 F SLUMP (in): 3" - 5" TRUCK NO: 100 TICKET NO: 7157521 AIR ( %): 4% - 6% AIR CONTENT ( %): 3.8 UNIT WEIGHT (pcf): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 Driveways, westbound Sandy Lake Road, east end driveway at Sandy Lake and Trinity except 9.12 Court, Station 65 +83.5; driveway 6, Station 39 +30; new development driveway, Station ASTM C -143 34 +50; driveway 3, Station 30 +50 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: East end driveway, Station 65 +83.5 ASTM C -39 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 1 1 10/24/2005 4 6.00 28.26 97010 3430 Unbonded Cap 1 2 10/27/2005 7 6.00 28.26 112510 3980 Unbonded Cap 1 3 11/17/2005 28 6.00 28.26 138640 4900 Unbonded Cap 1 4 11/17/2005 28 6.00 28.26 137100 4850 Unbonded Cap Average 4880 1 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. o1SS Page 1 of 2